[{"data":1,"prerenderedAt":4344},["ShallowReactive",2],{"blog-post-nl-oud-arei-part-8":3,"blog-alternates-old-building-arei-part8":959},{"id":4,"title":5,"articleId":6,"body":7,"category":936,"date":937,"description":938,"extension":939,"lastUpdated":940,"locale":941,"meta":942,"navigation":943,"path":944,"publishDate":937,"readTime":945,"refreshInterval":946,"seo":947,"slug":948,"stem":949,"tags":950,"__hash__":958},"blog\u002Fblog\u002Fold-building-arei-part8.nl.md","Oudere installaties en AREI Part 8: Bijzondere regels voor bestaande installaties","old-building-arei-part8",{"type":8,"value":9,"toc":896},"minimark",[10,14,23,26,31,38,49,58,60,64,71,76,79,83,90,94,122,130,132,136,139,143,187,191,227,239,243,246,276,280,287,291,312,316,319,321,325,332,336,430,434,437,463,465,469,473,480,484,491,503,507,577,592,594,598,605,609,616,638,642,660,662,666,673,677,691,695,706,710,721,725,787,789,793,847,849,853,880,882],[11,12,5],"h1",{"id":13},"oudere-installaties-en-arei-part-8-bijzondere-regels-voor-bestaande-installaties",[15,16,17,18,22],"p",{},"Niet elke elektrische installatie in België moet aan de nieuwste AREI-voorschriften voldoen. Voor oudere gebouwen bestaat er met ",[19,20,21],"strong",{},"Part 8 (Partie 8)"," een apart regelwerk dat bepaalde afwijkingen van de huidige standaard tolereert — zolang er geen onmiddellijk gevaar bestaat. Dit artikel legt uit wanneer Part 8 geldt, wat toegelaten is en waar de grenzen liggen.",[24,25],"hr",{},[27,28,30],"h2",{"id":29},"wat-is-part-8","Wat is Part 8?",[15,32,33,34,37],{},"Part 8 van het AREI (Algemeen Reglement op de Elektrische Installaties) is een ",[19,35,36],{},"bijzondere regeling voor bestaande installaties"," die vóór de inwerkingtreding van het huidige AREI werden aangelegd en gekeurd.",[15,39,40,41,44,45,48],{},"Het basisprincipe: zolang een installatie ",[19,42,43],{},"veilig"," functioneert en ",[19,46,47],{},"geen onmiddellijk gevaar"," vormt, hoeft ze niet volledig op de nieuwste stand gebracht te worden — ook al voldoet ze niet aan alle huidige voorschriften.",[50,51,52],"blockquote",{},[15,53,54,57],{},[19,55,56],{},"Belangrijk:"," Part 8 is geen vrijbrief. Het definieert duidelijk welke afwijkingen getolereerd worden en welke niet.",[24,59],{},[27,61,63],{"id":62},"wanneer-geldt-part-8","Wanneer geldt Part 8?",[15,65,66,67,70],{},"Part 8 geldt voor installaties die aan ",[19,68,69],{},"één"," van de volgende voorwaarden voldoen:",[72,73,75],"h3",{"id":74},"voorwaarde-1-installatie-vóór-01101981","Voorwaarde 1: Installatie vóór 01.10.1981",[15,77,78],{},"Installaties die vóór 1 oktober 1981 werden aangelegd (datum van inwerkingtreding van het oorspronkelijke AREI) vallen in principe onder Part 8.",[72,80,82],{"id":81},"voorwaarde-2-onder-het-oude-arei-gekeurd","Voorwaarde 2: Onder het oude AREI gekeurd",[15,84,85,86,89],{},"Installaties die onder een eerdere versie van het AREI werden gekeurd en sindsdien ",[19,87,88],{},"niet wezenlijk gewijzigd"," zijn.",[72,91,93],{"id":92},"wat-telt-als-wezenlijke-wijziging","Wat telt als \"wezenlijke wijziging\"?",[95,96,97,104,110,116],"ul",{},[98,99,100,101],"li",{},"Toevoegen van ",[19,102,103],{},"nieuwe kringen",[98,105,106,107],{},"Uitbreiding van de ",[19,108,109],{},"verdeelkast",[98,111,112,113],{},"Wijziging van de ",[19,114,115],{},"meterinstallatie",[98,117,118,119],{},"Omvangrijke ",[19,120,121],{},"herbekabeling",[50,123,124],{},[15,125,126,129],{},[19,127,128],{},"Let op:"," Kleine wijzigingen zoals het vervangen van een stopcontact of schakelaar gelden NIET als wezenlijke wijziging.",[24,131],{},[27,133,135],{"id":134},"wat-is-onder-part-8-toegelaten-getolereerde-afwijkingen","Wat is onder Part 8 toegelaten? (Getolereerde afwijkingen)",[15,137,138],{},"De volgende punten wijken af van het huidige AREI, maar worden onder Part 8 bij de keuring getolereerd:",[72,140,142],{"id":141},"_1-oude-kabeltypes","1. Oude kabeltypes",[144,145,146,159],"table",{},[147,148,149],"thead",{},[150,151,152,156],"tr",{},[153,154,155],"th",{},"Huidig AREI",[153,157,158],{},"Part 8 tolereert",[160,161,162,171,179],"tbody",{},[150,163,164,168],{},[165,166,167],"td",{},"XVB \u002F VOBst in Preflex",[165,169,170],{},"VOB-kabels in oude leidingen",[150,172,173,176],{},[165,174,175],{},"Cca-brandveiligheidsklasse",[165,177,178],{},"Oudere kabeltypes zonder CPR-classificatie",[150,180,181,184],{},[165,182,183],{},"Minimale doorsnede 2,5 mm² voor stopcontacten",[165,185,186],{},"Minimaal 1 mm² bij max. 6 A zekering of 10 A automaat (Art. 8.2.1 Nr. 5)",[72,188,190],{"id":189},"_2-aardlekschakelaars-rcd-differentieelschakelaar","2. Aardlekschakelaars (RCD \u002F Differentieelschakelaar)",[144,192,193,201],{},[147,194,195],{},[150,196,197,199],{},[153,198,155],{},[153,200,158],{},[160,202,203,211,219],{},[150,204,205,208],{},[165,206,207],{},"30 mA RCD per stopcontactkring",[165,209,210],{},"Geen 30 mA RCD nodig (alleen 300 mA hoofd-RCD)",[150,212,213,216],{},[165,214,215],{},"30 mA RCD voor badkamer verplicht",[165,217,218],{},"Blijft verplicht (niet gedekt door de Part 8-afwijking, Art. 4.2.4.3 b nr. 3 \u002F Art. 7.1.4.3)",[150,220,221,224],{},[165,222,223],{},"Max. 8 kringen per RCD",[165,225,226],{},"Meer kringen toegelaten",[50,228,229],{},[15,230,231,234,235,238],{},[19,232,233],{},"Opmerking:"," Ook onder Part 8 wordt een ",[19,236,237],{},"300 mA hoofd-RCD"," aanbevolen en bij nieuwe meterinstallatie vaak door de netbeheerder vereist.",[72,240,242],{"id":241},"_3-stopcontacten-zonder-aardingcontact","3. Stopcontacten zonder aardingcontact",[15,244,245],{},"Oude stopcontacten (type C, zonder aardpen) worden onder Part 8 getolereerd, op voorwaarde dat:",[95,247,248,255,262,273],{},[98,249,250,251,254],{},"Het stopcontact beschermd wordt door een ",[19,252,253],{},"differentieelschakelaar met hoge of zeer hoge gevoeligheid"," (max. 30 mA) (Art. 8.2.1 nr. 6 letter b).",[98,256,257,258,261],{},"Geen toestellen van ",[19,259,260],{},"beschermingsklasse I"," (met metalen behuizing) worden aangesloten.",[98,263,264,265,268,269,272],{},"Het stopcontact niet in de ",[19,266,267],{},"badkamer"," of op ",[19,270,271],{},"vochtige plaatsen"," zit.",[98,274,275],{},"De kring verder intact is.",[72,277,279],{"id":278},"_4-geen-spd-overspanningsbeveiliging","4. Geen SPD (overspanningsbeveiliging)",[15,281,282,283,286],{},"Het huidige AREI schrijft voor nieuwe installaties een SPD (Surge Protection Device) Type 2 voor. Onder Part 8 is dit ",[19,284,285],{},"niet vereist",".",[72,288,290],{"id":289},"_5-oude-verdeeltechniek","5. Oude verdeeltechniek",[95,292,293,299,305],{},[98,294,295,298],{},[19,296,297],{},"Smeltzekeringen"," in plaats van MCBs zijn toegelaten.",[98,300,301,304],{},[19,302,303],{},"Schroefzekeringen"," (Diazed) worden getolereerd.",[98,306,307,308,311],{},"Ontbrekende ",[19,309,310],{},"opschriften"," worden als gebrek vermeld, maar leiden niet tot afkeuring.",[72,313,315],{"id":314},"_6-geen-brandveiligheidsclassificatie-van-kabels","6. Geen brandveiligheidsclassificatie van kabels",[15,317,318],{},"Kabels zonder CPR-classificatie (vóór 2017 geïnstalleerd) worden getolereerd, aangezien de CPR-verordening pas vanaf juli 2017 voor nieuwe installaties geldt.",[24,320],{},[27,322,324],{"id":323},"wat-is-niet-toegelaten-ook-onder-part-8","Wat is NIET toegelaten (ook onder Part 8)?",[15,326,327,328,331],{},"Bepaalde toestanden worden ",[19,329,330],{},"nooit getolereerd",", ongeacht de ouderdom van de installatie:",[72,333,335],{"id":334},"absoluut-ongeoorloofd","Absoluut ongeoorloofd:",[144,337,338,348],{},[147,339,340],{},[150,341,342,345],{},[153,343,344],{},"Toestand",[153,346,347],{},"Waarom?",[160,349,350,360,370,380,390,400,410,420],{},[150,351,352,357],{},[165,353,354],{},[19,355,356],{},"Blote of beschadigde kabels",[165,358,359],{},"Onmiddellijk elektrocutiegevaar",[150,361,362,367],{},[165,363,364],{},[19,365,366],{},"Volledig ontbrekende aarding",[165,368,369],{},"Geen bescherming bij isolatiefout",[150,371,372,377],{},[165,373,374],{},[19,375,376],{},"Water in contact met elektriciteit",[165,378,379],{},"Levensgevaar",[150,381,382,387],{},[165,383,384],{},[19,385,386],{},"Toegankelijke spanningvoerende delen",[165,388,389],{},"Direct aanrakingsrisico",[150,391,392,397],{},[165,393,394],{},[19,395,396],{},"Oververhitte kabels of verbindingen",[165,398,399],{},"Brandgevaar",[150,401,402,407],{},[165,403,404],{},[19,405,406],{},"Losse verbindingen in aftakdozen",[165,408,409],{},"Vlamboog-\u002Fbrandgevaar",[150,411,412,417],{},[165,413,414],{},[19,415,416],{},"Aftakdozen zonder deksel",[165,418,419],{},"Aanrakingsbescherming ontbreekt",[150,421,422,427],{},[165,423,424],{},[19,425,426],{},"Badkamer-stopcontact in zone 0 of 1",[165,428,429],{},"Levensgevaar, ook onder Part 8 verboden",[72,431,433],{"id":432},"veiligheidsgerelateerde-minimumvereisten","Veiligheidsgerelateerde minimumvereisten:",[15,435,436],{},"Ook onder Part 8 moet gewaarborgd zijn:",[95,438,439,445,451,457],{},[98,440,441,444],{},[19,442,443],{},"Voldoende doorsnede"," voor de werkelijke belasting (geen overbelast 0,75 mm²-kabel).",[98,446,447,450],{},[19,448,449],{},"Werkende zekeringen"," (geen \"overbrugde\" zekeringen).",[98,452,453,456],{},[19,454,455],{},"Aarding van de hoofdverdeler"," (verbinding met aardingselektrode).",[98,458,459,462],{},[19,460,461],{},"Toegankelijkheid"," van de verdeelkast.",[24,464],{},[27,466,468],{"id":467},"periodieke-keuring","Periodieke keuring",[72,470,472],{"id":471},"elke-25-jaar-verplicht","Elke 25 jaar verplicht",[15,474,475,476,479],{},"Bestaande installaties onder Part 8 moeten elke ",[19,477,478],{},"25 jaar"," een periodieke keuring ondergaan door een erkend controleorganisme.",[72,481,483],{"id":482},"bij-eigendomsoverdracht","Bij eigendomsoverdracht",[15,485,486,487,490],{},"Bij ",[19,488,489],{},"verkoop van een woning"," is een geldig keuringsattest (minder dan 25 jaar oud) verplicht. Ontbreekt dit, dan moet vóór de verkoop een keuring plaatsvinden.",[50,492,493],{},[15,494,495,498,499,502],{},[19,496,497],{},"18-maandentermijn (Art. 8.4.2.2):"," Bij aankoop van een woning met een negatief keuringsverslag heeft de koper ",[19,500,501],{},"18 maanden"," vanaf de aankoopdatum om de gebreken te verhelpen en een herkeuring te laten uitvoeren.",[72,504,506],{"id":505},"wat-wordt-bij-de-periodieke-keuring-gecontroleerd","Wat wordt bij de periodieke keuring gecontroleerd?",[144,508,509,519],{},[147,510,511],{},[150,512,513,516],{},[153,514,515],{},"Controlepunt",[153,517,518],{},"Beoordeling",[160,520,521,529,537,545,553,561,569],{},[150,522,523,526],{},[165,524,525],{},"Visuele inspectie kabels en verbindingen",[165,527,528],{},"Beschadiging, oververhitting",[150,530,531,534],{},[165,532,533],{},"Aardingsweerstand meten",[165,535,536],{},"≤ 30 Ω (reglementaire drempel conform Art. 4.2.4.3b; daarboven bijkomende beschermingsmaatregelen nodig)",[150,538,539,542],{},[165,540,541],{},"Isolatieweerstand meten",[165,543,544],{},"> 0,5 MΩ",[150,546,547,550],{},[165,548,549],{},"RCD-test (indien aanwezig)",[165,551,552],{},"Uitschakeltijd en -stroom",[150,554,555,558],{},[165,556,557],{},"Kortsluitbeveiliging controleren",[165,559,560],{},"Zekeringen \u002F MCBs aanwezig",[150,562,563,566],{},[165,564,565],{},"Bescherming tegen direct aanraken",[165,567,568],{},"Afdekkingen, IP-bescherming",[150,570,571,574],{},[165,572,573],{},"Documentatie",[165,575,576],{},"Éénlijnschema + situatieschema aanwezig?",[50,578,579],{},[15,580,581,583,584,587,588,591],{},[19,582,233],{}," Ook onder Part 8 moeten een ",[19,585,586],{},"éénlijnschema"," en een ",[19,589,590],{},"situatieschema"," aanwezig zijn — ook als deze achteraf moeten worden opgesteld.",[24,593],{},[27,595,597],{"id":596},"de-besmettingsregel-bij-gedeeltelijke-renovatie","De besmettingsregel bij gedeeltelijke renovatie",[15,599,600,601,604],{},"Een bijzonder belangrijk aspect bij oudere gebouwen: de zogenaamde ",[19,602,603],{},"besmettingsregel"," (contamination rule).",[72,606,608],{"id":607},"hoe-werkt-het","Hoe werkt het?",[15,610,611,612,615],{},"Wanneer u een deel van uw installatie ",[19,613,614],{},"wezenlijk wijzigt"," (bijv. nieuwe kringen toevoegen), geldt:",[617,618,619,626,632],"ol",{},[98,620,621,622,625],{},"Het ",[19,623,624],{},"nieuwe deel"," moet volledig voldoen aan het huidige AREI.",[98,627,621,628,631],{},[19,629,630],{},"bestaande deel"," wordt verder beoordeeld volgens Part 8.",[98,633,634,637],{},[19,635,636],{},"MAAR:"," Als het nieuwe deel het bestaande deel \"besmet\" (bijv. nieuwe kabels in dezelfde verdeelkast), kan de controleur beslissen dat de hele verdeelkast aan het huidige AREI moet voldoen.",[72,639,641],{"id":640},"praktische-gevolgen","Praktische gevolgen:",[95,643,644,650,657],{},[98,645,646,647,89],{},"Plan renovaties zo dat nieuwe en oude delen ",[19,648,649],{},"duidelijk gescheiden",[98,651,652,653,656],{},"Idealiter een ",[19,654,655],{},"aparte onderverdeler"," voor nieuwe kringen.",[98,658,659],{},"Documenteer precies wat oud en wat nieuw is.",[24,661],{},[27,663,665],{"id":664},"aanbeveling-stapsgewijze-modernisering","Aanbeveling: Stapsgewijze modernisering",[15,667,668,669,672],{},"Hoewel Part 8 afwijkingen tolereert, is een ",[19,670,671],{},"stapsgewijze modernisering"," aan te raden:",[72,674,676],{"id":675},"prioriteit-1-veiligheidskritisch","Prioriteit 1 (Veiligheidskritisch)",[95,678,679,682,685,688],{},[98,680,681],{},"300 mA hoofd-RCD bijplaatsen (indien niet aanwezig)",[98,683,684],{},"Beschadigde kabels vervangen",[98,686,687],{},"Losse verbindingen herstellen",[98,689,690],{},"Aarding controleren en eventueel verbeteren",[72,692,694],{"id":693},"prioriteit-2-aanbevolen","Prioriteit 2 (Aanbevolen)",[95,696,697,700,703],{},[98,698,699],{},"30 mA groeps-RCDs voor badkamer en keuken",[98,701,702],{},"Oude smeltzekeringen vervangen door MCBs",[98,704,705],{},"SPD Type 2 bijplaatsen",[72,707,709],{"id":708},"prioriteit-3-comfort-toekomstbestendigheid","Prioriteit 3 (Comfort + toekomstbestendigheid)",[95,711,712,715,718],{},[98,713,714],{},"Verdeelkast moderniseren (meer rijen, opschriften)",[98,716,717],{},"Stopcontacten met aarding bijplaatsen",[98,719,720],{},"Voorbereiding voor laadpaal \u002F zonnepanelen",[72,722,724],{"id":723},"kostenoriëntatie","Kostenoriëntatie",[144,726,727,737],{},[147,728,729],{},[150,730,731,734],{},[153,732,733],{},"Maatregel",[153,735,736],{},"Geschatte kosten",[160,738,739,747,755,763,771,779],{},[150,740,741,744],{},[165,742,743],{},"300 mA hoofd-RCD bijplaatsen",[165,745,746],{},"150–300 EUR",[150,748,749,752],{},[165,750,751],{},"30 mA groeps-RCD (per stuk)",[165,753,754],{},"80–150 EUR",[150,756,757,760],{},[165,758,759],{},"SPD Type 2",[165,761,762],{},"100–250 EUR",[150,764,765,768],{},[165,766,767],{},"MCB-set (10 stuks)",[165,769,770],{},"50–100 EUR",[150,772,773,776],{},[165,774,775],{},"Nieuwe 4-rijige verdeelkast (compleet)",[165,777,778],{},"500–1.500 EUR",[150,780,781,784],{},[165,782,783],{},"Volledige herbekabeling (EGW)",[165,785,786],{},"5.000–15.000 EUR",[24,788],{},[27,790,792],{"id":791},"samenvatting","Samenvatting",[144,794,795,805],{},[147,796,797],{},[150,798,799,802],{},[153,800,801],{},"Vraag",[153,803,804],{},"Antwoord",[160,806,807,815,823,831,839],{},[150,808,809,812],{},[165,810,811],{},"Moet mijn oud gebouw aan het huidige AREI voldoen?",[165,813,814],{},"Niet volledig, Part 8 staat afwijkingen toe",[150,816,817,820],{},[165,818,819],{},"Heb ik een 30 mA RCD nodig?",[165,821,822],{},"Onder Part 8 niet verplicht, maar sterk aanbevolen",[150,824,825,828],{},[165,826,827],{},"Zijn oude stopcontacten zonder aarding toegelaten?",[165,829,830],{},"Onder voorwaarden ja (geen badkamer, geen klasse-I-toestellen)",[150,832,833,836],{},[165,834,835],{},"Hoe vaak moet er gekeurd worden?",[165,837,838],{},"Elke 25 jaar + bij eigendomsoverdracht",[150,840,841,844],{},[165,842,843],{},"Wat bij gedeeltelijke renovatie?",[165,845,846],{},"Nieuw deel = huidig AREI, oud deel = Part 8 (besmettingsregel in acht nemen)",[24,848],{},[27,850,852],{"id":851},"gerelateerde-artikelen","Gerelateerde artikelen",[95,854,855,862,868,874],{},[98,856,857],{},[858,859,861],"a",{"href":860},"\u002Fblog\u002Felektrische-keuring","Elektrische keuring in België: Wat wordt gecontroleerd?",[98,863,864],{},[858,865,867],{"href":866},"\u002Fblog\u002Farei-2026-wijzigingen","Wat verandert er met het AREI 2026?",[98,869,870],{},[858,871,873],{"href":872},"\u002Fblog\u002Fpreflex-vs-vrije-bedrading","Preflex vs. vrije bedrading",[98,875,876],{},[858,877,879],{"href":878},"\u002Fblog\u002Fverdeelkast-plannen-opbouw","Verdeelkast plannen",[24,881],{},[15,883,884],{},[885,886,887,888,891,892],"em",{},"Ook voor oudere gebouwen helpt ",[19,889,890],{},"PlanElec"," om éénlijnschema en situatieschema digitaal op te bouwen. De zelfcontrole is indicatief; laat de documenten en toepasselijke afwijkingen professioneel beoordelen. ",[858,893,895],{"href":894},"\u002F","Gratis starten →",{"title":897,"searchDepth":898,"depth":898,"links":899},"",2,[900,901,907,915,919,924,928,934,935],{"id":29,"depth":898,"text":30},{"id":62,"depth":898,"text":63,"children":902},[903,905,906],{"id":74,"depth":904,"text":75},3,{"id":81,"depth":904,"text":82},{"id":92,"depth":904,"text":93},{"id":134,"depth":898,"text":135,"children":908},[909,910,911,912,913,914],{"id":141,"depth":904,"text":142},{"id":189,"depth":904,"text":190},{"id":241,"depth":904,"text":242},{"id":278,"depth":904,"text":279},{"id":289,"depth":904,"text":290},{"id":314,"depth":904,"text":315},{"id":323,"depth":898,"text":324,"children":916},[917,918],{"id":334,"depth":904,"text":335},{"id":432,"depth":904,"text":433},{"id":467,"depth":898,"text":468,"children":920},[921,922,923],{"id":471,"depth":904,"text":472},{"id":482,"depth":904,"text":483},{"id":505,"depth":904,"text":506},{"id":596,"depth":898,"text":597,"children":925},[926,927],{"id":607,"depth":904,"text":608},{"id":640,"depth":904,"text":641},{"id":664,"depth":898,"text":665,"children":929},[930,931,932,933],{"id":675,"depth":904,"text":676},{"id":693,"depth":904,"text":694},{"id":708,"depth":904,"text":709},{"id":723,"depth":904,"text":724},{"id":791,"depth":898,"text":792},{"id":851,"depth":898,"text":852},"guide","2026-04-14","Wat geldt voor oudere elektrische installaties in België. AREI Part 8 uitgelegd: toegelaten afwijkingen, periodieke keuring en tips voor stapsgewijze modernisering.","md","2026-06-05","nl",{},true,"\u002Fblog\u002Fold-building-arei-part8.nl","8 min",12,{"title":5,"description":938},"oud-arei-part-8","blog\u002Fold-building-arei-part8.nl",[951,952,953,954,955,956,957],"oudere installatie","AREI","Part 8","bestaande installatie","renovatie","keuring","periodiek","Q2-L9YGyEVSXHJVXrrZFxrVWaA4pAqO0a7-HzjHgkHo",[960,1872,2786,3697],{"id":961,"title":962,"articleId":6,"body":963,"category":936,"date":937,"description":1858,"extension":939,"lastUpdated":940,"locale":1859,"meta":1860,"navigation":943,"path":1861,"publishDate":937,"readTime":945,"refreshInterval":946,"seo":1862,"slug":1863,"stem":1864,"tags":1865,"__hash__":1871},"blog\u002Fblog\u002Fold-building-arei-part8.de.md","Altbau und AREI Part 8: Sonderregeln für bestehende Installationen",{"type":8,"value":964,"toc":1821},[965,968,974,976,980,987,998,1006,1008,1012,1019,1023,1026,1030,1037,1041,1067,1075,1077,1081,1084,1088,1125,1129,1165,1177,1181,1184,1214,1218,1224,1228,1249,1253,1256,1258,1262,1269,1273,1367,1371,1374,1400,1402,1406,1410,1417,1421,1428,1440,1444,1513,1528,1530,1534,1540,1544,1551,1572,1576,1595,1597,1601,1608,1612,1626,1630,1641,1645,1656,1660,1716,1718,1722,1776,1778,1782,1808,1810],[11,966,962],{"id":967},"altbau-und-arei-part-8-sonderregeln-für-bestehende-installationen",[15,969,970,971,973],{},"Nicht jede Elektroinstallation in Belgien muss den neuesten AREI-Vorschriften entsprechen. Für ältere Gebäude gibt es mit ",[19,972,21],{}," ein eigenes Regelwerk, das bestimmte Abweichungen vom aktuellen Standard toleriert — solange keine unmittelbare Gefahr besteht. Dieser Artikel erklärt, wann Part 8 gilt, was erlaubt ist und wo die Grenzen liegen.",[24,975],{},[27,977,979],{"id":978},"was-ist-part-8","Was ist Part 8?",[15,981,982,983,986],{},"Part 8 des AREI (Allgemeines Reglement über die Elektrischen Installationen \u002F Règlement Général sur les Installations Électriques) ist eine ",[19,984,985],{},"Sonderregelung für bestehende Installationen",", die vor Inkrafttreten des aktuellen AREI errichtet und abgenommen wurden.",[15,988,989,990,993,994,997],{},"Das Grundprinzip: Solange eine Installation ",[19,991,992],{},"sicher"," funktioniert und ",[19,995,996],{},"keine unmittelbare Gefahr"," darstellt, muss sie nicht vollständig auf den neuesten Stand gebracht werden — auch wenn sie nicht allen aktuellen Vorschriften entspricht.",[50,999,1000],{},[15,1001,1002,1005],{},[19,1003,1004],{},"Wichtig:"," Part 8 ist kein Freibrief. Es definiert klar, welche Abweichungen toleriert werden und welche nicht.",[24,1007],{},[27,1009,1011],{"id":1010},"wann-gilt-part-8","Wann gilt Part 8?",[15,1013,1014,1015,1018],{},"Part 8 gilt für Installationen, die ",[19,1016,1017],{},"eine"," der folgenden Bedingungen erfüllen:",[72,1020,1022],{"id":1021},"bedingung-1-installation-vor-dem-01101981","Bedingung 1: Installation vor dem 01.10.1981",[15,1024,1025],{},"Installationen, die vor dem 1. Oktober 1981 errichtet wurden (Datum des Inkrafttretens des ursprünglichen AREI), fallen grundsätzlich unter Part 8.",[72,1027,1029],{"id":1028},"bedingung-2-unter-dem-alten-arei-abgenommen","Bedingung 2: Unter dem alten AREI abgenommen",[15,1031,1032,1033,1036],{},"Installationen, die unter einer früheren Version des AREI abgenommen wurden und seit der letzten Abnahme ",[19,1034,1035],{},"nicht wesentlich verändert"," wurden.",[72,1038,1040],{"id":1039},"was-zählt-als-wesentliche-änderung","Was zählt als „wesentliche Änderung\"?",[95,1042,1043,1049,1055,1061],{},[98,1044,1045,1046],{},"Hinzufügen ",[19,1047,1048],{},"neuer Stromkreise",[98,1050,1051,1052],{},"Erweiterung des ",[19,1053,1054],{},"Verteilerkastens",[98,1056,1057,1058],{},"Änderung der ",[19,1059,1060],{},"Zähleranlage",[98,1062,1063,1064],{},"Umfangreiche ",[19,1065,1066],{},"Umverdrahtung",[50,1068,1069],{},[15,1070,1071,1074],{},[19,1072,1073],{},"Achtung:"," Kleine Änderungen wie der Austausch einer Steckdose oder eines Schalters gelten NICHT als wesentliche Änderung.",[24,1076],{},[27,1078,1080],{"id":1079},"was-ist-unter-part-8-erlaubt-tolerierte-abweichungen","Was ist unter Part 8 erlaubt? (Tolerierte Abweichungen)",[15,1082,1083],{},"Die folgenden Punkte weichen vom aktuellen AREI ab, werden aber unter Part 8 bei der Kontrolle toleriert:",[72,1085,1087],{"id":1086},"_1-alte-kabeltypen","1. Alte Kabeltypen",[144,1089,1090,1100],{},[147,1091,1092],{},[150,1093,1094,1097],{},[153,1095,1096],{},"Aktuelles AREI",[153,1098,1099],{},"Part 8 toleriert",[160,1101,1102,1109,1117],{},[150,1103,1104,1106],{},[165,1105,167],{},[165,1107,1108],{},"VOB-Kabel in alten Leerrohren",[150,1110,1111,1114],{},[165,1112,1113],{},"Cca-Brandschutzklasse",[165,1115,1116],{},"Ältere Kabeltypen ohne CPR-Klassifizierung",[150,1118,1119,1122],{},[165,1120,1121],{},"Mindestquerschnitt 2,5 mm² für Steckdosen",[165,1123,1124],{},"Mindestens 1 mm² bei Absicherung mit max. 6 A Sicherung oder 10 A Leitungsschutzschalter",[72,1126,1128],{"id":1127},"_2-fehlerstromschutzschalter-rcd-differenzialschalter","2. Fehlerstromschutzschalter (RCD \u002F Differenzialschalter)",[144,1130,1131,1139],{},[147,1132,1133],{},[150,1134,1135,1137],{},[153,1136,1096],{},[153,1138,1099],{},[160,1140,1141,1149,1157],{},[150,1142,1143,1146],{},[165,1144,1145],{},"30 mA RCD pro Steckdosenkreis",[165,1147,1148],{},"Kein 30 mA RCD nötig (nur 300 mA Haupt-RCD)",[150,1150,1151,1154],{},[165,1152,1153],{},"30 mA RCD für Badezimmer Pflicht",[165,1155,1156],{},"Bleibt Pflicht (nicht von der Part-8-Abweichung erfasst, Art. 4.2.4.3 b Nr. 3 \u002F Art. 7.1.4.3)",[150,1158,1159,1162],{},[165,1160,1161],{},"Max. 8 Kreise pro RCD",[165,1163,1164],{},"Mehr Kreise erlaubt",[50,1166,1167],{},[15,1168,1169,1172,1173,1176],{},[19,1170,1171],{},"Hinweis:"," Auch unter Part 8 wird ein ",[19,1174,1175],{},"300 mA Haupt-RCD"," empfohlen und bei Neuinstallation des Zählers oft vom Netzbetreiber vorausgesetzt.",[72,1178,1180],{"id":1179},"_3-steckdosen-ohne-erdungskontakt","3. Steckdosen ohne Erdungskontakt",[15,1182,1183],{},"Alte Steckdosen ohne Erdungsanschluss (die modernen belgischen Steckdosen sind Typ E mit Erdungsstift) werden unter Part 8 toleriert, sofern:",[95,1185,1186,1193,1200,1211],{},[98,1187,1188,1189,1192],{},"Die Steckdose durch einen ",[19,1190,1191],{},"Fehlerstromschutzschalter mit hoher oder sehr hoher Empfindlichkeit"," (max. 30 mA) geschützt ist (Art. 8.2.1 Nr. 6 Buchstabe b).",[98,1194,1195,1196,1199],{},"Keine Geräte der ",[19,1197,1198],{},"Schutzklasse I"," (mit Metallgehäuse) angeschlossen werden.",[98,1201,1202,1203,1206,1207,1210],{},"Die Steckdose nicht im ",[19,1204,1205],{},"Badezimmer"," oder an ",[19,1208,1209],{},"feuchten Orten"," ist.",[98,1212,1213],{},"Der Stromkreis ansonsten intakt ist.",[72,1215,1217],{"id":1216},"_4-kein-spd-überspannungsschutz","4. Kein SPD (Überspannungsschutz)",[15,1219,1220,1221,286],{},"Das aktuelle AREI schreibt für Neuinstallationen einen SPD (Surge Protection Device) Typ 2 vor. Unter Part 8 ist das ",[19,1222,1223],{},"nicht erforderlich",[72,1225,1227],{"id":1226},"_5-alte-verteilertechnik","5. Alte Verteilertechnik",[95,1229,1230,1236,1242],{},[98,1231,1232,1235],{},[19,1233,1234],{},"Schmelzsicherungen"," statt MCBs sind erlaubt.",[98,1237,1238,1241],{},[19,1239,1240],{},"Drehsicherungen"," (Diazed) werden toleriert.",[98,1243,1244,1245,1248],{},"Fehlende ",[19,1246,1247],{},"Beschriftung"," wird als Mangel vermerkt, führt aber nicht zum Durchfallen.",[72,1250,1252],{"id":1251},"_6-keine-brandschutzklassifizierung-der-kabel","6. Keine Brandschutzklassifizierung der Kabel",[15,1254,1255],{},"Kabel ohne CPR-Klassifizierung (vor 2017 installiert) werden toleriert, da die CPR-Verordnung erst ab Juli 2017 für neue Installationen gilt.",[24,1257],{},[27,1259,1261],{"id":1260},"was-ist-nicht-erlaubt-auch-unter-part-8","Was ist NICHT erlaubt (auch unter Part 8)?",[15,1263,1264,1265,1268],{},"Bestimmte Zustände werden ",[19,1266,1267],{},"niemals toleriert",", unabhängig vom Alter der Installation:",[72,1270,1272],{"id":1271},"absolut-unzulässig","Absolut unzulässig:",[144,1274,1275,1285],{},[147,1276,1277],{},[150,1278,1279,1282],{},[153,1280,1281],{},"Zustand",[153,1283,1284],{},"Warum?",[160,1286,1287,1297,1307,1317,1327,1337,1347,1357],{},[150,1288,1289,1294],{},[165,1290,1291],{},[19,1292,1293],{},"Blanke oder beschädigte Kabel",[165,1295,1296],{},"Unmittelbare Stromschlaggefahr",[150,1298,1299,1304],{},[165,1300,1301],{},[19,1302,1303],{},"Fehlende Erdung komplett",[165,1305,1306],{},"Kein Schutz bei Isolationsfehler",[150,1308,1309,1314],{},[165,1310,1311],{},[19,1312,1313],{},"Wasser in Kontakt mit Elektrik",[165,1315,1316],{},"Lebensgefahr",[150,1318,1319,1324],{},[165,1320,1321],{},[19,1322,1323],{},"Zugängliche spannungsführende Teile",[165,1325,1326],{},"Direktes Berührungsrisiko",[150,1328,1329,1334],{},[165,1330,1331],{},[19,1332,1333],{},"Überhitzte Kabel oder Verbindungen",[165,1335,1336],{},"Brandgefahr",[150,1338,1339,1344],{},[165,1340,1341],{},[19,1342,1343],{},"Lose Verbindungen in Verteilerdosen",[165,1345,1346],{},"Lichtbogen-\u002FBrandgefahr",[150,1348,1349,1354],{},[165,1350,1351],{},[19,1352,1353],{},"Abzweigdosen ohne Deckel",[165,1355,1356],{},"Berührungsschutz fehlt",[150,1358,1359,1364],{},[165,1360,1361],{},[19,1362,1363],{},"Badezimmer-Steckdose in Zone 0 oder 1",[165,1365,1366],{},"Lebensgefahr, auch unter Part 8 verboten",[72,1368,1370],{"id":1369},"sicherheitsrelevante-mindestanforderungen","Sicherheitsrelevante Mindestanforderungen:",[15,1372,1373],{},"Auch unter Part 8 muss gewährleistet sein:",[95,1375,1376,1382,1388,1394],{},[98,1377,1378,1381],{},[19,1379,1380],{},"Ausreichender Querschnitt"," für die tatsächliche Belastung (kein überlastetes 0,75 mm²-Kabel).",[98,1383,1384,1387],{},[19,1385,1386],{},"Funktionierende Sicherungen"," (keine „gebrückten\" Sicherungen).",[98,1389,1390,1393],{},[19,1391,1392],{},"Erdung des Hauptverteilers"," (Verbindung zur Erdungselektrode).",[98,1395,1396,1399],{},[19,1397,1398],{},"Zugänglichkeit"," des Verteilerkastens.",[24,1401],{},[27,1403,1405],{"id":1404},"periodische-kontrolle","Periodische Kontrolle",[72,1407,1409],{"id":1408},"alle-25-jahre-pflicht","Alle 25 Jahre Pflicht",[15,1411,1412,1413,1416],{},"Bestehende Installationen unter Part 8 müssen alle ",[19,1414,1415],{},"25 Jahre"," einer periodischen Kontrolle durch einen zugelassenen Kontrollorganismus unterzogen werden.",[72,1418,1420],{"id":1419},"bei-eigentümerwechsel","Bei Eigentümerwechsel",[15,1422,1423,1424,1427],{},"Bei ",[19,1425,1426],{},"Verkauf einer Immobilie"," ist eine gültige Kontrollbescheinigung (weniger als 25 Jahre alt) Pflicht. Liegt keine vor, muss vor dem Verkauf eine Kontrolle durchgeführt werden.",[50,1429,1430],{},[15,1431,1432,1435,1436,1439],{},[19,1433,1434],{},"18-Monate-Frist (Art. 8.4.2.2):"," Bei Kauf einer Immobilie mit negativem Prüfbericht hat der Käufer ",[19,1437,1438],{},"18 Monate"," ab Kaufdatum, um die Mängel zu beheben und eine Nachkontrolle durchführen zu lassen.",[72,1441,1443],{"id":1442},"was-wird-bei-der-periodischen-kontrolle-geprüft","Was wird bei der periodischen Kontrolle geprüft?",[144,1445,1446,1456],{},[147,1447,1448],{},[150,1449,1450,1453],{},[153,1451,1452],{},"Prüfpunkt",[153,1454,1455],{},"Beurteilung",[160,1457,1458,1466,1474,1481,1489,1497,1505],{},[150,1459,1460,1463],{},[165,1461,1462],{},"Sichtprüfung der Kabel und Verbindungen",[165,1464,1465],{},"Beschädigung, Überhitzung",[150,1467,1468,1471],{},[165,1469,1470],{},"Erdungswiderstand messen",[165,1472,1473],{},"≤ 30 Ω (regulatorische Schwelle gemäß Art. 4.2.4.3b; darüber zusätzliche Schutzmaßnahmen nötig)",[150,1475,1476,1479],{},[165,1477,1478],{},"Isolationswiderstand messen",[165,1480,544],{},[150,1482,1483,1486],{},[165,1484,1485],{},"RCD-Test (falls vorhanden)",[165,1487,1488],{},"Auslösezeit und -strom",[150,1490,1491,1494],{},[165,1492,1493],{},"Kurzschlussschutz prüfen",[165,1495,1496],{},"Sicherungen \u002F MCBs vorhanden",[150,1498,1499,1502],{},[165,1500,1501],{},"Schutz gegen direktes Berühren",[165,1503,1504],{},"Abdeckungen, IP-Schutz",[150,1506,1507,1510],{},[165,1508,1509],{},"Dokumentation",[165,1511,1512],{},"Eindrahtschema + Situationsplan vorhanden?",[50,1514,1515],{},[15,1516,1517,1519,1520,1523,1524,1527],{},[19,1518,1171],{}," Auch unter Part 8 müssen ein ",[19,1521,1522],{},"Eindrahtschema"," und ein ",[19,1525,1526],{},"Situationsplan"," vorhanden sein — auch wenn diese nachträglich erstellt werden müssen.",[24,1529],{},[27,1531,1533],{"id":1532},"die-kontaminationsregel-bei-teilrenovierung","Die Kontaminationsregel bei Teilrenovierung",[15,1535,1536,1537,286],{},"Ein besonders wichtiger Aspekt bei Altbauten: die sogenannte ",[19,1538,1539],{},"Kontaminationsregel",[72,1541,1543],{"id":1542},"wie-funktioniert-sie","Wie funktioniert sie?",[15,1545,1546,1547,1550],{},"Wenn Sie einen Teil Ihrer Installation ",[19,1548,1549],{},"wesentlich verändern"," (z. B. neue Stromkreise hinzufügen), gilt:",[617,1552,1553,1560,1566],{},[98,1554,1555,1556,1559],{},"Der ",[19,1557,1558],{},"neue Teil"," muss vollständig dem aktuellen AREI entsprechen.",[98,1561,1555,1562,1565],{},[19,1563,1564],{},"bestehende Teil"," wird weiterhin nach Part 8 beurteilt.",[98,1567,1568,1571],{},[19,1569,1570],{},"ABER:"," Wenn der neue Teil den bestehenden Teil „kontaminiert\" (z. B. neue Kabel im selben Verteiler), kann der Kontrolleur entscheiden, dass der gesamte Verteiler dem aktuellen AREI entsprechen muss.",[72,1573,1575],{"id":1574},"praktische-konsequenz","Praktische Konsequenz:",[95,1577,1578,1585,1592],{},[98,1579,1580,1581,1584],{},"Planen Sie Renovierungen so, dass neue und alte Teile ",[19,1582,1583],{},"klar getrennt"," sind.",[98,1586,1587,1588,1591],{},"Idealerweise einen ",[19,1589,1590],{},"separaten Unterverteiler"," für neue Stromkreise.",[98,1593,1594],{},"Dokumentieren Sie genau, was alt und was neu ist.",[24,1596],{},[27,1598,1600],{"id":1599},"empfehlung-schrittweise-modernisierung","Empfehlung: Schrittweise Modernisierung",[15,1602,1603,1604,1607],{},"Auch wenn Part 8 Abweichungen toleriert, empfiehlt sich eine ",[19,1605,1606],{},"schrittweise Modernisierung",":",[72,1609,1611],{"id":1610},"priorität-1-sicherheitskritisch","Priorität 1 (Sicherheitskritisch)",[95,1613,1614,1617,1620,1623],{},[98,1615,1616],{},"300 mA Haupt-RCD nachrüsten (falls nicht vorhanden)",[98,1618,1619],{},"Beschädigte Kabel ersetzen",[98,1621,1622],{},"Lose Verbindungen beheben",[98,1624,1625],{},"Erdung prüfen und ggf. verbessern",[72,1627,1629],{"id":1628},"priorität-2-empfohlen","Priorität 2 (Empfohlen)",[95,1631,1632,1635,1638],{},[98,1633,1634],{},"30 mA Gruppen-RCDs für Badezimmer und Küche",[98,1636,1637],{},"Alte Schmelzsicherungen durch MCBs ersetzen",[98,1639,1640],{},"SPD Typ 2 nachrüsten",[72,1642,1644],{"id":1643},"priorität-3-komfort-zukunftssicherheit","Priorität 3 (Komfort + Zukunftssicherheit)",[95,1646,1647,1650,1653],{},[98,1648,1649],{},"Verteiler modernisieren (mehr Reihen, Beschriftung)",[98,1651,1652],{},"Steckdosen mit Erdung nachrüsten",[98,1654,1655],{},"Vorbereitung für Wallbox \u002F PV-Anlage",[72,1657,1659],{"id":1658},"kostenorientierung","Kostenorientierung",[144,1661,1662,1672],{},[147,1663,1664],{},[150,1665,1666,1669],{},[153,1667,1668],{},"Maßnahme",[153,1670,1671],{},"Geschätzte Kosten",[160,1673,1674,1681,1688,1695,1702,1709],{},[150,1675,1676,1679],{},[165,1677,1678],{},"300 mA Haupt-RCD nachrüsten",[165,1680,746],{},[150,1682,1683,1686],{},[165,1684,1685],{},"30 mA Gruppen-RCD (pro Stück)",[165,1687,754],{},[150,1689,1690,1693],{},[165,1691,1692],{},"SPD Typ 2",[165,1694,762],{},[150,1696,1697,1700],{},[165,1698,1699],{},"MCB-Set (10 Stück)",[165,1701,770],{},[150,1703,1704,1707],{},[165,1705,1706],{},"Neuer 4-Reihen-Verteiler (komplett)",[165,1708,778],{},[150,1710,1711,1714],{},[165,1712,1713],{},"Vollständige Neuverkabelung (EFH)",[165,1715,786],{},[24,1717],{},[27,1719,1721],{"id":1720},"zusammenfassung","Zusammenfassung",[144,1723,1724,1734],{},[147,1725,1726],{},[150,1727,1728,1731],{},[153,1729,1730],{},"Frage",[153,1732,1733],{},"Antwort",[160,1735,1736,1744,1752,1760,1768],{},[150,1737,1738,1741],{},[165,1739,1740],{},"Muss mein Altbau dem aktuellen AREI entsprechen?",[165,1742,1743],{},"Nicht vollständig, Part 8 erlaubt Abweichungen",[150,1745,1746,1749],{},[165,1747,1748],{},"Brauche ich einen 30 mA RCD?",[165,1750,1751],{},"Unter Part 8 nicht Pflicht, aber dringend empfohlen",[150,1753,1754,1757],{},[165,1755,1756],{},"Sind alte Steckdosen ohne Erdung erlaubt?",[165,1758,1759],{},"Unter Bedingungen ja (kein Badezimmer, keine Schutzklasse-I-Geräte)",[150,1761,1762,1765],{},[165,1763,1764],{},"Wie oft muss kontrolliert werden?",[165,1766,1767],{},"Alle 25 Jahre + bei Eigentümerwechsel",[150,1769,1770,1773],{},[165,1771,1772],{},"Was passiert bei Teilrenovierung?",[165,1774,1775],{},"Neuer Teil = aktuelles AREI, alter Teil = Part 8 (Kontaminationsregel beachten)",[24,1777],{},[27,1779,1781],{"id":1780},"verwandte-artikel","Verwandte Artikel",[95,1783,1784,1790,1796,1802],{},[98,1785,1786],{},[858,1787,1789],{"href":1788},"\u002Fde\u002Fblog\u002Felektrische-kontrolle","Elektrische Kontrolle in Belgien: Was wird geprüft?",[98,1791,1792],{},[858,1793,1795],{"href":1794},"\u002Fde\u002Fblog\u002Farei-2026-aenderungen","Was ändert sich mit dem AREI 2026?",[98,1797,1798],{},[858,1799,1801],{"href":1800},"\u002Fde\u002Fblog\u002Fpreflex-vs-freie-verlegung","Preflex vs. freie Verlegung",[98,1803,1804],{},[858,1805,1807],{"href":1806},"\u002Fde\u002Fblog\u002Fschaltschrank-planen-aufbau","Schaltschrank planen",[24,1809],{},[15,1811,1812],{},[885,1813,1814,1815,1817,1818],{},"Auch für Altbauten erstellt ",[19,1816,890],{}," normgerechte Eindrahtschemas und Situationspläne — die Pflichtdokumente für jede Kontrolle. Dokumentieren Sie Ihre Installation jetzt digital. ",[858,1819,1820],{"href":894},"Kostenlos starten →",{"title":897,"searchDepth":898,"depth":898,"links":1822},[1823,1824,1829,1837,1841,1846,1850,1856,1857],{"id":978,"depth":898,"text":979},{"id":1010,"depth":898,"text":1011,"children":1825},[1826,1827,1828],{"id":1021,"depth":904,"text":1022},{"id":1028,"depth":904,"text":1029},{"id":1039,"depth":904,"text":1040},{"id":1079,"depth":898,"text":1080,"children":1830},[1831,1832,1833,1834,1835,1836],{"id":1086,"depth":904,"text":1087},{"id":1127,"depth":904,"text":1128},{"id":1179,"depth":904,"text":1180},{"id":1216,"depth":904,"text":1217},{"id":1226,"depth":904,"text":1227},{"id":1251,"depth":904,"text":1252},{"id":1260,"depth":898,"text":1261,"children":1838},[1839,1840],{"id":1271,"depth":904,"text":1272},{"id":1369,"depth":904,"text":1370},{"id":1404,"depth":898,"text":1405,"children":1842},[1843,1844,1845],{"id":1408,"depth":904,"text":1409},{"id":1419,"depth":904,"text":1420},{"id":1442,"depth":904,"text":1443},{"id":1532,"depth":898,"text":1533,"children":1847},[1848,1849],{"id":1542,"depth":904,"text":1543},{"id":1574,"depth":904,"text":1575},{"id":1599,"depth":898,"text":1600,"children":1851},[1852,1853,1854,1855],{"id":1610,"depth":904,"text":1611},{"id":1628,"depth":904,"text":1629},{"id":1643,"depth":904,"text":1644},{"id":1658,"depth":904,"text":1659},{"id":1720,"depth":898,"text":1721},{"id":1780,"depth":898,"text":1781},"Was bei älteren Elektroinstallationen in Belgien gilt. AREI Part 8 erklärt: erlaubte Abweichungen, periodische Kontrolle und Tipps zur schrittweisen Modernisierung.","de",{},"\u002Fblog\u002Fold-building-arei-part8.de",{"title":962,"description":1858},"altbau-arei-part-8","blog\u002Fold-building-arei-part8.de",[1866,952,953,1867,1868,1869,1870],"altbau","bestandsinstallation","renovierung","kontrolle","periodisch","WDz2A426D1LVad7bgEuHPyefaCr9JZdCzjAxBg5Z9lE",{"id":1873,"title":1874,"articleId":6,"body":1875,"category":936,"date":937,"description":2772,"extension":939,"lastUpdated":940,"locale":2773,"meta":2774,"navigation":943,"path":2775,"publishDate":937,"readTime":945,"refreshInterval":946,"seo":2776,"slug":2777,"stem":2778,"tags":2779,"__hash__":2785},"blog\u002Fblog\u002Fold-building-arei-part8.en.md","Old Buildings and AREI Part 8: Special Rules for Existing Installations",{"type":8,"value":1876,"toc":2735},[1877,1880,1886,1888,1892,1899,1910,1918,1920,1924,1931,1935,1938,1942,1949,1953,1979,1987,1989,1993,1996,2000,2037,2041,2077,2088,2092,2095,2124,2128,2134,2138,2159,2163,2166,2168,2172,2179,2183,2277,2281,2284,2310,2312,2316,2320,2327,2331,2338,2350,2354,2424,2438,2440,2444,2450,2454,2461,2482,2486,2504,2506,2510,2517,2521,2535,2539,2550,2554,2565,2569,2630,2632,2636,2690,2692,2696,2722,2724],[11,1878,1874],{"id":1879},"old-buildings-and-arei-part-8-special-rules-for-existing-installations",[15,1881,1882,1883,1885],{},"Not every electrical installation in Belgium needs to comply with the latest AREI\u002FRGIE regulations. For older buildings, ",[19,1884,21],{}," provides a dedicated set of rules that tolerates certain deviations from the current standard — as long as no immediate danger exists. This article explains when Part 8 applies, what is permitted, and where the limits lie.",[24,1887],{},[27,1889,1891],{"id":1890},"what-is-part-8","What Is Part 8?",[15,1893,1894,1895,1898],{},"Part 8 of the AREI (Algemeen Reglement op de Elektrische Installaties \u002F Règlement Général sur les Installations Électriques) is a ",[19,1896,1897],{},"special regulation for existing installations"," that were constructed and approved before the current AREI came into force.",[15,1900,1901,1902,1905,1906,1909],{},"The basic principle: as long as an installation functions ",[19,1903,1904],{},"safely"," and poses ",[19,1907,1908],{},"no immediate danger",", it does not need to be fully brought up to the latest standards — even if it does not meet all current requirements.",[50,1911,1912],{},[15,1913,1914,1917],{},[19,1915,1916],{},"Important:"," Part 8 is not a free pass. It clearly defines which deviations are tolerated and which are not.",[24,1919],{},[27,1921,1923],{"id":1922},"when-does-part-8-apply","When Does Part 8 Apply?",[15,1925,1926,1927,1930],{},"Part 8 applies to installations that meet ",[19,1928,1929],{},"one"," of the following conditions:",[72,1932,1934],{"id":1933},"condition-1-installation-before-01101981","Condition 1: Installation Before 01.10.1981",[15,1936,1937],{},"Installations constructed before 1 October 1981 (the date the original AREI came into force) fall under Part 8 by default.",[72,1939,1941],{"id":1940},"condition-2-approved-under-the-old-arei","Condition 2: Approved Under the Old AREI",[15,1943,1944,1945,1948],{},"Installations that were approved under a previous version of the AREI and have ",[19,1946,1947],{},"not been substantially modified"," since the last approval.",[72,1950,1952],{"id":1951},"what-counts-as-a-substantial-modification","What Counts as a \"Substantial Modification\"?",[95,1954,1955,1961,1967,1973],{},[98,1956,1957,1958],{},"Adding ",[19,1959,1960],{},"new circuits",[98,1962,1963,1964],{},"Expanding the ",[19,1965,1966],{},"distribution board",[98,1968,1969,1970],{},"Modifying the ",[19,1971,1972],{},"metering installation",[98,1974,1975,1976],{},"Extensive ",[19,1977,1978],{},"rewiring",[50,1980,1981],{},[15,1982,1983,1986],{},[19,1984,1985],{},"Note:"," Small changes such as replacing a socket outlet or switch do NOT count as a substantial modification.",[24,1988],{},[27,1990,1992],{"id":1991},"what-is-permitted-under-part-8-tolerated-deviations","What Is Permitted Under Part 8? (Tolerated Deviations)",[15,1994,1995],{},"The following points deviate from the current AREI but are tolerated under Part 8 during inspection:",[72,1997,1999],{"id":1998},"_1-old-cable-types","1. Old Cable Types",[144,2001,2002,2012],{},[147,2003,2004],{},[150,2005,2006,2009],{},[153,2007,2008],{},"Current AREI",[153,2010,2011],{},"Part 8 tolerates",[160,2013,2014,2021,2029],{},[150,2015,2016,2018],{},[165,2017,167],{},[165,2019,2020],{},"VOB cables in old conduits",[150,2022,2023,2026],{},[165,2024,2025],{},"Cca fire reaction class",[165,2027,2028],{},"Older cable types without CPR classification",[150,2030,2031,2034],{},[165,2032,2033],{},"Minimum cross-section 2.5 mm² for sockets",[165,2035,2036],{},"Minimum 1 mm² with max. 6A fuse or 10A MCB (Art. 8.2.1 Nr. 5)",[72,2038,2040],{"id":2039},"_2-residual-current-devices-rcd","2. Residual Current Devices (RCD)",[144,2042,2043,2051],{},[147,2044,2045],{},[150,2046,2047,2049],{},[153,2048,2008],{},[153,2050,2011],{},[160,2052,2053,2061,2069],{},[150,2054,2055,2058],{},[165,2056,2057],{},"30 mA RCD per socket circuit",[165,2059,2060],{},"No 30 mA RCD needed (only 300 mA main RCD)",[150,2062,2063,2066],{},[165,2064,2065],{},"30 mA RCD mandatory for bathroom",[165,2067,2068],{},"Remains mandatory (not covered by the Part 8 deviation, Art. 4.2.4.3 b No. 3 \u002F Art. 7.1.4.3)",[150,2070,2071,2074],{},[165,2072,2073],{},"Max. 8 circuits per RCD",[165,2075,2076],{},"More circuits permitted",[50,2078,2079],{},[15,2080,2081,2083,2084,2087],{},[19,2082,1985],{}," Even under Part 8, a ",[19,2085,2086],{},"300 mA main RCD"," is recommended and often required by the grid operator when a new meter is installed.",[72,2089,2091],{"id":2090},"_3-socket-outlets-without-earth-contact","3. Socket Outlets Without Earth Contact",[15,2093,2094],{},"Old socket outlets (type C, without earth pin) are tolerated under Part 8, provided that:",[95,2096,2097,2104,2111,2121],{},[98,2098,2099,2100,2103],{},"The socket is protected by a ",[19,2101,2102],{},"high or very high sensitivity RCD"," (max. 30 mA) (Art. 8.2.1 No. 6 letter b).",[98,2105,2106,2107,2110],{},"No ",[19,2108,2109],{},"Class I"," appliances (with metal housing) are connected.",[98,2112,2113,2114,2117,2118,286],{},"The socket is not in the ",[19,2115,2116],{},"bathroom"," or in a ",[19,2119,2120],{},"damp location",[98,2122,2123],{},"The circuit is otherwise intact.",[72,2125,2127],{"id":2126},"_4-no-spd-surge-protection","4. No SPD (Surge Protection)",[15,2129,2130,2131,286],{},"The current AREI requires a Type 2 SPD (Surge Protection Device) for new installations. Under Part 8, this is ",[19,2132,2133],{},"not required",[72,2135,2137],{"id":2136},"_5-old-distribution-technology","5. Old Distribution Technology",[95,2139,2140,2146,2152],{},[98,2141,2142,2145],{},[19,2143,2144],{},"Fuses"," instead of MCBs are permitted.",[98,2147,2148,2151],{},[19,2149,2150],{},"Screw-type fuses"," (Diazed) are tolerated.",[98,2153,2154,2155,2158],{},"Missing ",[19,2156,2157],{},"labelling"," is noted as a deficiency but does not cause a failure.",[72,2160,2162],{"id":2161},"_6-no-fire-reaction-classification-of-cables","6. No Fire Reaction Classification of Cables",[15,2164,2165],{},"Cables without CPR classification (installed before 2017) are tolerated, as the CPR regulation only applies from July 2017 for new installations.",[24,2167],{},[27,2169,2171],{"id":2170},"what-is-not-permitted-even-under-part-8","What Is NOT Permitted (Even Under Part 8)?",[15,2173,2174,2175,2178],{},"Certain conditions are ",[19,2176,2177],{},"never tolerated",", regardless of the installation's age:",[72,2180,2182],{"id":2181},"absolutely-impermissible","Absolutely Impermissible:",[144,2184,2185,2195],{},[147,2186,2187],{},[150,2188,2189,2192],{},[153,2190,2191],{},"Condition",[153,2193,2194],{},"Why?",[160,2196,2197,2207,2217,2227,2237,2247,2257,2267],{},[150,2198,2199,2204],{},[165,2200,2201],{},[19,2202,2203],{},"Bare or damaged cables",[165,2205,2206],{},"Immediate electrocution risk",[150,2208,2209,2214],{},[165,2210,2211],{},[19,2212,2213],{},"Complete absence of earthing",[165,2215,2216],{},"No protection in case of insulation fault",[150,2218,2219,2224],{},[165,2220,2221],{},[19,2222,2223],{},"Water in contact with electrics",[165,2225,2226],{},"Danger to life",[150,2228,2229,2234],{},[165,2230,2231],{},[19,2232,2233],{},"Accessible live parts",[165,2235,2236],{},"Direct contact risk",[150,2238,2239,2244],{},[165,2240,2241],{},[19,2242,2243],{},"Overheated cables or connections",[165,2245,2246],{},"Fire risk",[150,2248,2249,2254],{},[165,2250,2251],{},[19,2252,2253],{},"Loose connections in junction boxes",[165,2255,2256],{},"Arc\u002Ffire risk",[150,2258,2259,2264],{},[165,2260,2261],{},[19,2262,2263],{},"Junction boxes without covers",[165,2265,2266],{},"Contact protection missing",[150,2268,2269,2274],{},[165,2270,2271],{},[19,2272,2273],{},"Bathroom socket in zone 0 or 1",[165,2275,2276],{},"Danger to life, prohibited even under Part 8",[72,2278,2280],{"id":2279},"safety-related-minimum-requirements","Safety-Related Minimum Requirements:",[15,2282,2283],{},"Even under Part 8, the following must be ensured:",[95,2285,2286,2292,2298,2304],{},[98,2287,2288,2291],{},[19,2289,2290],{},"Adequate cross-section"," for the actual load (no overloaded 0.75 mm² cable).",[98,2293,2294,2297],{},[19,2295,2296],{},"Functioning fuses"," (no \"bridged\" fuses).",[98,2299,2300,2303],{},[19,2301,2302],{},"Earthing of the main board"," (connection to earth electrode).",[98,2305,2306,2309],{},[19,2307,2308],{},"Accessibility"," of the distribution board.",[24,2311],{},[27,2313,2315],{"id":2314},"periodic-inspection","Periodic Inspection",[72,2317,2319],{"id":2318},"every-25-years-mandatory","Every 25 Years Mandatory",[15,2321,2322,2323,2326],{},"Existing installations under Part 8 must undergo a periodic inspection every ",[19,2324,2325],{},"25 years"," by an approved control body.",[72,2328,2330],{"id":2329},"on-change-of-ownership","On Change of Ownership",[15,2332,2333,2334,2337],{},"When ",[19,2335,2336],{},"selling a property",", a valid inspection certificate (less than 25 years old) is mandatory. If none exists, an inspection must be carried out before the sale.",[50,2339,2340],{},[15,2341,2342,2345,2346,2349],{},[19,2343,2344],{},"18-month deadline (Art. 8.4.2.2):"," When purchasing a property with a negative inspection report, the buyer has ",[19,2347,2348],{},"18 months"," from the purchase date to remedy the defects and have a re-inspection carried out.",[72,2351,2353],{"id":2352},"what-is-checked-during-the-periodic-inspection","What Is Checked During the Periodic Inspection?",[144,2355,2356,2366],{},[147,2357,2358],{},[150,2359,2360,2363],{},[153,2361,2362],{},"Inspection Point",[153,2364,2365],{},"Assessment",[160,2367,2368,2376,2384,2392,2400,2408,2416],{},[150,2369,2370,2373],{},[165,2371,2372],{},"Visual inspection of cables and connections",[165,2374,2375],{},"Damage, overheating",[150,2377,2378,2381],{},[165,2379,2380],{},"Earth resistance measurement",[165,2382,2383],{},"≤ 30 Ohm (regulatory threshold per Art. 4.2.4.3b; above this, additional protective measures required)",[150,2385,2386,2389],{},[165,2387,2388],{},"Insulation resistance measurement",[165,2390,2391],{},"> 0.5 MOhm",[150,2393,2394,2397],{},[165,2395,2396],{},"RCD test (if present)",[165,2398,2399],{},"Trip time and current",[150,2401,2402,2405],{},[165,2403,2404],{},"Short-circuit protection check",[165,2406,2407],{},"Fuses \u002F MCBs present",[150,2409,2410,2413],{},[165,2411,2412],{},"Protection against direct contact",[165,2414,2415],{},"Covers, IP protection",[150,2417,2418,2421],{},[165,2419,2420],{},"Documentation",[165,2422,2423],{},"Single-line diagram + situation plan present?",[50,2425,2426],{},[15,2427,2428,2083,2430,2433,2434,2437],{},[19,2429,1985],{},[19,2431,2432],{},"single-line diagram"," and a ",[19,2435,2436],{},"situation plan"," must be available — even if they need to be created retrospectively.",[24,2439],{},[27,2441,2443],{"id":2442},"the-contamination-rule-for-partial-renovations","The Contamination Rule for Partial Renovations",[15,2445,2446,2447,286],{},"A particularly important aspect for old buildings: the so-called ",[19,2448,2449],{},"contamination rule",[72,2451,2453],{"id":2452},"how-does-it-work","How Does It Work?",[15,2455,2456,2457,2460],{},"When you ",[19,2458,2459],{},"substantially modify"," part of your installation (e.g., adding new circuits):",[617,2462,2463,2470,2476],{},[98,2464,2465,2466,2469],{},"The ",[19,2467,2468],{},"new part"," must fully comply with the current AREI.",[98,2471,2465,2472,2475],{},[19,2473,2474],{},"existing part"," continues to be assessed under Part 8.",[98,2477,2478,2481],{},[19,2479,2480],{},"BUT:"," If the new part \"contaminates\" the existing part (e.g., new cables in the same distribution board), the inspector may decide that the entire board must comply with the current AREI.",[72,2483,2485],{"id":2484},"practical-consequences","Practical Consequences:",[95,2487,2488,2494,2501],{},[98,2489,2490,2491,286],{},"Plan renovations so that new and old parts are ",[19,2492,2493],{},"clearly separated",[98,2495,2496,2497,2500],{},"Ideally, use a ",[19,2498,2499],{},"separate sub-board"," for new circuits.",[98,2502,2503],{},"Document precisely what is old and what is new.",[24,2505],{},[27,2507,2509],{"id":2508},"recommendation-gradual-modernisation","Recommendation: Gradual Modernisation",[15,2511,2512,2513,2516],{},"Even though Part 8 tolerates deviations, ",[19,2514,2515],{},"gradual modernisation"," is recommended:",[72,2518,2520],{"id":2519},"priority-1-safety-critical","Priority 1 (Safety-Critical)",[95,2522,2523,2526,2529,2532],{},[98,2524,2525],{},"Retrofit a 300 mA main RCD (if not present)",[98,2527,2528],{},"Replace damaged cables",[98,2530,2531],{},"Fix loose connections",[98,2533,2534],{},"Check and improve earthing if necessary",[72,2536,2538],{"id":2537},"priority-2-recommended","Priority 2 (Recommended)",[95,2540,2541,2544,2547],{},[98,2542,2543],{},"30 mA group RCDs for bathroom and kitchen",[98,2545,2546],{},"Replace old fuses with MCBs",[98,2548,2549],{},"Retrofit SPD Type 2",[72,2551,2553],{"id":2552},"priority-3-comfort-future-proofing","Priority 3 (Comfort + Future-Proofing)",[95,2555,2556,2559,2562],{},[98,2557,2558],{},"Modernise the board (more rows, labelling)",[98,2560,2561],{},"Retrofit socket outlets with earth",[98,2563,2564],{},"Preparation for EV charger \u002F PV system",[72,2566,2568],{"id":2567},"cost-orientation","Cost Orientation",[144,2570,2571,2581],{},[147,2572,2573],{},[150,2574,2575,2578],{},[153,2576,2577],{},"Measure",[153,2579,2580],{},"Estimated Cost",[160,2582,2583,2591,2599,2606,2614,2622],{},[150,2584,2585,2588],{},[165,2586,2587],{},"Retrofit 300 mA main RCD",[165,2589,2590],{},"EUR 150–300",[150,2592,2593,2596],{},[165,2594,2595],{},"30 mA group RCD (each)",[165,2597,2598],{},"EUR 80–150",[150,2600,2601,2603],{},[165,2602,759],{},[165,2604,2605],{},"EUR 100–250",[150,2607,2608,2611],{},[165,2609,2610],{},"MCB set (10 pieces)",[165,2612,2613],{},"EUR 50–100",[150,2615,2616,2619],{},[165,2617,2618],{},"New 4-row board (complete)",[165,2620,2621],{},"EUR 500–1,500",[150,2623,2624,2627],{},[165,2625,2626],{},"Complete rewiring (house)",[165,2628,2629],{},"EUR 5,000–15,000",[24,2631],{},[27,2633,2635],{"id":2634},"summary","Summary",[144,2637,2638,2648],{},[147,2639,2640],{},[150,2641,2642,2645],{},[153,2643,2644],{},"Question",[153,2646,2647],{},"Answer",[160,2649,2650,2658,2666,2674,2682],{},[150,2651,2652,2655],{},[165,2653,2654],{},"Does my old building need to comply with the current AREI?",[165,2656,2657],{},"Not fully, Part 8 permits deviations",[150,2659,2660,2663],{},[165,2661,2662],{},"Do I need a 30 mA RCD?",[165,2664,2665],{},"Not mandatory under Part 8, but strongly recommended",[150,2667,2668,2671],{},[165,2669,2670],{},"Are old sockets without earth permitted?",[165,2672,2673],{},"Under conditions yes (no bathroom, no Class I appliances)",[150,2675,2676,2679],{},[165,2677,2678],{},"How often must inspections take place?",[165,2680,2681],{},"Every 25 years + on change of ownership",[150,2683,2684,2687],{},[165,2685,2686],{},"What about partial renovation?",[165,2688,2689],{},"New part = current AREI, old part = Part 8 (contamination rule applies)",[24,2691],{},[27,2693,2695],{"id":2694},"related-articles","Related Articles",[95,2697,2698,2704,2710,2716],{},[98,2699,2700],{},[858,2701,2703],{"href":2702},"\u002Fen\u002Fblog\u002Felectrical-inspection","Electrical Inspection in Belgium: What Is Checked?",[98,2705,2706],{},[858,2707,2709],{"href":2708},"\u002Fen\u002Fblog\u002Farei-2026-changes","What Changes with the AREI 2026?",[98,2711,2712],{},[858,2713,2715],{"href":2714},"\u002Fen\u002Fblog\u002Fpreflex-vs-open-wiring","Preflex vs. Open Wiring",[98,2717,2718],{},[858,2719,2721],{"href":2720},"\u002Fen\u002Fblog\u002Fdistribution-board-planning-guide","Distribution Board Planning",[24,2723],{},[15,2725,2726],{},[885,2727,2728,2729,2731,2732],{},"For older buildings, ",[19,2730,890],{}," helps build the single-line diagram and situation plan digitally. The self-check is advisory; have the documents and applicable derogations reviewed professionally. ",[858,2733,2734],{"href":894},"Start for free →",{"title":897,"searchDepth":898,"depth":898,"links":2736},[2737,2738,2743,2751,2755,2760,2764,2770,2771],{"id":1890,"depth":898,"text":1891},{"id":1922,"depth":898,"text":1923,"children":2739},[2740,2741,2742],{"id":1933,"depth":904,"text":1934},{"id":1940,"depth":904,"text":1941},{"id":1951,"depth":904,"text":1952},{"id":1991,"depth":898,"text":1992,"children":2744},[2745,2746,2747,2748,2749,2750],{"id":1998,"depth":904,"text":1999},{"id":2039,"depth":904,"text":2040},{"id":2090,"depth":904,"text":2091},{"id":2126,"depth":904,"text":2127},{"id":2136,"depth":904,"text":2137},{"id":2161,"depth":904,"text":2162},{"id":2170,"depth":898,"text":2171,"children":2752},[2753,2754],{"id":2181,"depth":904,"text":2182},{"id":2279,"depth":904,"text":2280},{"id":2314,"depth":898,"text":2315,"children":2756},[2757,2758,2759],{"id":2318,"depth":904,"text":2319},{"id":2329,"depth":904,"text":2330},{"id":2352,"depth":904,"text":2353},{"id":2442,"depth":898,"text":2443,"children":2761},[2762,2763],{"id":2452,"depth":904,"text":2453},{"id":2484,"depth":904,"text":2485},{"id":2508,"depth":898,"text":2509,"children":2765},[2766,2767,2768,2769],{"id":2519,"depth":904,"text":2520},{"id":2537,"depth":904,"text":2538},{"id":2552,"depth":904,"text":2553},{"id":2567,"depth":904,"text":2568},{"id":2634,"depth":898,"text":2635},{"id":2694,"depth":898,"text":2695},"What applies to older electrical installations in Belgium. AREI Part 8 explained: permitted deviations, periodic inspection, and tips for gradual modernisation.","en",{},"\u002Fblog\u002Fold-building-arei-part8.en",{"title":1874,"description":2772},"old-building-arei-part-8","blog\u002Fold-building-arei-part8.en",[2780,952,953,2781,2782,2783,2784],"old building","existing installation","renovation","inspection","periodic","3mUSkcLD_yqcR9pr9ReIxXoediuq8vIB4IlyOuBNzg4",{"id":2787,"title":2788,"articleId":6,"body":2789,"category":936,"date":937,"description":3682,"extension":939,"lastUpdated":940,"locale":3683,"meta":3684,"navigation":943,"path":3685,"publishDate":937,"readTime":945,"refreshInterval":946,"seo":3686,"slug":3687,"stem":3688,"tags":3689,"__hash__":3696},"blog\u002Fblog\u002Fold-building-arei-part8.fr.md","Ancien bâtiment et RGIE Partie 8 : Règles spéciales pour les installations existantes",{"type":8,"value":2790,"toc":3645},[2791,2794,2801,2803,2807,2814,2825,2833,2835,2839,2846,2850,2853,2857,2864,2868,2894,2902,2904,2908,2911,2915,2953,2957,2993,3005,3009,3012,3041,3045,3051,3055,3077,3081,3084,3086,3090,3097,3101,3195,3199,3202,3228,3230,3234,3238,3245,3249,3256,3268,3272,3340,3354,3356,3360,3366,3370,3377,3398,3402,3420,3422,3426,3433,3437,3451,3455,3466,3470,3481,3485,3541,3543,3547,3600,3602,3606,3632,3634],[11,2792,2788],{"id":2793},"ancien-bâtiment-et-rgie-partie-8-règles-spéciales-pour-les-installations-existantes",[15,2795,2796,2797,2800],{},"Toute installation électrique en Belgique ne doit pas forcément répondre aux dernières prescriptions du RGIE. Pour les bâtiments plus anciens, la ",[19,2798,2799],{},"Partie 8"," constitue un ensemble de règles spécifiques qui tolère certaines dérogations par rapport au standard actuel — tant qu'il n'existe pas de danger immédiat. Cet article explique quand la Partie 8 s'applique, ce qui est autorisé et où se trouvent les limites.",[24,2802],{},[27,2804,2806],{"id":2805},"quest-ce-que-la-partie-8","Qu'est-ce que la Partie 8 ?",[15,2808,2809,2810,2813],{},"La Partie 8 du RGIE (Règlement Général sur les Installations Électriques) est une ",[19,2811,2812],{},"réglementation spéciale pour les installations existantes"," qui ont été réalisées et réceptionnées avant l'entrée en vigueur du RGIE actuel.",[15,2815,2816,2817,2820,2821,2824],{},"Le principe de base : tant qu'une installation fonctionne de manière ",[19,2818,2819],{},"sûre"," et ne représente ",[19,2822,2823],{},"aucun danger immédiat",", elle n'a pas à être entièrement mise aux normes actuelles — même si elle ne répond pas à toutes les prescriptions en vigueur.",[50,2826,2827],{},[15,2828,2829,2832],{},[19,2830,2831],{},"Important :"," La Partie 8 n'est pas un blanc-seing. Elle définit clairement quelles dérogations sont tolérées et lesquelles ne le sont pas.",[24,2834],{},[27,2836,2838],{"id":2837},"quand-la-partie-8-sapplique-t-elle","Quand la Partie 8 s'applique-t-elle ?",[15,2840,2841,2842,2845],{},"La Partie 8 s'applique aux installations qui remplissent ",[19,2843,2844],{},"l'une"," des conditions suivantes :",[72,2847,2849],{"id":2848},"condition-1-installation-avant-le-01101981","Condition 1 : Installation avant le 01.10.1981",[15,2851,2852],{},"Les installations réalisées avant le 1er octobre 1981 (date d'entrée en vigueur du RGIE original) tombent en principe sous la Partie 8.",[72,2854,2856],{"id":2855},"condition-2-réceptionnée-sous-lancien-rgie","Condition 2 : Réceptionnée sous l'ancien RGIE",[15,2858,2859,2860,2863],{},"Les installations qui ont été réceptionnées sous une version antérieure du RGIE et qui n'ont ",[19,2861,2862],{},"pas été substantiellement modifiées"," depuis la dernière réception.",[72,2865,2867],{"id":2866},"quest-ce-quune-modification-substantielle","Qu'est-ce qu'une « modification substantielle » ?",[95,2869,2870,2876,2882,2888],{},[98,2871,2872,2873],{},"Ajout de ",[19,2874,2875],{},"nouveaux circuits",[98,2877,2878,2879],{},"Extension du ",[19,2880,2881],{},"tableau de distribution",[98,2883,2884,2885],{},"Modification de l'",[19,2886,2887],{},"installation de comptage",[98,2889,2890,2893],{},[19,2891,2892],{},"Recâblage"," important",[50,2895,2896],{},[15,2897,2898,2901],{},[19,2899,2900],{},"Attention :"," Les petites modifications comme le remplacement d'une prise ou d'un interrupteur ne comptent PAS comme modification substantielle.",[24,2903],{},[27,2905,2907],{"id":2906},"ce-qui-est-autorisé-sous-la-partie-8-dérogations-tolérées","Ce qui est autorisé sous la Partie 8 (Dérogations tolérées)",[15,2909,2910],{},"Les points suivants s'écartent du RGIE actuel, mais sont tolérés sous la Partie 8 lors du contrôle :",[72,2912,2914],{"id":2913},"_1-anciens-types-de-câbles","1. Anciens types de câbles",[144,2916,2917,2927],{},[147,2918,2919],{},[150,2920,2921,2924],{},[153,2922,2923],{},"RGIE actuel",[153,2925,2926],{},"Partie 8 tolère",[160,2928,2929,2937,2945],{},[150,2930,2931,2934],{},[165,2932,2933],{},"XVB \u002F VOBst en Preflex",[165,2935,2936],{},"Câbles VOB dans d'anciennes gaines",[150,2938,2939,2942],{},[165,2940,2941],{},"Classe de réaction au feu Cca",[165,2943,2944],{},"Types de câbles plus anciens sans classification CPR",[150,2946,2947,2950],{},[165,2948,2949],{},"Section minimale 2,5 mm² pour les prises",[165,2951,2952],{},"Minimum 1 mm² avec fusible max. 6 A ou disjoncteur max. 10 A (Art. 8.2.1 Nr. 5)",[72,2954,2956],{"id":2955},"_2-différentiels-rcd","2. Différentiels (RCD)",[144,2958,2959,2967],{},[147,2960,2961],{},[150,2962,2963,2965],{},[153,2964,2923],{},[153,2966,2926],{},[160,2968,2969,2977,2985],{},[150,2970,2971,2974],{},[165,2972,2973],{},"Différentiel 30 mA par circuit prises",[165,2975,2976],{},"Pas de 30 mA nécessaire (seulement 300 mA principal)",[150,2978,2979,2982],{},[165,2980,2981],{},"Différentiel 30 mA obligatoire pour salle de bain",[165,2983,2984],{},"Reste obligatoire (non couvert par la dérogation Partie 8, Art. 4.2.4.3 b N° 3 \u002F Art. 7.1.4.3)",[150,2986,2987,2990],{},[165,2988,2989],{},"Max. 8 circuits par RCD",[165,2991,2992],{},"Plus de circuits autorisés",[50,2994,2995],{},[15,2996,2997,3000,3001,3004],{},[19,2998,2999],{},"Note :"," Même sous la Partie 8, un ",[19,3002,3003],{},"différentiel principal 300 mA"," est recommandé et souvent exigé par le gestionnaire de réseau lors d'une nouvelle installation de compteur.",[72,3006,3008],{"id":3007},"_3-prises-sans-contact-de-terre","3. Prises sans contact de terre",[15,3010,3011],{},"Les anciennes prises (type C, sans broche de terre) sont tolérées sous la Partie 8, à condition que :",[95,3013,3014,3021,3028,3038],{},[98,3015,3016,3017,3020],{},"La prise soit protégée par un ",[19,3018,3019],{},"différentiel à haute ou très haute sensibilité"," (max. 30 mA) (Art. 8.2.1 N° 6 lettre b).",[98,3022,3023,3024,3027],{},"Aucun appareil de ",[19,3025,3026],{},"classe de protection I"," (avec boîtier métallique) ne soit branché.",[98,3029,3030,3031,3034,3035,286],{},"La prise ne soit pas dans la ",[19,3032,3033],{},"salle de bain"," ou dans un ",[19,3036,3037],{},"lieu humide",[98,3039,3040],{},"Le circuit soit par ailleurs intact.",[72,3042,3044],{"id":3043},"_4-pas-de-parafoudre-spd","4. Pas de parafoudre (SPD)",[15,3046,3047,3048,286],{},"Le RGIE actuel prescrit un parafoudre (SPD) Type 2 pour les nouvelles installations. Sous la Partie 8, ce n'est ",[19,3049,3050],{},"pas requis",[72,3052,3054],{"id":3053},"_5-ancienne-technique-de-distribution","5. Ancienne technique de distribution",[95,3056,3057,3064,3070],{},[98,3058,3059,3060,3063],{},"Les ",[19,3061,3062],{},"fusibles"," au lieu de disjoncteurs sont autorisés.",[98,3065,3059,3066,3069],{},[19,3067,3068],{},"fusibles à vis"," (Diazed) sont tolérés.",[98,3071,3072,3073,3076],{},"L'absence d'",[19,3074,3075],{},"étiquetage"," est mentionnée comme défaut, mais n'entraîne pas un échec.",[72,3078,3080],{"id":3079},"_6-pas-de-classification-de-réaction-au-feu-des-câbles","6. Pas de classification de réaction au feu des câbles",[15,3082,3083],{},"Les câbles sans classification CPR (installés avant 2017) sont tolérés, car le règlement CPR ne s'applique qu'à partir de juillet 2017 pour les nouvelles installations.",[24,3085],{},[27,3087,3089],{"id":3088},"ce-qui-nest-pas-autorisé-même-sous-la-partie-8","Ce qui n'est PAS autorisé (même sous la Partie 8)",[15,3091,3092,3093,3096],{},"Certaines situations ne sont ",[19,3094,3095],{},"jamais tolérées",", quel que soit l'âge de l'installation :",[72,3098,3100],{"id":3099},"absolument-inadmissible","Absolument inadmissible :",[144,3102,3103,3113],{},[147,3104,3105],{},[150,3106,3107,3110],{},[153,3108,3109],{},"Situation",[153,3111,3112],{},"Pourquoi ?",[160,3114,3115,3125,3135,3145,3155,3165,3175,3185],{},[150,3116,3117,3122],{},[165,3118,3119],{},[19,3120,3121],{},"Câbles dénudés ou endommagés",[165,3123,3124],{},"Danger immédiat d'électrocution",[150,3126,3127,3132],{},[165,3128,3129],{},[19,3130,3131],{},"Absence totale de mise à la terre",[165,3133,3134],{},"Pas de protection en cas de défaut d'isolement",[150,3136,3137,3142],{},[165,3138,3139],{},[19,3140,3141],{},"Eau en contact avec l'électricité",[165,3143,3144],{},"Danger de mort",[150,3146,3147,3152],{},[165,3148,3149],{},[19,3150,3151],{},"Parties sous tension accessibles",[165,3153,3154],{},"Risque de contact direct",[150,3156,3157,3162],{},[165,3158,3159],{},[19,3160,3161],{},"Câbles ou connexions en surchauffe",[165,3163,3164],{},"Risque d'incendie",[150,3166,3167,3172],{},[165,3168,3169],{},[19,3170,3171],{},"Connexions desserrées dans les boîtes de dérivation",[165,3173,3174],{},"Risque d'arc\u002Fincendie",[150,3176,3177,3182],{},[165,3178,3179],{},[19,3180,3181],{},"Boîtes de dérivation sans couvercle",[165,3183,3184],{},"Protection contre les contacts manquante",[150,3186,3187,3192],{},[165,3188,3189],{},[19,3190,3191],{},"Prise de salle de bain en zone 0 ou 1",[165,3193,3194],{},"Danger de mort, interdit même sous Partie 8",[72,3196,3198],{"id":3197},"exigences-minimales-de-sécurité","Exigences minimales de sécurité :",[15,3200,3201],{},"Même sous la Partie 8, il faut garantir :",[95,3203,3204,3210,3216,3222],{},[98,3205,3206,3209],{},[19,3207,3208],{},"Section suffisante"," pour la charge réelle (pas de câble 0,75 mm² surchargé).",[98,3211,3212,3215],{},[19,3213,3214],{},"Fusibles fonctionnels"," (pas de fusibles « pontés »).",[98,3217,3218,3221],{},[19,3219,3220],{},"Mise à la terre du tableau principal"," (connexion à l'électrode de terre).",[98,3223,3224,3227],{},[19,3225,3226],{},"Accessibilité"," du tableau de distribution.",[24,3229],{},[27,3231,3233],{"id":3232},"contrôle-périodique","Contrôle périodique",[72,3235,3237],{"id":3236},"tous-les-25-ans-obligatoire","Tous les 25 ans obligatoire",[15,3239,3240,3241,3244],{},"Les installations existantes sous la Partie 8 doivent subir un contrôle périodique tous les ",[19,3242,3243],{},"25 ans"," par un organisme de contrôle agréé.",[72,3246,3248],{"id":3247},"lors-dun-changement-de-propriétaire","Lors d'un changement de propriétaire",[15,3250,3251,3252,3255],{},"Lors de la ",[19,3253,3254],{},"vente d'un bien immobilier",", une attestation de contrôle valide (de moins de 25 ans) est obligatoire. Si elle n'existe pas, un contrôle doit être effectué avant la vente.",[50,3257,3258],{},[15,3259,3260,3263,3264,3267],{},[19,3261,3262],{},"Délai de 18 mois (Art. 8.4.2.2) :"," Lors de l'achat d'un bien immobilier avec un rapport de contrôle négatif, l'acheteur dispose de ",[19,3265,3266],{},"18 mois"," à compter de la date d'achat pour remédier aux défauts et faire effectuer un recontrôle.",[72,3269,3271],{"id":3270},"que-vérifie-t-on-lors-du-contrôle-périodique","Que vérifie-t-on lors du contrôle périodique ?",[144,3273,3274,3284],{},[147,3275,3276],{},[150,3277,3278,3281],{},[153,3279,3280],{},"Point de contrôle",[153,3282,3283],{},"Évaluation",[160,3285,3286,3294,3302,3309,3317,3325,3333],{},[150,3287,3288,3291],{},[165,3289,3290],{},"Inspection visuelle des câbles et connexions",[165,3292,3293],{},"Dommages, surchauffe",[150,3295,3296,3299],{},[165,3297,3298],{},"Mesure de la résistance de terre",[165,3300,3301],{},"≤ 30 Ω (seuil réglementaire selon Art. 4.2.4.3b ; au-delà, des mesures de protection supplémentaires sont nécessaires)",[150,3303,3304,3307],{},[165,3305,3306],{},"Mesure de la résistance d'isolement",[165,3308,544],{},[150,3310,3311,3314],{},[165,3312,3313],{},"Test RCD (si présent)",[165,3315,3316],{},"Temps et courant de déclenchement",[150,3318,3319,3322],{},[165,3320,3321],{},"Vérification de la protection contre les courts-circuits",[165,3323,3324],{},"Fusibles \u002F disjoncteurs présents",[150,3326,3327,3330],{},[165,3328,3329],{},"Protection contre les contacts directs",[165,3331,3332],{},"Couvercles, protection IP",[150,3334,3335,3337],{},[165,3336,2420],{},[165,3338,3339],{},"Schéma unifilaire + plan de situation présents ?",[50,3341,3342],{},[15,3343,3344,3000,3346,3349,3350,3353],{},[19,3345,2999],{},[19,3347,3348],{},"schéma unifilaire"," et un ",[19,3351,3352],{},"plan de situation"," doivent être disponibles — même s'ils doivent être établis rétroactivement.",[24,3355],{},[27,3357,3359],{"id":3358},"la-règle-de-contamination-lors-dune-rénovation-partielle","La règle de contamination lors d'une rénovation partielle",[15,3361,3362,3363,286],{},"Un aspect particulièrement important pour les anciens bâtiments : la ",[19,3364,3365],{},"règle de contamination",[72,3367,3369],{"id":3368},"comment-fonctionne-t-elle","Comment fonctionne-t-elle ?",[15,3371,3372,3373,3376],{},"Lorsque vous modifiez ",[19,3374,3375],{},"substantiellement"," une partie de votre installation (par ex. ajout de nouveaux circuits) :",[617,3378,3379,3386,3392],{},[98,3380,3381,3382,3385],{},"La ",[19,3383,3384],{},"nouvelle partie"," doit entièrement répondre au RGIE actuel.",[98,3387,3381,3388,3391],{},[19,3389,3390],{},"partie existante"," continue d'être évaluée selon la Partie 8.",[98,3393,3394,3397],{},[19,3395,3396],{},"MAIS :"," Si la nouvelle partie « contamine » la partie existante (par ex. nouveaux câbles dans le même tableau), le contrôleur peut décider que l'ensemble du tableau doit répondre au RGIE actuel.",[72,3399,3401],{"id":3400},"conséquences-pratiques","Conséquences pratiques :",[95,3403,3404,3410,3417],{},[98,3405,3406,3407,286],{},"Planifiez les rénovations de manière à ce que les parties nouvelles et anciennes soient ",[19,3408,3409],{},"clairement séparées",[98,3411,3412,3413,3416],{},"Idéalement, un ",[19,3414,3415],{},"sous-tableau séparé"," pour les nouveaux circuits.",[98,3418,3419],{},"Documentez précisément ce qui est ancien et ce qui est nouveau.",[24,3421],{},[27,3423,3425],{"id":3424},"recommandation-modernisation-progressive","Recommandation : Modernisation progressive",[15,3427,3428,3429,3432],{},"Même si la Partie 8 tolère des dérogations, une ",[19,3430,3431],{},"modernisation progressive"," est recommandée :",[72,3434,3436],{"id":3435},"priorité-1-critique-pour-la-sécurité","Priorité 1 (Critique pour la sécurité)",[95,3438,3439,3442,3445,3448],{},[98,3440,3441],{},"Installer un différentiel principal 300 mA (s'il est absent)",[98,3443,3444],{},"Remplacer les câbles endommagés",[98,3446,3447],{},"Réparer les connexions desserrées",[98,3449,3450],{},"Vérifier et améliorer la mise à la terre si nécessaire",[72,3452,3454],{"id":3453},"priorité-2-recommandé","Priorité 2 (Recommandé)",[95,3456,3457,3460,3463],{},[98,3458,3459],{},"Différentiels de groupe 30 mA pour salle de bain et cuisine",[98,3461,3462],{},"Remplacer les anciens fusibles par des disjoncteurs",[98,3464,3465],{},"Installer un parafoudre Type 2",[72,3467,3469],{"id":3468},"priorité-3-confort-pérennité","Priorité 3 (Confort + pérennité)",[95,3471,3472,3475,3478],{},[98,3473,3474],{},"Moderniser le tableau (plus de rangées, étiquetage)",[98,3476,3477],{},"Installer des prises avec terre",[98,3479,3480],{},"Préparation pour borne de recharge \u002F installation PV",[72,3482,3484],{"id":3483},"orientation-des-coûts","Orientation des coûts",[144,3486,3487,3497],{},[147,3488,3489],{},[150,3490,3491,3494],{},[153,3492,3493],{},"Mesure",[153,3495,3496],{},"Coût estimé",[160,3498,3499,3506,3513,3520,3527,3534],{},[150,3500,3501,3504],{},[165,3502,3503],{},"Installer différentiel principal 300 mA",[165,3505,746],{},[150,3507,3508,3511],{},[165,3509,3510],{},"Différentiel de groupe 30 mA (par pièce)",[165,3512,754],{},[150,3514,3515,3518],{},[165,3516,3517],{},"Parafoudre Type 2",[165,3519,762],{},[150,3521,3522,3525],{},[165,3523,3524],{},"Set de disjoncteurs (10 pièces)",[165,3526,770],{},[150,3528,3529,3532],{},[165,3530,3531],{},"Nouveau tableau 4 rangées (complet)",[165,3533,778],{},[150,3535,3536,3539],{},[165,3537,3538],{},"Recâblage complet (maison)",[165,3540,786],{},[24,3542],{},[27,3544,3546],{"id":3545},"résumé","Résumé",[144,3548,3549,3558],{},[147,3550,3551],{},[150,3552,3553,3555],{},[153,3554,2644],{},[153,3556,3557],{},"Réponse",[160,3559,3560,3568,3576,3584,3592],{},[150,3561,3562,3565],{},[165,3563,3564],{},"Mon ancien bâtiment doit-il répondre au RGIE actuel ?",[165,3566,3567],{},"Pas entièrement, la Partie 8 autorise des dérogations",[150,3569,3570,3573],{},[165,3571,3572],{},"Ai-je besoin d'un différentiel 30 mA ?",[165,3574,3575],{},"Pas obligatoire sous Partie 8, mais fortement recommandé",[150,3577,3578,3581],{},[165,3579,3580],{},"Les anciennes prises sans terre sont-elles autorisées ?",[165,3582,3583],{},"Sous conditions oui (pas de salle de bain, pas d'appareils classe I)",[150,3585,3586,3589],{},[165,3587,3588],{},"À quelle fréquence faut-il contrôler ?",[165,3590,3591],{},"Tous les 25 ans + lors d'un changement de propriétaire",[150,3593,3594,3597],{},[165,3595,3596],{},"Que se passe-t-il en cas de rénovation partielle ?",[165,3598,3599],{},"Nouvelle partie = RGIE actuel, ancienne = Partie 8 (règle de contamination)",[24,3601],{},[27,3603,3605],{"id":3604},"articles-connexes","Articles connexes",[95,3607,3608,3614,3620,3626],{},[98,3609,3610],{},[858,3611,3613],{"href":3612},"\u002Ffr\u002Fblog\u002Fcontrole-electrique","Contrôle électrique en Belgique : Que vérifie-t-on ?",[98,3615,3616],{},[858,3617,3619],{"href":3618},"\u002Ffr\u002Fblog\u002Frgie-2026-changements","Que change le RGIE 2026 ?",[98,3621,3622],{},[858,3623,3625],{"href":3624},"\u002Ffr\u002Fblog\u002Fpreflex-vs-pose-libre","Preflex vs. pose libre",[98,3627,3628],{},[858,3629,3631],{"href":3630},"\u002Ffr\u002Fblog\u002Fplanifier-tableau-electrique","Planifier un tableau électrique",[24,3633],{},[15,3635,3636],{},[885,3637,3638,3639,3641,3642],{},"Même pour les anciens bâtiments, ",[19,3640,890],{}," aide à construire numériquement le schéma unifilaire et le plan de situation. L'auto-contrôle est indicatif ; faites vérifier les documents et les dérogations applicables par un professionnel. ",[858,3643,3644],{"href":894},"Commencer gratuitement →",{"title":897,"searchDepth":898,"depth":898,"links":3646},[3647,3648,3653,3661,3665,3670,3674,3680,3681],{"id":2805,"depth":898,"text":2806},{"id":2837,"depth":898,"text":2838,"children":3649},[3650,3651,3652],{"id":2848,"depth":904,"text":2849},{"id":2855,"depth":904,"text":2856},{"id":2866,"depth":904,"text":2867},{"id":2906,"depth":898,"text":2907,"children":3654},[3655,3656,3657,3658,3659,3660],{"id":2913,"depth":904,"text":2914},{"id":2955,"depth":904,"text":2956},{"id":3007,"depth":904,"text":3008},{"id":3043,"depth":904,"text":3044},{"id":3053,"depth":904,"text":3054},{"id":3079,"depth":904,"text":3080},{"id":3088,"depth":898,"text":3089,"children":3662},[3663,3664],{"id":3099,"depth":904,"text":3100},{"id":3197,"depth":904,"text":3198},{"id":3232,"depth":898,"text":3233,"children":3666},[3667,3668,3669],{"id":3236,"depth":904,"text":3237},{"id":3247,"depth":904,"text":3248},{"id":3270,"depth":904,"text":3271},{"id":3358,"depth":898,"text":3359,"children":3671},[3672,3673],{"id":3368,"depth":904,"text":3369},{"id":3400,"depth":904,"text":3401},{"id":3424,"depth":898,"text":3425,"children":3675},[3676,3677,3678,3679],{"id":3435,"depth":904,"text":3436},{"id":3453,"depth":904,"text":3454},{"id":3468,"depth":904,"text":3469},{"id":3483,"depth":904,"text":3484},{"id":3545,"depth":898,"text":3546},{"id":3604,"depth":898,"text":3605},"Ce qui s'applique aux anciennes installations électriques en Belgique. RGIE Partie 8 expliqué : dérogations autorisées, contrôle périodique et conseils pour une modernisation progressive.","fr",{},"\u002Fblog\u002Fold-building-arei-part8.fr",{"title":2788,"description":3682},"ancien-rgie-part-8","blog\u002Fold-building-arei-part8.fr",[3690,3691,2799,3692,3693,3694,3695],"ancien bâtiment","RGIE","installation existante","rénovation","contrôle","périodique","omOCczz1zDQZeVaE62RW1l8-T0oTm2JMKjCL3B7oMdM",{"id":4,"title":5,"articleId":6,"body":3698,"category":936,"date":937,"description":938,"extension":939,"lastUpdated":940,"locale":941,"meta":4341,"navigation":943,"path":944,"publishDate":937,"readTime":945,"refreshInterval":946,"seo":4342,"slug":948,"stem":949,"tags":4343,"__hash__":958},{"type":8,"value":3699,"toc":4304},[3700,3702,3706,3708,3710,3714,3720,3726,3728,3730,3734,3736,3738,3740,3744,3746,3764,3770,3772,3774,3776,3778,3808,3810,3840,3848,3850,3852,3870,3872,3876,3878,3892,3894,3896,3898,3900,3904,3906,3982,3984,3986,4004,4006,4008,4010,4014,4016,4020,4028,4030,4084,4094,4096,4098,4102,4104,4108,4122,4124,4136,4138,4140,4144,4146,4156,4158,4166,4168,4176,4178,4226,4228,4230,4272,4274,4276,4294,4296],[11,3701,5],{"id":13},[15,3703,17,3704,22],{},[19,3705,21],{},[24,3707],{},[27,3709,30],{"id":29},[15,3711,33,3712,37],{},[19,3713,36],{},[15,3715,40,3716,44,3718,48],{},[19,3717,43],{},[19,3719,47],{},[50,3721,3722],{},[15,3723,3724,57],{},[19,3725,56],{},[24,3727],{},[27,3729,63],{"id":62},[15,3731,66,3732,70],{},[19,3733,69],{},[72,3735,75],{"id":74},[15,3737,78],{},[72,3739,82],{"id":81},[15,3741,85,3742,89],{},[19,3743,88],{},[72,3745,93],{"id":92},[95,3747,3748,3752,3756,3760],{},[98,3749,100,3750],{},[19,3751,103],{},[98,3753,106,3754],{},[19,3755,109],{},[98,3757,112,3758],{},[19,3759,115],{},[98,3761,118,3762],{},[19,3763,121],{},[50,3765,3766],{},[15,3767,3768,129],{},[19,3769,128],{},[24,3771],{},[27,3773,135],{"id":134},[15,3775,138],{},[72,3777,142],{"id":141},[144,3779,3780,3788],{},[147,3781,3782],{},[150,3783,3784,3786],{},[153,3785,155],{},[153,3787,158],{},[160,3789,3790,3796,3802],{},[150,3791,3792,3794],{},[165,3793,167],{},[165,3795,170],{},[150,3797,3798,3800],{},[165,3799,175],{},[165,3801,178],{},[150,3803,3804,3806],{},[165,3805,183],{},[165,3807,186],{},[72,3809,190],{"id":189},[144,3811,3812,3820],{},[147,3813,3814],{},[150,3815,3816,3818],{},[153,3817,155],{},[153,3819,158],{},[160,3821,3822,3828,3834],{},[150,3823,3824,3826],{},[165,3825,207],{},[165,3827,210],{},[150,3829,3830,3832],{},[165,3831,215],{},[165,3833,218],{},[150,3835,3836,3838],{},[165,3837,223],{},[165,3839,226],{},[50,3841,3842],{},[15,3843,3844,234,3846,238],{},[19,3845,233],{},[19,3847,237],{},[72,3849,242],{"id":241},[15,3851,245],{},[95,3853,3854,3858,3862,3868],{},[98,3855,250,3856,254],{},[19,3857,253],{},[98,3859,257,3860,261],{},[19,3861,260],{},[98,3863,264,3864,268,3866,272],{},[19,3865,267],{},[19,3867,271],{},[98,3869,275],{},[72,3871,279],{"id":278},[15,3873,282,3874,286],{},[19,3875,285],{},[72,3877,290],{"id":289},[95,3879,3880,3884,3888],{},[98,3881,3882,298],{},[19,3883,297],{},[98,3885,3886,304],{},[19,3887,303],{},[98,3889,307,3890,311],{},[19,3891,310],{},[72,3893,315],{"id":314},[15,3895,318],{},[24,3897],{},[27,3899,324],{"id":323},[15,3901,327,3902,331],{},[19,3903,330],{},[72,3905,335],{"id":334},[144,3907,3908,3916],{},[147,3909,3910],{},[150,3911,3912,3914],{},[153,3913,344],{},[153,3915,347],{},[160,3917,3918,3926,3934,3942,3950,3958,3966,3974],{},[150,3919,3920,3924],{},[165,3921,3922],{},[19,3923,356],{},[165,3925,359],{},[150,3927,3928,3932],{},[165,3929,3930],{},[19,3931,366],{},[165,3933,369],{},[150,3935,3936,3940],{},[165,3937,3938],{},[19,3939,376],{},[165,3941,379],{},[150,3943,3944,3948],{},[165,3945,3946],{},[19,3947,386],{},[165,3949,389],{},[150,3951,3952,3956],{},[165,3953,3954],{},[19,3955,396],{},[165,3957,399],{},[150,3959,3960,3964],{},[165,3961,3962],{},[19,3963,406],{},[165,3965,409],{},[150,3967,3968,3972],{},[165,3969,3970],{},[19,3971,416],{},[165,3973,419],{},[150,3975,3976,3980],{},[165,3977,3978],{},[19,3979,426],{},[165,3981,429],{},[72,3983,433],{"id":432},[15,3985,436],{},[95,3987,3988,3992,3996,4000],{},[98,3989,3990,444],{},[19,3991,443],{},[98,3993,3994,450],{},[19,3995,449],{},[98,3997,3998,456],{},[19,3999,455],{},[98,4001,4002,462],{},[19,4003,461],{},[24,4005],{},[27,4007,468],{"id":467},[72,4009,472],{"id":471},[15,4011,475,4012,479],{},[19,4013,478],{},[72,4015,483],{"id":482},[15,4017,486,4018,490],{},[19,4019,489],{},[50,4021,4022],{},[15,4023,4024,498,4026,502],{},[19,4025,497],{},[19,4027,501],{},[72,4029,506],{"id":505},[144,4031,4032,4040],{},[147,4033,4034],{},[150,4035,4036,4038],{},[153,4037,515],{},[153,4039,518],{},[160,4041,4042,4048,4054,4060,4066,4072,4078],{},[150,4043,4044,4046],{},[165,4045,525],{},[165,4047,528],{},[150,4049,4050,4052],{},[165,4051,533],{},[165,4053,536],{},[150,4055,4056,4058],{},[165,4057,541],{},[165,4059,544],{},[150,4061,4062,4064],{},[165,4063,549],{},[165,4065,552],{},[150,4067,4068,4070],{},[165,4069,557],{},[165,4071,560],{},[150,4073,4074,4076],{},[165,4075,565],{},[165,4077,568],{},[150,4079,4080,4082],{},[165,4081,573],{},[165,4083,576],{},[50,4085,4086],{},[15,4087,4088,583,4090,587,4092,591],{},[19,4089,233],{},[19,4091,586],{},[19,4093,590],{},[24,4095],{},[27,4097,597],{"id":596},[15,4099,600,4100,604],{},[19,4101,603],{},[72,4103,608],{"id":607},[15,4105,611,4106,615],{},[19,4107,614],{},[617,4109,4110,4114,4118],{},[98,4111,621,4112,625],{},[19,4113,624],{},[98,4115,621,4116,631],{},[19,4117,630],{},[98,4119,4120,637],{},[19,4121,636],{},[72,4123,641],{"id":640},[95,4125,4126,4130,4134],{},[98,4127,646,4128,89],{},[19,4129,649],{},[98,4131,652,4132,656],{},[19,4133,655],{},[98,4135,659],{},[24,4137],{},[27,4139,665],{"id":664},[15,4141,668,4142,672],{},[19,4143,671],{},[72,4145,676],{"id":675},[95,4147,4148,4150,4152,4154],{},[98,4149,681],{},[98,4151,684],{},[98,4153,687],{},[98,4155,690],{},[72,4157,694],{"id":693},[95,4159,4160,4162,4164],{},[98,4161,699],{},[98,4163,702],{},[98,4165,705],{},[72,4167,709],{"id":708},[95,4169,4170,4172,4174],{},[98,4171,714],{},[98,4173,717],{},[98,4175,720],{},[72,4177,724],{"id":723},[144,4179,4180,4188],{},[147,4181,4182],{},[150,4183,4184,4186],{},[153,4185,733],{},[153,4187,736],{},[160,4189,4190,4196,4202,4208,4214,4220],{},[150,4191,4192,4194],{},[165,4193,743],{},[165,4195,746],{},[150,4197,4198,4200],{},[165,4199,751],{},[165,4201,754],{},[150,4203,4204,4206],{},[165,4205,759],{},[165,4207,762],{},[150,4209,4210,4212],{},[165,4211,767],{},[165,4213,770],{},[150,4215,4216,4218],{},[165,4217,775],{},[165,4219,778],{},[150,4221,4222,4224],{},[165,4223,783],{},[165,4225,786],{},[24,4227],{},[27,4229,792],{"id":791},[144,4231,4232,4240],{},[147,4233,4234],{},[150,4235,4236,4238],{},[153,4237,801],{},[153,4239,804],{},[160,4241,4242,4248,4254,4260,4266],{},[150,4243,4244,4246],{},[165,4245,811],{},[165,4247,814],{},[150,4249,4250,4252],{},[165,4251,819],{},[165,4253,822],{},[150,4255,4256,4258],{},[165,4257,827],{},[165,4259,830],{},[150,4261,4262,4264],{},[165,4263,835],{},[165,4265,838],{},[150,4267,4268,4270],{},[165,4269,843],{},[165,4271,846],{},[24,4273],{},[27,4275,852],{"id":851},[95,4277,4278,4282,4286,4290],{},[98,4279,4280],{},[858,4281,861],{"href":860},[98,4283,4284],{},[858,4285,867],{"href":866},[98,4287,4288],{},[858,4289,873],{"href":872},[98,4291,4292],{},[858,4293,879],{"href":878},[24,4295],{},[15,4297,4298],{},[885,4299,887,4300,891,4302],{},[19,4301,890],{},[858,4303,895],{"href":894},{"title":897,"searchDepth":898,"depth":898,"links":4305},[4306,4307,4312,4320,4324,4329,4333,4339,4340],{"id":29,"depth":898,"text":30},{"id":62,"depth":898,"text":63,"children":4308},[4309,4310,4311],{"id":74,"depth":904,"text":75},{"id":81,"depth":904,"text":82},{"id":92,"depth":904,"text":93},{"id":134,"depth":898,"text":135,"children":4313},[4314,4315,4316,4317,4318,4319],{"id":141,"depth":904,"text":142},{"id":189,"depth":904,"text":190},{"id":241,"depth":904,"text":242},{"id":278,"depth":904,"text":279},{"id":289,"depth":904,"text":290},{"id":314,"depth":904,"text":315},{"id":323,"depth":898,"text":324,"children":4321},[4322,4323],{"id":334,"depth":904,"text":335},{"id":432,"depth":904,"text":433},{"id":467,"depth":898,"text":468,"children":4325},[4326,4327,4328],{"id":471,"depth":904,"text":472},{"id":482,"depth":904,"text":483},{"id":505,"depth":904,"text":506},{"id":596,"depth":898,"text":597,"children":4330},[4331,4332],{"id":607,"depth":904,"text":608},{"id":640,"depth":904,"text":641},{"id":664,"depth":898,"text":665,"children":4334},[4335,4336,4337,4338],{"id":675,"depth":904,"text":676},{"id":693,"depth":904,"text":694},{"id":708,"depth":904,"text":709},{"id":723,"depth":904,"text":724},{"id":791,"depth":898,"text":792},{"id":851,"depth":898,"text":852},{},{"title":5,"description":938},[951,952,953,954,955,956,957],1787555251826]