[{"data":1,"prerenderedAt":4344},["ShallowReactive",2],{"blog-post-de-altbau-arei-part-8":3,"blog-alternates-old-building-arei-part8":959},{"id":4,"title":5,"articleId":6,"body":7,"category":936,"date":937,"description":938,"extension":939,"lastUpdated":940,"locale":941,"meta":942,"navigation":943,"path":944,"publishDate":937,"readTime":945,"refreshInterval":946,"seo":947,"slug":948,"stem":949,"tags":950,"__hash__":958},"blog\u002Fblog\u002Fold-building-arei-part8.de.md","Altbau und AREI Part 8: Sonderregeln für bestehende Installationen","old-building-arei-part8",{"type":8,"value":9,"toc":896},"minimark",[10,14,23,26,31,38,49,58,60,64,71,76,79,83,90,94,122,130,132,136,139,143,187,191,227,239,243,246,276,280,287,291,312,316,319,321,325,332,336,430,434,437,463,465,469,473,480,484,491,503,507,577,592,594,598,604,608,615,637,641,660,662,666,673,677,691,695,706,710,721,725,787,789,793,847,849,853,880,882],[11,12,5],"h1",{"id":13},"altbau-und-arei-part-8-sonderregeln-für-bestehende-installationen",[15,16,17,18,22],"p",{},"Nicht jede Elektroinstallation in Belgien muss den neuesten AREI-Vorschriften entsprechen. Für ältere Gebäude gibt es mit ",[19,20,21],"strong",{},"Part 8 (Partie 8)"," ein eigenes Regelwerk, das bestimmte Abweichungen vom aktuellen Standard toleriert — solange keine unmittelbare Gefahr besteht. Dieser Artikel erklärt, wann Part 8 gilt, was erlaubt ist und wo die Grenzen liegen.",[24,25],"hr",{},[27,28,30],"h2",{"id":29},"was-ist-part-8","Was ist Part 8?",[15,32,33,34,37],{},"Part 8 des AREI (Allgemeines Reglement über die Elektrischen Installationen \u002F Règlement Général sur les Installations Électriques) ist eine ",[19,35,36],{},"Sonderregelung für bestehende Installationen",", die vor Inkrafttreten des aktuellen AREI errichtet und abgenommen wurden.",[15,39,40,41,44,45,48],{},"Das Grundprinzip: Solange eine Installation ",[19,42,43],{},"sicher"," funktioniert und ",[19,46,47],{},"keine unmittelbare Gefahr"," darstellt, muss sie nicht vollständig auf den neuesten Stand gebracht werden — auch wenn sie nicht allen aktuellen Vorschriften entspricht.",[50,51,52],"blockquote",{},[15,53,54,57],{},[19,55,56],{},"Wichtig:"," Part 8 ist kein Freibrief. Es definiert klar, welche Abweichungen toleriert werden und welche nicht.",[24,59],{},[27,61,63],{"id":62},"wann-gilt-part-8","Wann gilt Part 8?",[15,65,66,67,70],{},"Part 8 gilt für Installationen, die ",[19,68,69],{},"eine"," der folgenden Bedingungen erfüllen:",[72,73,75],"h3",{"id":74},"bedingung-1-installation-vor-dem-01101981","Bedingung 1: Installation vor dem 01.10.1981",[15,77,78],{},"Installationen, die vor dem 1. Oktober 1981 errichtet wurden (Datum des Inkrafttretens des ursprünglichen AREI), fallen grundsätzlich unter Part 8.",[72,80,82],{"id":81},"bedingung-2-unter-dem-alten-arei-abgenommen","Bedingung 2: Unter dem alten AREI abgenommen",[15,84,85,86,89],{},"Installationen, die unter einer früheren Version des AREI abgenommen wurden und seit der letzten Abnahme ",[19,87,88],{},"nicht wesentlich verändert"," wurden.",[72,91,93],{"id":92},"was-zählt-als-wesentliche-änderung","Was zählt als „wesentliche Änderung\"?",[95,96,97,104,110,116],"ul",{},[98,99,100,101],"li",{},"Hinzufügen ",[19,102,103],{},"neuer Stromkreise",[98,105,106,107],{},"Erweiterung des ",[19,108,109],{},"Verteilerkastens",[98,111,112,113],{},"Änderung der ",[19,114,115],{},"Zähleranlage",[98,117,118,119],{},"Umfangreiche ",[19,120,121],{},"Umverdrahtung",[50,123,124],{},[15,125,126,129],{},[19,127,128],{},"Achtung:"," Kleine Änderungen wie der Austausch einer Steckdose oder eines Schalters gelten NICHT als wesentliche Änderung.",[24,131],{},[27,133,135],{"id":134},"was-ist-unter-part-8-erlaubt-tolerierte-abweichungen","Was ist unter Part 8 erlaubt? (Tolerierte Abweichungen)",[15,137,138],{},"Die folgenden Punkte weichen vom aktuellen AREI ab, werden aber unter Part 8 bei der Kontrolle toleriert:",[72,140,142],{"id":141},"_1-alte-kabeltypen","1. Alte Kabeltypen",[144,145,146,159],"table",{},[147,148,149],"thead",{},[150,151,152,156],"tr",{},[153,154,155],"th",{},"Aktuelles AREI",[153,157,158],{},"Part 8 toleriert",[160,161,162,171,179],"tbody",{},[150,163,164,168],{},[165,166,167],"td",{},"XVB \u002F VOBst in Preflex",[165,169,170],{},"VOB-Kabel in alten Leerrohren",[150,172,173,176],{},[165,174,175],{},"Cca-Brandschutzklasse",[165,177,178],{},"Ältere Kabeltypen ohne CPR-Klassifizierung",[150,180,181,184],{},[165,182,183],{},"Mindestquerschnitt 2,5 mm² für Steckdosen",[165,185,186],{},"Mindestens 1 mm² bei Absicherung mit max. 6 A Sicherung oder 10 A Leitungsschutzschalter",[72,188,190],{"id":189},"_2-fehlerstromschutzschalter-rcd-differenzialschalter","2. Fehlerstromschutzschalter (RCD \u002F Differenzialschalter)",[144,192,193,201],{},[147,194,195],{},[150,196,197,199],{},[153,198,155],{},[153,200,158],{},[160,202,203,211,219],{},[150,204,205,208],{},[165,206,207],{},"30 mA RCD pro Steckdosenkreis",[165,209,210],{},"Kein 30 mA RCD nötig (nur 300 mA Haupt-RCD)",[150,212,213,216],{},[165,214,215],{},"30 mA RCD für Badezimmer Pflicht",[165,217,218],{},"Bleibt Pflicht (nicht von der Part-8-Abweichung erfasst, Art. 4.2.4.3 b Nr. 3 \u002F Art. 7.1.4.3)",[150,220,221,224],{},[165,222,223],{},"Max. 8 Kreise pro RCD",[165,225,226],{},"Mehr Kreise erlaubt",[50,228,229],{},[15,230,231,234,235,238],{},[19,232,233],{},"Hinweis:"," Auch unter Part 8 wird ein ",[19,236,237],{},"300 mA Haupt-RCD"," empfohlen und bei Neuinstallation des Zählers oft vom Netzbetreiber vorausgesetzt.",[72,240,242],{"id":241},"_3-steckdosen-ohne-erdungskontakt","3. Steckdosen ohne Erdungskontakt",[15,244,245],{},"Alte Steckdosen ohne Erdungsanschluss (die modernen belgischen Steckdosen sind Typ E mit Erdungsstift) werden unter Part 8 toleriert, sofern:",[95,247,248,255,262,273],{},[98,249,250,251,254],{},"Die Steckdose durch einen ",[19,252,253],{},"Fehlerstromschutzschalter mit hoher oder sehr hoher Empfindlichkeit"," (max. 30 mA) geschützt ist (Art. 8.2.1 Nr. 6 Buchstabe b).",[98,256,257,258,261],{},"Keine Geräte der ",[19,259,260],{},"Schutzklasse I"," (mit Metallgehäuse) angeschlossen werden.",[98,263,264,265,268,269,272],{},"Die Steckdose nicht im ",[19,266,267],{},"Badezimmer"," oder an ",[19,270,271],{},"feuchten Orten"," ist.",[98,274,275],{},"Der Stromkreis ansonsten intakt ist.",[72,277,279],{"id":278},"_4-kein-spd-überspannungsschutz","4. Kein SPD (Überspannungsschutz)",[15,281,282,283,286],{},"Das aktuelle AREI schreibt für Neuinstallationen einen SPD (Surge Protection Device) Typ 2 vor. Unter Part 8 ist das ",[19,284,285],{},"nicht erforderlich",".",[72,288,290],{"id":289},"_5-alte-verteilertechnik","5. Alte Verteilertechnik",[95,292,293,299,305],{},[98,294,295,298],{},[19,296,297],{},"Schmelzsicherungen"," statt MCBs sind erlaubt.",[98,300,301,304],{},[19,302,303],{},"Drehsicherungen"," (Diazed) werden toleriert.",[98,306,307,308,311],{},"Fehlende ",[19,309,310],{},"Beschriftung"," wird als Mangel vermerkt, führt aber nicht zum Durchfallen.",[72,313,315],{"id":314},"_6-keine-brandschutzklassifizierung-der-kabel","6. Keine Brandschutzklassifizierung der Kabel",[15,317,318],{},"Kabel ohne CPR-Klassifizierung (vor 2017 installiert) werden toleriert, da die CPR-Verordnung erst ab Juli 2017 für neue Installationen gilt.",[24,320],{},[27,322,324],{"id":323},"was-ist-nicht-erlaubt-auch-unter-part-8","Was ist NICHT erlaubt (auch unter Part 8)?",[15,326,327,328,331],{},"Bestimmte Zustände werden ",[19,329,330],{},"niemals toleriert",", unabhängig vom Alter der Installation:",[72,333,335],{"id":334},"absolut-unzulässig","Absolut unzulässig:",[144,337,338,348],{},[147,339,340],{},[150,341,342,345],{},[153,343,344],{},"Zustand",[153,346,347],{},"Warum?",[160,349,350,360,370,380,390,400,410,420],{},[150,351,352,357],{},[165,353,354],{},[19,355,356],{},"Blanke oder beschädigte Kabel",[165,358,359],{},"Unmittelbare Stromschlaggefahr",[150,361,362,367],{},[165,363,364],{},[19,365,366],{},"Fehlende Erdung komplett",[165,368,369],{},"Kein Schutz bei Isolationsfehler",[150,371,372,377],{},[165,373,374],{},[19,375,376],{},"Wasser in Kontakt mit Elektrik",[165,378,379],{},"Lebensgefahr",[150,381,382,387],{},[165,383,384],{},[19,385,386],{},"Zugängliche spannungsführende Teile",[165,388,389],{},"Direktes Berührungsrisiko",[150,391,392,397],{},[165,393,394],{},[19,395,396],{},"Überhitzte Kabel oder Verbindungen",[165,398,399],{},"Brandgefahr",[150,401,402,407],{},[165,403,404],{},[19,405,406],{},"Lose Verbindungen in Verteilerdosen",[165,408,409],{},"Lichtbogen-\u002FBrandgefahr",[150,411,412,417],{},[165,413,414],{},[19,415,416],{},"Abzweigdosen ohne Deckel",[165,418,419],{},"Berührungsschutz fehlt",[150,421,422,427],{},[165,423,424],{},[19,425,426],{},"Badezimmer-Steckdose in Zone 0 oder 1",[165,428,429],{},"Lebensgefahr, auch unter Part 8 verboten",[72,431,433],{"id":432},"sicherheitsrelevante-mindestanforderungen","Sicherheitsrelevante Mindestanforderungen:",[15,435,436],{},"Auch unter Part 8 muss gewährleistet sein:",[95,438,439,445,451,457],{},[98,440,441,444],{},[19,442,443],{},"Ausreichender Querschnitt"," für die tatsächliche Belastung (kein überlastetes 0,75 mm²-Kabel).",[98,446,447,450],{},[19,448,449],{},"Funktionierende Sicherungen"," (keine „gebrückten\" Sicherungen).",[98,452,453,456],{},[19,454,455],{},"Erdung des Hauptverteilers"," (Verbindung zur Erdungselektrode).",[98,458,459,462],{},[19,460,461],{},"Zugänglichkeit"," des Verteilerkastens.",[24,464],{},[27,466,468],{"id":467},"periodische-kontrolle","Periodische Kontrolle",[72,470,472],{"id":471},"alle-25-jahre-pflicht","Alle 25 Jahre Pflicht",[15,474,475,476,479],{},"Bestehende Installationen unter Part 8 müssen alle ",[19,477,478],{},"25 Jahre"," einer periodischen Kontrolle durch einen zugelassenen Kontrollorganismus unterzogen werden.",[72,481,483],{"id":482},"bei-eigentümerwechsel","Bei Eigentümerwechsel",[15,485,486,487,490],{},"Bei ",[19,488,489],{},"Verkauf einer Immobilie"," ist eine gültige Kontrollbescheinigung (weniger als 25 Jahre alt) Pflicht. Liegt keine vor, muss vor dem Verkauf eine Kontrolle durchgeführt werden.",[50,492,493],{},[15,494,495,498,499,502],{},[19,496,497],{},"18-Monate-Frist (Art. 8.4.2.2):"," Bei Kauf einer Immobilie mit negativem Prüfbericht hat der Käufer ",[19,500,501],{},"18 Monate"," ab Kaufdatum, um die Mängel zu beheben und eine Nachkontrolle durchführen zu lassen.",[72,504,506],{"id":505},"was-wird-bei-der-periodischen-kontrolle-geprüft","Was wird bei der periodischen Kontrolle geprüft?",[144,508,509,519],{},[147,510,511],{},[150,512,513,516],{},[153,514,515],{},"Prüfpunkt",[153,517,518],{},"Beurteilung",[160,520,521,529,537,545,553,561,569],{},[150,522,523,526],{},[165,524,525],{},"Sichtprüfung der Kabel und Verbindungen",[165,527,528],{},"Beschädigung, Überhitzung",[150,530,531,534],{},[165,532,533],{},"Erdungswiderstand messen",[165,535,536],{},"≤ 30 Ω (regulatorische Schwelle gemäß Art. 4.2.4.3b; darüber zusätzliche Schutzmaßnahmen nötig)",[150,538,539,542],{},[165,540,541],{},"Isolationswiderstand messen",[165,543,544],{},"> 0,5 MΩ",[150,546,547,550],{},[165,548,549],{},"RCD-Test (falls vorhanden)",[165,551,552],{},"Auslösezeit und -strom",[150,554,555,558],{},[165,556,557],{},"Kurzschlussschutz prüfen",[165,559,560],{},"Sicherungen \u002F MCBs vorhanden",[150,562,563,566],{},[165,564,565],{},"Schutz gegen direktes Berühren",[165,567,568],{},"Abdeckungen, IP-Schutz",[150,570,571,574],{},[165,572,573],{},"Dokumentation",[165,575,576],{},"Eindrahtschema + Situationsplan vorhanden?",[50,578,579],{},[15,580,581,583,584,587,588,591],{},[19,582,233],{}," Auch unter Part 8 müssen ein ",[19,585,586],{},"Eindrahtschema"," und ein ",[19,589,590],{},"Situationsplan"," vorhanden sein — auch wenn diese nachträglich erstellt werden müssen.",[24,593],{},[27,595,597],{"id":596},"die-kontaminationsregel-bei-teilrenovierung","Die Kontaminationsregel bei Teilrenovierung",[15,599,600,601,286],{},"Ein besonders wichtiger Aspekt bei Altbauten: die sogenannte ",[19,602,603],{},"Kontaminationsregel",[72,605,607],{"id":606},"wie-funktioniert-sie","Wie funktioniert sie?",[15,609,610,611,614],{},"Wenn Sie einen Teil Ihrer Installation ",[19,612,613],{},"wesentlich verändern"," (z. B. neue Stromkreise hinzufügen), gilt:",[616,617,618,625,631],"ol",{},[98,619,620,621,624],{},"Der ",[19,622,623],{},"neue Teil"," muss vollständig dem aktuellen AREI entsprechen.",[98,626,620,627,630],{},[19,628,629],{},"bestehende Teil"," wird weiterhin nach Part 8 beurteilt.",[98,632,633,636],{},[19,634,635],{},"ABER:"," Wenn der neue Teil den bestehenden Teil „kontaminiert\" (z. B. neue Kabel im selben Verteiler), kann der Kontrolleur entscheiden, dass der gesamte Verteiler dem aktuellen AREI entsprechen muss.",[72,638,640],{"id":639},"praktische-konsequenz","Praktische Konsequenz:",[95,642,643,650,657],{},[98,644,645,646,649],{},"Planen Sie Renovierungen so, dass neue und alte Teile ",[19,647,648],{},"klar getrennt"," sind.",[98,651,652,653,656],{},"Idealerweise einen ",[19,654,655],{},"separaten Unterverteiler"," für neue Stromkreise.",[98,658,659],{},"Dokumentieren Sie genau, was alt und was neu ist.",[24,661],{},[27,663,665],{"id":664},"empfehlung-schrittweise-modernisierung","Empfehlung: Schrittweise Modernisierung",[15,667,668,669,672],{},"Auch wenn Part 8 Abweichungen toleriert, empfiehlt sich eine ",[19,670,671],{},"schrittweise Modernisierung",":",[72,674,676],{"id":675},"priorität-1-sicherheitskritisch","Priorität 1 (Sicherheitskritisch)",[95,678,679,682,685,688],{},[98,680,681],{},"300 mA Haupt-RCD nachrüsten (falls nicht vorhanden)",[98,683,684],{},"Beschädigte Kabel ersetzen",[98,686,687],{},"Lose Verbindungen beheben",[98,689,690],{},"Erdung prüfen und ggf. verbessern",[72,692,694],{"id":693},"priorität-2-empfohlen","Priorität 2 (Empfohlen)",[95,696,697,700,703],{},[98,698,699],{},"30 mA Gruppen-RCDs für Badezimmer und Küche",[98,701,702],{},"Alte Schmelzsicherungen durch MCBs ersetzen",[98,704,705],{},"SPD Typ 2 nachrüsten",[72,707,709],{"id":708},"priorität-3-komfort-zukunftssicherheit","Priorität 3 (Komfort + Zukunftssicherheit)",[95,711,712,715,718],{},[98,713,714],{},"Verteiler modernisieren (mehr Reihen, Beschriftung)",[98,716,717],{},"Steckdosen mit Erdung nachrüsten",[98,719,720],{},"Vorbereitung für Wallbox \u002F PV-Anlage",[72,722,724],{"id":723},"kostenorientierung","Kostenorientierung",[144,726,727,737],{},[147,728,729],{},[150,730,731,734],{},[153,732,733],{},"Maßnahme",[153,735,736],{},"Geschätzte Kosten",[160,738,739,747,755,763,771,779],{},[150,740,741,744],{},[165,742,743],{},"300 mA Haupt-RCD nachrüsten",[165,745,746],{},"150–300 EUR",[150,748,749,752],{},[165,750,751],{},"30 mA Gruppen-RCD (pro Stück)",[165,753,754],{},"80–150 EUR",[150,756,757,760],{},[165,758,759],{},"SPD Typ 2",[165,761,762],{},"100–250 EUR",[150,764,765,768],{},[165,766,767],{},"MCB-Set (10 Stück)",[165,769,770],{},"50–100 EUR",[150,772,773,776],{},[165,774,775],{},"Neuer 4-Reihen-Verteiler (komplett)",[165,777,778],{},"500–1.500 EUR",[150,780,781,784],{},[165,782,783],{},"Vollständige Neuverkabelung (EFH)",[165,785,786],{},"5.000–15.000 EUR",[24,788],{},[27,790,792],{"id":791},"zusammenfassung","Zusammenfassung",[144,794,795,805],{},[147,796,797],{},[150,798,799,802],{},[153,800,801],{},"Frage",[153,803,804],{},"Antwort",[160,806,807,815,823,831,839],{},[150,808,809,812],{},[165,810,811],{},"Muss mein Altbau dem aktuellen AREI entsprechen?",[165,813,814],{},"Nicht vollständig, Part 8 erlaubt Abweichungen",[150,816,817,820],{},[165,818,819],{},"Brauche ich einen 30 mA RCD?",[165,821,822],{},"Unter Part 8 nicht Pflicht, aber dringend empfohlen",[150,824,825,828],{},[165,826,827],{},"Sind alte Steckdosen ohne Erdung erlaubt?",[165,829,830],{},"Unter Bedingungen ja (kein Badezimmer, keine Schutzklasse-I-Geräte)",[150,832,833,836],{},[165,834,835],{},"Wie oft muss kontrolliert werden?",[165,837,838],{},"Alle 25 Jahre + bei Eigentümerwechsel",[150,840,841,844],{},[165,842,843],{},"Was passiert bei Teilrenovierung?",[165,845,846],{},"Neuer Teil = aktuelles AREI, alter Teil = Part 8 (Kontaminationsregel beachten)",[24,848],{},[27,850,852],{"id":851},"verwandte-artikel","Verwandte Artikel",[95,854,855,862,868,874],{},[98,856,857],{},[858,859,861],"a",{"href":860},"\u002Fde\u002Fblog\u002Felektrische-kontrolle","Elektrische Kontrolle in Belgien: Was wird geprüft?",[98,863,864],{},[858,865,867],{"href":866},"\u002Fde\u002Fblog\u002Farei-2026-aenderungen","Was ändert sich mit dem AREI 2026?",[98,869,870],{},[858,871,873],{"href":872},"\u002Fde\u002Fblog\u002Fpreflex-vs-freie-verlegung","Preflex vs. freie Verlegung",[98,875,876],{},[858,877,879],{"href":878},"\u002Fde\u002Fblog\u002Fschaltschrank-planen-aufbau","Schaltschrank planen",[24,881],{},[15,883,884],{},[885,886,887,888,891,892],"em",{},"Auch für Altbauten erstellt ",[19,889,890],{},"PlanElec"," normgerechte Eindrahtschemas und Situationspläne — die Pflichtdokumente für jede Kontrolle. Dokumentieren Sie Ihre Installation jetzt digital. ",[858,893,895],{"href":894},"\u002F","Kostenlos starten →",{"title":897,"searchDepth":898,"depth":898,"links":899},"",2,[900,901,907,915,919,924,928,934,935],{"id":29,"depth":898,"text":30},{"id":62,"depth":898,"text":63,"children":902},[903,905,906],{"id":74,"depth":904,"text":75},3,{"id":81,"depth":904,"text":82},{"id":92,"depth":904,"text":93},{"id":134,"depth":898,"text":135,"children":908},[909,910,911,912,913,914],{"id":141,"depth":904,"text":142},{"id":189,"depth":904,"text":190},{"id":241,"depth":904,"text":242},{"id":278,"depth":904,"text":279},{"id":289,"depth":904,"text":290},{"id":314,"depth":904,"text":315},{"id":323,"depth":898,"text":324,"children":916},[917,918],{"id":334,"depth":904,"text":335},{"id":432,"depth":904,"text":433},{"id":467,"depth":898,"text":468,"children":920},[921,922,923],{"id":471,"depth":904,"text":472},{"id":482,"depth":904,"text":483},{"id":505,"depth":904,"text":506},{"id":596,"depth":898,"text":597,"children":925},[926,927],{"id":606,"depth":904,"text":607},{"id":639,"depth":904,"text":640},{"id":664,"depth":898,"text":665,"children":929},[930,931,932,933],{"id":675,"depth":904,"text":676},{"id":693,"depth":904,"text":694},{"id":708,"depth":904,"text":709},{"id":723,"depth":904,"text":724},{"id":791,"depth":898,"text":792},{"id":851,"depth":898,"text":852},"guide","2026-04-14","Was bei älteren Elektroinstallationen in Belgien gilt. AREI Part 8 erklärt: erlaubte Abweichungen, periodische Kontrolle und Tipps zur schrittweisen Modernisierung.","md","2026-06-05","de",{},true,"\u002Fblog\u002Fold-building-arei-part8.de","8 min",12,{"title":5,"description":938},"altbau-arei-part-8","blog\u002Fold-building-arei-part8.de",[951,952,953,954,955,956,957],"altbau","AREI","Part 8","bestandsinstallation","renovierung","kontrolle","periodisch","WDz2A426D1LVad7bgEuHPyefaCr9JZdCzjAxBg5Z9lE",[960,1607,2522,3433],{"id":4,"title":5,"articleId":6,"body":961,"category":936,"date":937,"description":938,"extension":939,"lastUpdated":940,"locale":941,"meta":1604,"navigation":943,"path":944,"publishDate":937,"readTime":945,"refreshInterval":946,"seo":1605,"slug":948,"stem":949,"tags":1606,"__hash__":958},{"type":8,"value":962,"toc":1567},[963,965,969,971,973,977,983,989,991,993,997,999,1001,1003,1007,1009,1027,1033,1035,1037,1039,1041,1071,1073,1103,1111,1113,1115,1133,1135,1139,1141,1155,1157,1159,1161,1163,1167,1169,1245,1247,1249,1267,1269,1271,1273,1277,1279,1283,1291,1293,1347,1357,1359,1361,1365,1367,1371,1385,1387,1399,1401,1403,1407,1409,1419,1421,1429,1431,1439,1441,1489,1491,1493,1535,1537,1539,1557,1559],[11,964,5],{"id":13},[15,966,17,967,22],{},[19,968,21],{},[24,970],{},[27,972,30],{"id":29},[15,974,33,975,37],{},[19,976,36],{},[15,978,40,979,44,981,48],{},[19,980,43],{},[19,982,47],{},[50,984,985],{},[15,986,987,57],{},[19,988,56],{},[24,990],{},[27,992,63],{"id":62},[15,994,66,995,70],{},[19,996,69],{},[72,998,75],{"id":74},[15,1000,78],{},[72,1002,82],{"id":81},[15,1004,85,1005,89],{},[19,1006,88],{},[72,1008,93],{"id":92},[95,1010,1011,1015,1019,1023],{},[98,1012,100,1013],{},[19,1014,103],{},[98,1016,106,1017],{},[19,1018,109],{},[98,1020,112,1021],{},[19,1022,115],{},[98,1024,118,1025],{},[19,1026,121],{},[50,1028,1029],{},[15,1030,1031,129],{},[19,1032,128],{},[24,1034],{},[27,1036,135],{"id":134},[15,1038,138],{},[72,1040,142],{"id":141},[144,1042,1043,1051],{},[147,1044,1045],{},[150,1046,1047,1049],{},[153,1048,155],{},[153,1050,158],{},[160,1052,1053,1059,1065],{},[150,1054,1055,1057],{},[165,1056,167],{},[165,1058,170],{},[150,1060,1061,1063],{},[165,1062,175],{},[165,1064,178],{},[150,1066,1067,1069],{},[165,1068,183],{},[165,1070,186],{},[72,1072,190],{"id":189},[144,1074,1075,1083],{},[147,1076,1077],{},[150,1078,1079,1081],{},[153,1080,155],{},[153,1082,158],{},[160,1084,1085,1091,1097],{},[150,1086,1087,1089],{},[165,1088,207],{},[165,1090,210],{},[150,1092,1093,1095],{},[165,1094,215],{},[165,1096,218],{},[150,1098,1099,1101],{},[165,1100,223],{},[165,1102,226],{},[50,1104,1105],{},[15,1106,1107,234,1109,238],{},[19,1108,233],{},[19,1110,237],{},[72,1112,242],{"id":241},[15,1114,245],{},[95,1116,1117,1121,1125,1131],{},[98,1118,250,1119,254],{},[19,1120,253],{},[98,1122,257,1123,261],{},[19,1124,260],{},[98,1126,264,1127,268,1129,272],{},[19,1128,267],{},[19,1130,271],{},[98,1132,275],{},[72,1134,279],{"id":278},[15,1136,282,1137,286],{},[19,1138,285],{},[72,1140,290],{"id":289},[95,1142,1143,1147,1151],{},[98,1144,1145,298],{},[19,1146,297],{},[98,1148,1149,304],{},[19,1150,303],{},[98,1152,307,1153,311],{},[19,1154,310],{},[72,1156,315],{"id":314},[15,1158,318],{},[24,1160],{},[27,1162,324],{"id":323},[15,1164,327,1165,331],{},[19,1166,330],{},[72,1168,335],{"id":334},[144,1170,1171,1179],{},[147,1172,1173],{},[150,1174,1175,1177],{},[153,1176,344],{},[153,1178,347],{},[160,1180,1181,1189,1197,1205,1213,1221,1229,1237],{},[150,1182,1183,1187],{},[165,1184,1185],{},[19,1186,356],{},[165,1188,359],{},[150,1190,1191,1195],{},[165,1192,1193],{},[19,1194,366],{},[165,1196,369],{},[150,1198,1199,1203],{},[165,1200,1201],{},[19,1202,376],{},[165,1204,379],{},[150,1206,1207,1211],{},[165,1208,1209],{},[19,1210,386],{},[165,1212,389],{},[150,1214,1215,1219],{},[165,1216,1217],{},[19,1218,396],{},[165,1220,399],{},[150,1222,1223,1227],{},[165,1224,1225],{},[19,1226,406],{},[165,1228,409],{},[150,1230,1231,1235],{},[165,1232,1233],{},[19,1234,416],{},[165,1236,419],{},[150,1238,1239,1243],{},[165,1240,1241],{},[19,1242,426],{},[165,1244,429],{},[72,1246,433],{"id":432},[15,1248,436],{},[95,1250,1251,1255,1259,1263],{},[98,1252,1253,444],{},[19,1254,443],{},[98,1256,1257,450],{},[19,1258,449],{},[98,1260,1261,456],{},[19,1262,455],{},[98,1264,1265,462],{},[19,1266,461],{},[24,1268],{},[27,1270,468],{"id":467},[72,1272,472],{"id":471},[15,1274,475,1275,479],{},[19,1276,478],{},[72,1278,483],{"id":482},[15,1280,486,1281,490],{},[19,1282,489],{},[50,1284,1285],{},[15,1286,1287,498,1289,502],{},[19,1288,497],{},[19,1290,501],{},[72,1292,506],{"id":505},[144,1294,1295,1303],{},[147,1296,1297],{},[150,1298,1299,1301],{},[153,1300,515],{},[153,1302,518],{},[160,1304,1305,1311,1317,1323,1329,1335,1341],{},[150,1306,1307,1309],{},[165,1308,525],{},[165,1310,528],{},[150,1312,1313,1315],{},[165,1314,533],{},[165,1316,536],{},[150,1318,1319,1321],{},[165,1320,541],{},[165,1322,544],{},[150,1324,1325,1327],{},[165,1326,549],{},[165,1328,552],{},[150,1330,1331,1333],{},[165,1332,557],{},[165,1334,560],{},[150,1336,1337,1339],{},[165,1338,565],{},[165,1340,568],{},[150,1342,1343,1345],{},[165,1344,573],{},[165,1346,576],{},[50,1348,1349],{},[15,1350,1351,583,1353,587,1355,591],{},[19,1352,233],{},[19,1354,586],{},[19,1356,590],{},[24,1358],{},[27,1360,597],{"id":596},[15,1362,600,1363,286],{},[19,1364,603],{},[72,1366,607],{"id":606},[15,1368,610,1369,614],{},[19,1370,613],{},[616,1372,1373,1377,1381],{},[98,1374,620,1375,624],{},[19,1376,623],{},[98,1378,620,1379,630],{},[19,1380,629],{},[98,1382,1383,636],{},[19,1384,635],{},[72,1386,640],{"id":639},[95,1388,1389,1393,1397],{},[98,1390,645,1391,649],{},[19,1392,648],{},[98,1394,652,1395,656],{},[19,1396,655],{},[98,1398,659],{},[24,1400],{},[27,1402,665],{"id":664},[15,1404,668,1405,672],{},[19,1406,671],{},[72,1408,676],{"id":675},[95,1410,1411,1413,1415,1417],{},[98,1412,681],{},[98,1414,684],{},[98,1416,687],{},[98,1418,690],{},[72,1420,694],{"id":693},[95,1422,1423,1425,1427],{},[98,1424,699],{},[98,1426,702],{},[98,1428,705],{},[72,1430,709],{"id":708},[95,1432,1433,1435,1437],{},[98,1434,714],{},[98,1436,717],{},[98,1438,720],{},[72,1440,724],{"id":723},[144,1442,1443,1451],{},[147,1444,1445],{},[150,1446,1447,1449],{},[153,1448,733],{},[153,1450,736],{},[160,1452,1453,1459,1465,1471,1477,1483],{},[150,1454,1455,1457],{},[165,1456,743],{},[165,1458,746],{},[150,1460,1461,1463],{},[165,1462,751],{},[165,1464,754],{},[150,1466,1467,1469],{},[165,1468,759],{},[165,1470,762],{},[150,1472,1473,1475],{},[165,1474,767],{},[165,1476,770],{},[150,1478,1479,1481],{},[165,1480,775],{},[165,1482,778],{},[150,1484,1485,1487],{},[165,1486,783],{},[165,1488,786],{},[24,1490],{},[27,1492,792],{"id":791},[144,1494,1495,1503],{},[147,1496,1497],{},[150,1498,1499,1501],{},[153,1500,801],{},[153,1502,804],{},[160,1504,1505,1511,1517,1523,1529],{},[150,1506,1507,1509],{},[165,1508,811],{},[165,1510,814],{},[150,1512,1513,1515],{},[165,1514,819],{},[165,1516,822],{},[150,1518,1519,1521],{},[165,1520,827],{},[165,1522,830],{},[150,1524,1525,1527],{},[165,1526,835],{},[165,1528,838],{},[150,1530,1531,1533],{},[165,1532,843],{},[165,1534,846],{},[24,1536],{},[27,1538,852],{"id":851},[95,1540,1541,1545,1549,1553],{},[98,1542,1543],{},[858,1544,861],{"href":860},[98,1546,1547],{},[858,1548,867],{"href":866},[98,1550,1551],{},[858,1552,873],{"href":872},[98,1554,1555],{},[858,1556,879],{"href":878},[24,1558],{},[15,1560,1561],{},[885,1562,887,1563,891,1565],{},[19,1564,890],{},[858,1566,895],{"href":894},{"title":897,"searchDepth":898,"depth":898,"links":1568},[1569,1570,1575,1583,1587,1592,1596,1602,1603],{"id":29,"depth":898,"text":30},{"id":62,"depth":898,"text":63,"children":1571},[1572,1573,1574],{"id":74,"depth":904,"text":75},{"id":81,"depth":904,"text":82},{"id":92,"depth":904,"text":93},{"id":134,"depth":898,"text":135,"children":1576},[1577,1578,1579,1580,1581,1582],{"id":141,"depth":904,"text":142},{"id":189,"depth":904,"text":190},{"id":241,"depth":904,"text":242},{"id":278,"depth":904,"text":279},{"id":289,"depth":904,"text":290},{"id":314,"depth":904,"text":315},{"id":323,"depth":898,"text":324,"children":1584},[1585,1586],{"id":334,"depth":904,"text":335},{"id":432,"depth":904,"text":433},{"id":467,"depth":898,"text":468,"children":1588},[1589,1590,1591],{"id":471,"depth":904,"text":472},{"id":482,"depth":904,"text":483},{"id":505,"depth":904,"text":506},{"id":596,"depth":898,"text":597,"children":1593},[1594,1595],{"id":606,"depth":904,"text":607},{"id":639,"depth":904,"text":640},{"id":664,"depth":898,"text":665,"children":1597},[1598,1599,1600,1601],{"id":675,"depth":904,"text":676},{"id":693,"depth":904,"text":694},{"id":708,"depth":904,"text":709},{"id":723,"depth":904,"text":724},{"id":791,"depth":898,"text":792},{"id":851,"depth":898,"text":852},{},{"title":5,"description":938},[951,952,953,954,955,956,957],{"id":1608,"title":1609,"articleId":6,"body":1610,"category":936,"date":937,"description":2508,"extension":939,"lastUpdated":940,"locale":2509,"meta":2510,"navigation":943,"path":2511,"publishDate":937,"readTime":945,"refreshInterval":946,"seo":2512,"slug":2513,"stem":2514,"tags":2515,"__hash__":2521},"blog\u002Fblog\u002Fold-building-arei-part8.en.md","Old Buildings and AREI Part 8: Special Rules for Existing Installations",{"type":8,"value":1611,"toc":2471},[1612,1615,1621,1623,1627,1634,1645,1653,1655,1659,1666,1670,1673,1677,1684,1688,1714,1722,1724,1728,1731,1735,1772,1776,1812,1823,1827,1830,1859,1863,1869,1873,1894,1898,1901,1903,1907,1914,1918,2012,2016,2019,2045,2047,2051,2055,2062,2066,2073,2085,2089,2159,2173,2175,2179,2185,2189,2196,2217,2221,2239,2241,2245,2252,2256,2270,2274,2285,2289,2300,2304,2366,2368,2372,2426,2428,2432,2458,2460],[11,1613,1609],{"id":1614},"old-buildings-and-arei-part-8-special-rules-for-existing-installations",[15,1616,1617,1618,1620],{},"Not every electrical installation in Belgium needs to comply with the latest AREI\u002FRGIE regulations. For older buildings, ",[19,1619,21],{}," provides a dedicated set of rules that tolerates certain deviations from the current standard — as long as no immediate danger exists. This article explains when Part 8 applies, what is permitted, and where the limits lie.",[24,1622],{},[27,1624,1626],{"id":1625},"what-is-part-8","What Is Part 8?",[15,1628,1629,1630,1633],{},"Part 8 of the AREI (Algemeen Reglement op de Elektrische Installaties \u002F Règlement Général sur les Installations Électriques) is a ",[19,1631,1632],{},"special regulation for existing installations"," that were constructed and approved before the current AREI came into force.",[15,1635,1636,1637,1640,1641,1644],{},"The basic principle: as long as an installation functions ",[19,1638,1639],{},"safely"," and poses ",[19,1642,1643],{},"no immediate danger",", it does not need to be fully brought up to the latest standards — even if it does not meet all current requirements.",[50,1646,1647],{},[15,1648,1649,1652],{},[19,1650,1651],{},"Important:"," Part 8 is not a free pass. It clearly defines which deviations are tolerated and which are not.",[24,1654],{},[27,1656,1658],{"id":1657},"when-does-part-8-apply","When Does Part 8 Apply?",[15,1660,1661,1662,1665],{},"Part 8 applies to installations that meet ",[19,1663,1664],{},"one"," of the following conditions:",[72,1667,1669],{"id":1668},"condition-1-installation-before-01101981","Condition 1: Installation Before 01.10.1981",[15,1671,1672],{},"Installations constructed before 1 October 1981 (the date the original AREI came into force) fall under Part 8 by default.",[72,1674,1676],{"id":1675},"condition-2-approved-under-the-old-arei","Condition 2: Approved Under the Old AREI",[15,1678,1679,1680,1683],{},"Installations that were approved under a previous version of the AREI and have ",[19,1681,1682],{},"not been substantially modified"," since the last approval.",[72,1685,1687],{"id":1686},"what-counts-as-a-substantial-modification","What Counts as a \"Substantial Modification\"?",[95,1689,1690,1696,1702,1708],{},[98,1691,1692,1693],{},"Adding ",[19,1694,1695],{},"new circuits",[98,1697,1698,1699],{},"Expanding the ",[19,1700,1701],{},"distribution board",[98,1703,1704,1705],{},"Modifying the ",[19,1706,1707],{},"metering installation",[98,1709,1710,1711],{},"Extensive ",[19,1712,1713],{},"rewiring",[50,1715,1716],{},[15,1717,1718,1721],{},[19,1719,1720],{},"Note:"," Small changes such as replacing a socket outlet or switch do NOT count as a substantial modification.",[24,1723],{},[27,1725,1727],{"id":1726},"what-is-permitted-under-part-8-tolerated-deviations","What Is Permitted Under Part 8? (Tolerated Deviations)",[15,1729,1730],{},"The following points deviate from the current AREI but are tolerated under Part 8 during inspection:",[72,1732,1734],{"id":1733},"_1-old-cable-types","1. Old Cable Types",[144,1736,1737,1747],{},[147,1738,1739],{},[150,1740,1741,1744],{},[153,1742,1743],{},"Current AREI",[153,1745,1746],{},"Part 8 tolerates",[160,1748,1749,1756,1764],{},[150,1750,1751,1753],{},[165,1752,167],{},[165,1754,1755],{},"VOB cables in old conduits",[150,1757,1758,1761],{},[165,1759,1760],{},"Cca fire reaction class",[165,1762,1763],{},"Older cable types without CPR classification",[150,1765,1766,1769],{},[165,1767,1768],{},"Minimum cross-section 2.5 mm² for sockets",[165,1770,1771],{},"Minimum 1 mm² with max. 6A fuse or 10A MCB (Art. 8.2.1 Nr. 5)",[72,1773,1775],{"id":1774},"_2-residual-current-devices-rcd","2. Residual Current Devices (RCD)",[144,1777,1778,1786],{},[147,1779,1780],{},[150,1781,1782,1784],{},[153,1783,1743],{},[153,1785,1746],{},[160,1787,1788,1796,1804],{},[150,1789,1790,1793],{},[165,1791,1792],{},"30 mA RCD per socket circuit",[165,1794,1795],{},"No 30 mA RCD needed (only 300 mA main RCD)",[150,1797,1798,1801],{},[165,1799,1800],{},"30 mA RCD mandatory for bathroom",[165,1802,1803],{},"Remains mandatory (not covered by the Part 8 deviation, Art. 4.2.4.3 b No. 3 \u002F Art. 7.1.4.3)",[150,1805,1806,1809],{},[165,1807,1808],{},"Max. 8 circuits per RCD",[165,1810,1811],{},"More circuits permitted",[50,1813,1814],{},[15,1815,1816,1818,1819,1822],{},[19,1817,1720],{}," Even under Part 8, a ",[19,1820,1821],{},"300 mA main RCD"," is recommended and often required by the grid operator when a new meter is installed.",[72,1824,1826],{"id":1825},"_3-socket-outlets-without-earth-contact","3. Socket Outlets Without Earth Contact",[15,1828,1829],{},"Old socket outlets (type C, without earth pin) are tolerated under Part 8, provided that:",[95,1831,1832,1839,1846,1856],{},[98,1833,1834,1835,1838],{},"The socket is protected by a ",[19,1836,1837],{},"high or very high sensitivity RCD"," (max. 30 mA) (Art. 8.2.1 No. 6 letter b).",[98,1840,1841,1842,1845],{},"No ",[19,1843,1844],{},"Class I"," appliances (with metal housing) are connected.",[98,1847,1848,1849,1852,1853,286],{},"The socket is not in the ",[19,1850,1851],{},"bathroom"," or in a ",[19,1854,1855],{},"damp location",[98,1857,1858],{},"The circuit is otherwise intact.",[72,1860,1862],{"id":1861},"_4-no-spd-surge-protection","4. No SPD (Surge Protection)",[15,1864,1865,1866,286],{},"The current AREI requires a Type 2 SPD (Surge Protection Device) for new installations. Under Part 8, this is ",[19,1867,1868],{},"not required",[72,1870,1872],{"id":1871},"_5-old-distribution-technology","5. Old Distribution Technology",[95,1874,1875,1881,1887],{},[98,1876,1877,1880],{},[19,1878,1879],{},"Fuses"," instead of MCBs are permitted.",[98,1882,1883,1886],{},[19,1884,1885],{},"Screw-type fuses"," (Diazed) are tolerated.",[98,1888,1889,1890,1893],{},"Missing ",[19,1891,1892],{},"labelling"," is noted as a deficiency but does not cause a failure.",[72,1895,1897],{"id":1896},"_6-no-fire-reaction-classification-of-cables","6. No Fire Reaction Classification of Cables",[15,1899,1900],{},"Cables without CPR classification (installed before 2017) are tolerated, as the CPR regulation only applies from July 2017 for new installations.",[24,1902],{},[27,1904,1906],{"id":1905},"what-is-not-permitted-even-under-part-8","What Is NOT Permitted (Even Under Part 8)?",[15,1908,1909,1910,1913],{},"Certain conditions are ",[19,1911,1912],{},"never tolerated",", regardless of the installation's age:",[72,1915,1917],{"id":1916},"absolutely-impermissible","Absolutely Impermissible:",[144,1919,1920,1930],{},[147,1921,1922],{},[150,1923,1924,1927],{},[153,1925,1926],{},"Condition",[153,1928,1929],{},"Why?",[160,1931,1932,1942,1952,1962,1972,1982,1992,2002],{},[150,1933,1934,1939],{},[165,1935,1936],{},[19,1937,1938],{},"Bare or damaged cables",[165,1940,1941],{},"Immediate electrocution risk",[150,1943,1944,1949],{},[165,1945,1946],{},[19,1947,1948],{},"Complete absence of earthing",[165,1950,1951],{},"No protection in case of insulation fault",[150,1953,1954,1959],{},[165,1955,1956],{},[19,1957,1958],{},"Water in contact with electrics",[165,1960,1961],{},"Danger to life",[150,1963,1964,1969],{},[165,1965,1966],{},[19,1967,1968],{},"Accessible live parts",[165,1970,1971],{},"Direct contact risk",[150,1973,1974,1979],{},[165,1975,1976],{},[19,1977,1978],{},"Overheated cables or connections",[165,1980,1981],{},"Fire risk",[150,1983,1984,1989],{},[165,1985,1986],{},[19,1987,1988],{},"Loose connections in junction boxes",[165,1990,1991],{},"Arc\u002Ffire risk",[150,1993,1994,1999],{},[165,1995,1996],{},[19,1997,1998],{},"Junction boxes without covers",[165,2000,2001],{},"Contact protection missing",[150,2003,2004,2009],{},[165,2005,2006],{},[19,2007,2008],{},"Bathroom socket in zone 0 or 1",[165,2010,2011],{},"Danger to life, prohibited even under Part 8",[72,2013,2015],{"id":2014},"safety-related-minimum-requirements","Safety-Related Minimum Requirements:",[15,2017,2018],{},"Even under Part 8, the following must be ensured:",[95,2020,2021,2027,2033,2039],{},[98,2022,2023,2026],{},[19,2024,2025],{},"Adequate cross-section"," for the actual load (no overloaded 0.75 mm² cable).",[98,2028,2029,2032],{},[19,2030,2031],{},"Functioning fuses"," (no \"bridged\" fuses).",[98,2034,2035,2038],{},[19,2036,2037],{},"Earthing of the main board"," (connection to earth electrode).",[98,2040,2041,2044],{},[19,2042,2043],{},"Accessibility"," of the distribution board.",[24,2046],{},[27,2048,2050],{"id":2049},"periodic-inspection","Periodic Inspection",[72,2052,2054],{"id":2053},"every-25-years-mandatory","Every 25 Years Mandatory",[15,2056,2057,2058,2061],{},"Existing installations under Part 8 must undergo a periodic inspection every ",[19,2059,2060],{},"25 years"," by an approved control body.",[72,2063,2065],{"id":2064},"on-change-of-ownership","On Change of Ownership",[15,2067,2068,2069,2072],{},"When ",[19,2070,2071],{},"selling a property",", a valid inspection certificate (less than 25 years old) is mandatory. If none exists, an inspection must be carried out before the sale.",[50,2074,2075],{},[15,2076,2077,2080,2081,2084],{},[19,2078,2079],{},"18-month deadline (Art. 8.4.2.2):"," When purchasing a property with a negative inspection report, the buyer has ",[19,2082,2083],{},"18 months"," from the purchase date to remedy the defects and have a re-inspection carried out.",[72,2086,2088],{"id":2087},"what-is-checked-during-the-periodic-inspection","What Is Checked During the Periodic Inspection?",[144,2090,2091,2101],{},[147,2092,2093],{},[150,2094,2095,2098],{},[153,2096,2097],{},"Inspection Point",[153,2099,2100],{},"Assessment",[160,2102,2103,2111,2119,2127,2135,2143,2151],{},[150,2104,2105,2108],{},[165,2106,2107],{},"Visual inspection of cables and connections",[165,2109,2110],{},"Damage, overheating",[150,2112,2113,2116],{},[165,2114,2115],{},"Earth resistance measurement",[165,2117,2118],{},"≤ 30 Ohm (regulatory threshold per Art. 4.2.4.3b; above this, additional protective measures required)",[150,2120,2121,2124],{},[165,2122,2123],{},"Insulation resistance measurement",[165,2125,2126],{},"> 0.5 MOhm",[150,2128,2129,2132],{},[165,2130,2131],{},"RCD test (if present)",[165,2133,2134],{},"Trip time and current",[150,2136,2137,2140],{},[165,2138,2139],{},"Short-circuit protection check",[165,2141,2142],{},"Fuses \u002F MCBs present",[150,2144,2145,2148],{},[165,2146,2147],{},"Protection against direct contact",[165,2149,2150],{},"Covers, IP protection",[150,2152,2153,2156],{},[165,2154,2155],{},"Documentation",[165,2157,2158],{},"Single-line diagram + situation plan present?",[50,2160,2161],{},[15,2162,2163,1818,2165,2168,2169,2172],{},[19,2164,1720],{},[19,2166,2167],{},"single-line diagram"," and a ",[19,2170,2171],{},"situation plan"," must be available — even if they need to be created retrospectively.",[24,2174],{},[27,2176,2178],{"id":2177},"the-contamination-rule-for-partial-renovations","The Contamination Rule for Partial Renovations",[15,2180,2181,2182,286],{},"A particularly important aspect for old buildings: the so-called ",[19,2183,2184],{},"contamination rule",[72,2186,2188],{"id":2187},"how-does-it-work","How Does It Work?",[15,2190,2191,2192,2195],{},"When you ",[19,2193,2194],{},"substantially modify"," part of your installation (e.g., adding new circuits):",[616,2197,2198,2205,2211],{},[98,2199,2200,2201,2204],{},"The ",[19,2202,2203],{},"new part"," must fully comply with the current AREI.",[98,2206,2200,2207,2210],{},[19,2208,2209],{},"existing part"," continues to be assessed under Part 8.",[98,2212,2213,2216],{},[19,2214,2215],{},"BUT:"," If the new part \"contaminates\" the existing part (e.g., new cables in the same distribution board), the inspector may decide that the entire board must comply with the current AREI.",[72,2218,2220],{"id":2219},"practical-consequences","Practical Consequences:",[95,2222,2223,2229,2236],{},[98,2224,2225,2226,286],{},"Plan renovations so that new and old parts are ",[19,2227,2228],{},"clearly separated",[98,2230,2231,2232,2235],{},"Ideally, use a ",[19,2233,2234],{},"separate sub-board"," for new circuits.",[98,2237,2238],{},"Document precisely what is old and what is new.",[24,2240],{},[27,2242,2244],{"id":2243},"recommendation-gradual-modernisation","Recommendation: Gradual Modernisation",[15,2246,2247,2248,2251],{},"Even though Part 8 tolerates deviations, ",[19,2249,2250],{},"gradual modernisation"," is recommended:",[72,2253,2255],{"id":2254},"priority-1-safety-critical","Priority 1 (Safety-Critical)",[95,2257,2258,2261,2264,2267],{},[98,2259,2260],{},"Retrofit a 300 mA main RCD (if not present)",[98,2262,2263],{},"Replace damaged cables",[98,2265,2266],{},"Fix loose connections",[98,2268,2269],{},"Check and improve earthing if necessary",[72,2271,2273],{"id":2272},"priority-2-recommended","Priority 2 (Recommended)",[95,2275,2276,2279,2282],{},[98,2277,2278],{},"30 mA group RCDs for bathroom and kitchen",[98,2280,2281],{},"Replace old fuses with MCBs",[98,2283,2284],{},"Retrofit SPD Type 2",[72,2286,2288],{"id":2287},"priority-3-comfort-future-proofing","Priority 3 (Comfort + Future-Proofing)",[95,2290,2291,2294,2297],{},[98,2292,2293],{},"Modernise the board (more rows, labelling)",[98,2295,2296],{},"Retrofit socket outlets with earth",[98,2298,2299],{},"Preparation for EV charger \u002F PV system",[72,2301,2303],{"id":2302},"cost-orientation","Cost Orientation",[144,2305,2306,2316],{},[147,2307,2308],{},[150,2309,2310,2313],{},[153,2311,2312],{},"Measure",[153,2314,2315],{},"Estimated Cost",[160,2317,2318,2326,2334,2342,2350,2358],{},[150,2319,2320,2323],{},[165,2321,2322],{},"Retrofit 300 mA main RCD",[165,2324,2325],{},"EUR 150–300",[150,2327,2328,2331],{},[165,2329,2330],{},"30 mA group RCD (each)",[165,2332,2333],{},"EUR 80–150",[150,2335,2336,2339],{},[165,2337,2338],{},"SPD Type 2",[165,2340,2341],{},"EUR 100–250",[150,2343,2344,2347],{},[165,2345,2346],{},"MCB set (10 pieces)",[165,2348,2349],{},"EUR 50–100",[150,2351,2352,2355],{},[165,2353,2354],{},"New 4-row board (complete)",[165,2356,2357],{},"EUR 500–1,500",[150,2359,2360,2363],{},[165,2361,2362],{},"Complete rewiring (house)",[165,2364,2365],{},"EUR 5,000–15,000",[24,2367],{},[27,2369,2371],{"id":2370},"summary","Summary",[144,2373,2374,2384],{},[147,2375,2376],{},[150,2377,2378,2381],{},[153,2379,2380],{},"Question",[153,2382,2383],{},"Answer",[160,2385,2386,2394,2402,2410,2418],{},[150,2387,2388,2391],{},[165,2389,2390],{},"Does my old building need to comply with the current AREI?",[165,2392,2393],{},"Not fully, Part 8 permits deviations",[150,2395,2396,2399],{},[165,2397,2398],{},"Do I need a 30 mA RCD?",[165,2400,2401],{},"Not mandatory under Part 8, but strongly recommended",[150,2403,2404,2407],{},[165,2405,2406],{},"Are old sockets without earth permitted?",[165,2408,2409],{},"Under conditions yes (no bathroom, no Class I appliances)",[150,2411,2412,2415],{},[165,2413,2414],{},"How often must inspections take place?",[165,2416,2417],{},"Every 25 years + on change of ownership",[150,2419,2420,2423],{},[165,2421,2422],{},"What about partial renovation?",[165,2424,2425],{},"New part = current AREI, old part = Part 8 (contamination rule applies)",[24,2427],{},[27,2429,2431],{"id":2430},"related-articles","Related Articles",[95,2433,2434,2440,2446,2452],{},[98,2435,2436],{},[858,2437,2439],{"href":2438},"\u002Fen\u002Fblog\u002Felectrical-inspection","Electrical Inspection in Belgium: What Is Checked?",[98,2441,2442],{},[858,2443,2445],{"href":2444},"\u002Fen\u002Fblog\u002Farei-2026-changes","What Changes with the AREI 2026?",[98,2447,2448],{},[858,2449,2451],{"href":2450},"\u002Fen\u002Fblog\u002Fpreflex-vs-open-wiring","Preflex vs. Open Wiring",[98,2453,2454],{},[858,2455,2457],{"href":2456},"\u002Fen\u002Fblog\u002Fdistribution-board-planning-guide","Distribution Board Planning",[24,2459],{},[15,2461,2462],{},[885,2463,2464,2465,2467,2468],{},"For older buildings, ",[19,2466,890],{}," helps build the single-line diagram and situation plan digitally. The self-check is advisory; have the documents and applicable derogations reviewed professionally. ",[858,2469,2470],{"href":894},"Start for free →",{"title":897,"searchDepth":898,"depth":898,"links":2472},[2473,2474,2479,2487,2491,2496,2500,2506,2507],{"id":1625,"depth":898,"text":1626},{"id":1657,"depth":898,"text":1658,"children":2475},[2476,2477,2478],{"id":1668,"depth":904,"text":1669},{"id":1675,"depth":904,"text":1676},{"id":1686,"depth":904,"text":1687},{"id":1726,"depth":898,"text":1727,"children":2480},[2481,2482,2483,2484,2485,2486],{"id":1733,"depth":904,"text":1734},{"id":1774,"depth":904,"text":1775},{"id":1825,"depth":904,"text":1826},{"id":1861,"depth":904,"text":1862},{"id":1871,"depth":904,"text":1872},{"id":1896,"depth":904,"text":1897},{"id":1905,"depth":898,"text":1906,"children":2488},[2489,2490],{"id":1916,"depth":904,"text":1917},{"id":2014,"depth":904,"text":2015},{"id":2049,"depth":898,"text":2050,"children":2492},[2493,2494,2495],{"id":2053,"depth":904,"text":2054},{"id":2064,"depth":904,"text":2065},{"id":2087,"depth":904,"text":2088},{"id":2177,"depth":898,"text":2178,"children":2497},[2498,2499],{"id":2187,"depth":904,"text":2188},{"id":2219,"depth":904,"text":2220},{"id":2243,"depth":898,"text":2244,"children":2501},[2502,2503,2504,2505],{"id":2254,"depth":904,"text":2255},{"id":2272,"depth":904,"text":2273},{"id":2287,"depth":904,"text":2288},{"id":2302,"depth":904,"text":2303},{"id":2370,"depth":898,"text":2371},{"id":2430,"depth":898,"text":2431},"What applies to older electrical installations in Belgium. AREI Part 8 explained: permitted deviations, periodic inspection, and tips for gradual modernisation.","en",{},"\u002Fblog\u002Fold-building-arei-part8.en",{"title":1609,"description":2508},"old-building-arei-part-8","blog\u002Fold-building-arei-part8.en",[2516,952,953,2517,2518,2519,2520],"old building","existing installation","renovation","inspection","periodic","3mUSkcLD_yqcR9pr9ReIxXoediuq8vIB4IlyOuBNzg4",{"id":2523,"title":2524,"articleId":6,"body":2525,"category":936,"date":937,"description":3418,"extension":939,"lastUpdated":940,"locale":3419,"meta":3420,"navigation":943,"path":3421,"publishDate":937,"readTime":945,"refreshInterval":946,"seo":3422,"slug":3423,"stem":3424,"tags":3425,"__hash__":3432},"blog\u002Fblog\u002Fold-building-arei-part8.fr.md","Ancien bâtiment et RGIE Partie 8 : Règles spéciales pour les installations existantes",{"type":8,"value":2526,"toc":3381},[2527,2530,2537,2539,2543,2550,2561,2569,2571,2575,2582,2586,2589,2593,2600,2604,2630,2638,2640,2644,2647,2651,2689,2693,2729,2741,2745,2748,2777,2781,2787,2791,2813,2817,2820,2822,2826,2833,2837,2931,2935,2938,2964,2966,2970,2974,2981,2985,2992,3004,3008,3076,3090,3092,3096,3102,3106,3113,3134,3138,3156,3158,3162,3169,3173,3187,3191,3202,3206,3217,3221,3277,3279,3283,3336,3338,3342,3368,3370],[11,2528,2524],{"id":2529},"ancien-bâtiment-et-rgie-partie-8-règles-spéciales-pour-les-installations-existantes",[15,2531,2532,2533,2536],{},"Toute installation électrique en Belgique ne doit pas forcément répondre aux dernières prescriptions du RGIE. Pour les bâtiments plus anciens, la ",[19,2534,2535],{},"Partie 8"," constitue un ensemble de règles spécifiques qui tolère certaines dérogations par rapport au standard actuel — tant qu'il n'existe pas de danger immédiat. Cet article explique quand la Partie 8 s'applique, ce qui est autorisé et où se trouvent les limites.",[24,2538],{},[27,2540,2542],{"id":2541},"quest-ce-que-la-partie-8","Qu'est-ce que la Partie 8 ?",[15,2544,2545,2546,2549],{},"La Partie 8 du RGIE (Règlement Général sur les Installations Électriques) est une ",[19,2547,2548],{},"réglementation spéciale pour les installations existantes"," qui ont été réalisées et réceptionnées avant l'entrée en vigueur du RGIE actuel.",[15,2551,2552,2553,2556,2557,2560],{},"Le principe de base : tant qu'une installation fonctionne de manière ",[19,2554,2555],{},"sûre"," et ne représente ",[19,2558,2559],{},"aucun danger immédiat",", elle n'a pas à être entièrement mise aux normes actuelles — même si elle ne répond pas à toutes les prescriptions en vigueur.",[50,2562,2563],{},[15,2564,2565,2568],{},[19,2566,2567],{},"Important :"," La Partie 8 n'est pas un blanc-seing. Elle définit clairement quelles dérogations sont tolérées et lesquelles ne le sont pas.",[24,2570],{},[27,2572,2574],{"id":2573},"quand-la-partie-8-sapplique-t-elle","Quand la Partie 8 s'applique-t-elle ?",[15,2576,2577,2578,2581],{},"La Partie 8 s'applique aux installations qui remplissent ",[19,2579,2580],{},"l'une"," des conditions suivantes :",[72,2583,2585],{"id":2584},"condition-1-installation-avant-le-01101981","Condition 1 : Installation avant le 01.10.1981",[15,2587,2588],{},"Les installations réalisées avant le 1er octobre 1981 (date d'entrée en vigueur du RGIE original) tombent en principe sous la Partie 8.",[72,2590,2592],{"id":2591},"condition-2-réceptionnée-sous-lancien-rgie","Condition 2 : Réceptionnée sous l'ancien RGIE",[15,2594,2595,2596,2599],{},"Les installations qui ont été réceptionnées sous une version antérieure du RGIE et qui n'ont ",[19,2597,2598],{},"pas été substantiellement modifiées"," depuis la dernière réception.",[72,2601,2603],{"id":2602},"quest-ce-quune-modification-substantielle","Qu'est-ce qu'une « modification substantielle » ?",[95,2605,2606,2612,2618,2624],{},[98,2607,2608,2609],{},"Ajout de ",[19,2610,2611],{},"nouveaux circuits",[98,2613,2614,2615],{},"Extension du ",[19,2616,2617],{},"tableau de distribution",[98,2619,2620,2621],{},"Modification de l'",[19,2622,2623],{},"installation de comptage",[98,2625,2626,2629],{},[19,2627,2628],{},"Recâblage"," important",[50,2631,2632],{},[15,2633,2634,2637],{},[19,2635,2636],{},"Attention :"," Les petites modifications comme le remplacement d'une prise ou d'un interrupteur ne comptent PAS comme modification substantielle.",[24,2639],{},[27,2641,2643],{"id":2642},"ce-qui-est-autorisé-sous-la-partie-8-dérogations-tolérées","Ce qui est autorisé sous la Partie 8 (Dérogations tolérées)",[15,2645,2646],{},"Les points suivants s'écartent du RGIE actuel, mais sont tolérés sous la Partie 8 lors du contrôle :",[72,2648,2650],{"id":2649},"_1-anciens-types-de-câbles","1. Anciens types de câbles",[144,2652,2653,2663],{},[147,2654,2655],{},[150,2656,2657,2660],{},[153,2658,2659],{},"RGIE actuel",[153,2661,2662],{},"Partie 8 tolère",[160,2664,2665,2673,2681],{},[150,2666,2667,2670],{},[165,2668,2669],{},"XVB \u002F VOBst en Preflex",[165,2671,2672],{},"Câbles VOB dans d'anciennes gaines",[150,2674,2675,2678],{},[165,2676,2677],{},"Classe de réaction au feu Cca",[165,2679,2680],{},"Types de câbles plus anciens sans classification CPR",[150,2682,2683,2686],{},[165,2684,2685],{},"Section minimale 2,5 mm² pour les prises",[165,2687,2688],{},"Minimum 1 mm² avec fusible max. 6 A ou disjoncteur max. 10 A (Art. 8.2.1 Nr. 5)",[72,2690,2692],{"id":2691},"_2-différentiels-rcd","2. Différentiels (RCD)",[144,2694,2695,2703],{},[147,2696,2697],{},[150,2698,2699,2701],{},[153,2700,2659],{},[153,2702,2662],{},[160,2704,2705,2713,2721],{},[150,2706,2707,2710],{},[165,2708,2709],{},"Différentiel 30 mA par circuit prises",[165,2711,2712],{},"Pas de 30 mA nécessaire (seulement 300 mA principal)",[150,2714,2715,2718],{},[165,2716,2717],{},"Différentiel 30 mA obligatoire pour salle de bain",[165,2719,2720],{},"Reste obligatoire (non couvert par la dérogation Partie 8, Art. 4.2.4.3 b N° 3 \u002F Art. 7.1.4.3)",[150,2722,2723,2726],{},[165,2724,2725],{},"Max. 8 circuits par RCD",[165,2727,2728],{},"Plus de circuits autorisés",[50,2730,2731],{},[15,2732,2733,2736,2737,2740],{},[19,2734,2735],{},"Note :"," Même sous la Partie 8, un ",[19,2738,2739],{},"différentiel principal 300 mA"," est recommandé et souvent exigé par le gestionnaire de réseau lors d'une nouvelle installation de compteur.",[72,2742,2744],{"id":2743},"_3-prises-sans-contact-de-terre","3. Prises sans contact de terre",[15,2746,2747],{},"Les anciennes prises (type C, sans broche de terre) sont tolérées sous la Partie 8, à condition que :",[95,2749,2750,2757,2764,2774],{},[98,2751,2752,2753,2756],{},"La prise soit protégée par un ",[19,2754,2755],{},"différentiel à haute ou très haute sensibilité"," (max. 30 mA) (Art. 8.2.1 N° 6 lettre b).",[98,2758,2759,2760,2763],{},"Aucun appareil de ",[19,2761,2762],{},"classe de protection I"," (avec boîtier métallique) ne soit branché.",[98,2765,2766,2767,2770,2771,286],{},"La prise ne soit pas dans la ",[19,2768,2769],{},"salle de bain"," ou dans un ",[19,2772,2773],{},"lieu humide",[98,2775,2776],{},"Le circuit soit par ailleurs intact.",[72,2778,2780],{"id":2779},"_4-pas-de-parafoudre-spd","4. Pas de parafoudre (SPD)",[15,2782,2783,2784,286],{},"Le RGIE actuel prescrit un parafoudre (SPD) Type 2 pour les nouvelles installations. Sous la Partie 8, ce n'est ",[19,2785,2786],{},"pas requis",[72,2788,2790],{"id":2789},"_5-ancienne-technique-de-distribution","5. Ancienne technique de distribution",[95,2792,2793,2800,2806],{},[98,2794,2795,2796,2799],{},"Les ",[19,2797,2798],{},"fusibles"," au lieu de disjoncteurs sont autorisés.",[98,2801,2795,2802,2805],{},[19,2803,2804],{},"fusibles à vis"," (Diazed) sont tolérés.",[98,2807,2808,2809,2812],{},"L'absence d'",[19,2810,2811],{},"étiquetage"," est mentionnée comme défaut, mais n'entraîne pas un échec.",[72,2814,2816],{"id":2815},"_6-pas-de-classification-de-réaction-au-feu-des-câbles","6. Pas de classification de réaction au feu des câbles",[15,2818,2819],{},"Les câbles sans classification CPR (installés avant 2017) sont tolérés, car le règlement CPR ne s'applique qu'à partir de juillet 2017 pour les nouvelles installations.",[24,2821],{},[27,2823,2825],{"id":2824},"ce-qui-nest-pas-autorisé-même-sous-la-partie-8","Ce qui n'est PAS autorisé (même sous la Partie 8)",[15,2827,2828,2829,2832],{},"Certaines situations ne sont ",[19,2830,2831],{},"jamais tolérées",", quel que soit l'âge de l'installation :",[72,2834,2836],{"id":2835},"absolument-inadmissible","Absolument inadmissible :",[144,2838,2839,2849],{},[147,2840,2841],{},[150,2842,2843,2846],{},[153,2844,2845],{},"Situation",[153,2847,2848],{},"Pourquoi ?",[160,2850,2851,2861,2871,2881,2891,2901,2911,2921],{},[150,2852,2853,2858],{},[165,2854,2855],{},[19,2856,2857],{},"Câbles dénudés ou endommagés",[165,2859,2860],{},"Danger immédiat d'électrocution",[150,2862,2863,2868],{},[165,2864,2865],{},[19,2866,2867],{},"Absence totale de mise à la terre",[165,2869,2870],{},"Pas de protection en cas de défaut d'isolement",[150,2872,2873,2878],{},[165,2874,2875],{},[19,2876,2877],{},"Eau en contact avec l'électricité",[165,2879,2880],{},"Danger de mort",[150,2882,2883,2888],{},[165,2884,2885],{},[19,2886,2887],{},"Parties sous tension accessibles",[165,2889,2890],{},"Risque de contact direct",[150,2892,2893,2898],{},[165,2894,2895],{},[19,2896,2897],{},"Câbles ou connexions en surchauffe",[165,2899,2900],{},"Risque d'incendie",[150,2902,2903,2908],{},[165,2904,2905],{},[19,2906,2907],{},"Connexions desserrées dans les boîtes de dérivation",[165,2909,2910],{},"Risque d'arc\u002Fincendie",[150,2912,2913,2918],{},[165,2914,2915],{},[19,2916,2917],{},"Boîtes de dérivation sans couvercle",[165,2919,2920],{},"Protection contre les contacts manquante",[150,2922,2923,2928],{},[165,2924,2925],{},[19,2926,2927],{},"Prise de salle de bain en zone 0 ou 1",[165,2929,2930],{},"Danger de mort, interdit même sous Partie 8",[72,2932,2934],{"id":2933},"exigences-minimales-de-sécurité","Exigences minimales de sécurité :",[15,2936,2937],{},"Même sous la Partie 8, il faut garantir :",[95,2939,2940,2946,2952,2958],{},[98,2941,2942,2945],{},[19,2943,2944],{},"Section suffisante"," pour la charge réelle (pas de câble 0,75 mm² surchargé).",[98,2947,2948,2951],{},[19,2949,2950],{},"Fusibles fonctionnels"," (pas de fusibles « pontés »).",[98,2953,2954,2957],{},[19,2955,2956],{},"Mise à la terre du tableau principal"," (connexion à l'électrode de terre).",[98,2959,2960,2963],{},[19,2961,2962],{},"Accessibilité"," du tableau de distribution.",[24,2965],{},[27,2967,2969],{"id":2968},"contrôle-périodique","Contrôle périodique",[72,2971,2973],{"id":2972},"tous-les-25-ans-obligatoire","Tous les 25 ans obligatoire",[15,2975,2976,2977,2980],{},"Les installations existantes sous la Partie 8 doivent subir un contrôle périodique tous les ",[19,2978,2979],{},"25 ans"," par un organisme de contrôle agréé.",[72,2982,2984],{"id":2983},"lors-dun-changement-de-propriétaire","Lors d'un changement de propriétaire",[15,2986,2987,2988,2991],{},"Lors de la ",[19,2989,2990],{},"vente d'un bien immobilier",", une attestation de contrôle valide (de moins de 25 ans) est obligatoire. Si elle n'existe pas, un contrôle doit être effectué avant la vente.",[50,2993,2994],{},[15,2995,2996,2999,3000,3003],{},[19,2997,2998],{},"Délai de 18 mois (Art. 8.4.2.2) :"," Lors de l'achat d'un bien immobilier avec un rapport de contrôle négatif, l'acheteur dispose de ",[19,3001,3002],{},"18 mois"," à compter de la date d'achat pour remédier aux défauts et faire effectuer un recontrôle.",[72,3005,3007],{"id":3006},"que-vérifie-t-on-lors-du-contrôle-périodique","Que vérifie-t-on lors du contrôle périodique ?",[144,3009,3010,3020],{},[147,3011,3012],{},[150,3013,3014,3017],{},[153,3015,3016],{},"Point de contrôle",[153,3018,3019],{},"Évaluation",[160,3021,3022,3030,3038,3045,3053,3061,3069],{},[150,3023,3024,3027],{},[165,3025,3026],{},"Inspection visuelle des câbles et connexions",[165,3028,3029],{},"Dommages, surchauffe",[150,3031,3032,3035],{},[165,3033,3034],{},"Mesure de la résistance de terre",[165,3036,3037],{},"≤ 30 Ω (seuil réglementaire selon Art. 4.2.4.3b ; au-delà, des mesures de protection supplémentaires sont nécessaires)",[150,3039,3040,3043],{},[165,3041,3042],{},"Mesure de la résistance d'isolement",[165,3044,544],{},[150,3046,3047,3050],{},[165,3048,3049],{},"Test RCD (si présent)",[165,3051,3052],{},"Temps et courant de déclenchement",[150,3054,3055,3058],{},[165,3056,3057],{},"Vérification de la protection contre les courts-circuits",[165,3059,3060],{},"Fusibles \u002F disjoncteurs présents",[150,3062,3063,3066],{},[165,3064,3065],{},"Protection contre les contacts directs",[165,3067,3068],{},"Couvercles, protection IP",[150,3070,3071,3073],{},[165,3072,2155],{},[165,3074,3075],{},"Schéma unifilaire + plan de situation présents ?",[50,3077,3078],{},[15,3079,3080,2736,3082,3085,3086,3089],{},[19,3081,2735],{},[19,3083,3084],{},"schéma unifilaire"," et un ",[19,3087,3088],{},"plan de situation"," doivent être disponibles — même s'ils doivent être établis rétroactivement.",[24,3091],{},[27,3093,3095],{"id":3094},"la-règle-de-contamination-lors-dune-rénovation-partielle","La règle de contamination lors d'une rénovation partielle",[15,3097,3098,3099,286],{},"Un aspect particulièrement important pour les anciens bâtiments : la ",[19,3100,3101],{},"règle de contamination",[72,3103,3105],{"id":3104},"comment-fonctionne-t-elle","Comment fonctionne-t-elle ?",[15,3107,3108,3109,3112],{},"Lorsque vous modifiez ",[19,3110,3111],{},"substantiellement"," une partie de votre installation (par ex. ajout de nouveaux circuits) :",[616,3114,3115,3122,3128],{},[98,3116,3117,3118,3121],{},"La ",[19,3119,3120],{},"nouvelle partie"," doit entièrement répondre au RGIE actuel.",[98,3123,3117,3124,3127],{},[19,3125,3126],{},"partie existante"," continue d'être évaluée selon la Partie 8.",[98,3129,3130,3133],{},[19,3131,3132],{},"MAIS :"," Si la nouvelle partie « contamine » la partie existante (par ex. nouveaux câbles dans le même tableau), le contrôleur peut décider que l'ensemble du tableau doit répondre au RGIE actuel.",[72,3135,3137],{"id":3136},"conséquences-pratiques","Conséquences pratiques :",[95,3139,3140,3146,3153],{},[98,3141,3142,3143,286],{},"Planifiez les rénovations de manière à ce que les parties nouvelles et anciennes soient ",[19,3144,3145],{},"clairement séparées",[98,3147,3148,3149,3152],{},"Idéalement, un ",[19,3150,3151],{},"sous-tableau séparé"," pour les nouveaux circuits.",[98,3154,3155],{},"Documentez précisément ce qui est ancien et ce qui est nouveau.",[24,3157],{},[27,3159,3161],{"id":3160},"recommandation-modernisation-progressive","Recommandation : Modernisation progressive",[15,3163,3164,3165,3168],{},"Même si la Partie 8 tolère des dérogations, une ",[19,3166,3167],{},"modernisation progressive"," est recommandée :",[72,3170,3172],{"id":3171},"priorité-1-critique-pour-la-sécurité","Priorité 1 (Critique pour la sécurité)",[95,3174,3175,3178,3181,3184],{},[98,3176,3177],{},"Installer un différentiel principal 300 mA (s'il est absent)",[98,3179,3180],{},"Remplacer les câbles endommagés",[98,3182,3183],{},"Réparer les connexions desserrées",[98,3185,3186],{},"Vérifier et améliorer la mise à la terre si nécessaire",[72,3188,3190],{"id":3189},"priorité-2-recommandé","Priorité 2 (Recommandé)",[95,3192,3193,3196,3199],{},[98,3194,3195],{},"Différentiels de groupe 30 mA pour salle de bain et cuisine",[98,3197,3198],{},"Remplacer les anciens fusibles par des disjoncteurs",[98,3200,3201],{},"Installer un parafoudre Type 2",[72,3203,3205],{"id":3204},"priorité-3-confort-pérennité","Priorité 3 (Confort + pérennité)",[95,3207,3208,3211,3214],{},[98,3209,3210],{},"Moderniser le tableau (plus de rangées, étiquetage)",[98,3212,3213],{},"Installer des prises avec terre",[98,3215,3216],{},"Préparation pour borne de recharge \u002F installation PV",[72,3218,3220],{"id":3219},"orientation-des-coûts","Orientation des coûts",[144,3222,3223,3233],{},[147,3224,3225],{},[150,3226,3227,3230],{},[153,3228,3229],{},"Mesure",[153,3231,3232],{},"Coût estimé",[160,3234,3235,3242,3249,3256,3263,3270],{},[150,3236,3237,3240],{},[165,3238,3239],{},"Installer différentiel principal 300 mA",[165,3241,746],{},[150,3243,3244,3247],{},[165,3245,3246],{},"Différentiel de groupe 30 mA (par pièce)",[165,3248,754],{},[150,3250,3251,3254],{},[165,3252,3253],{},"Parafoudre Type 2",[165,3255,762],{},[150,3257,3258,3261],{},[165,3259,3260],{},"Set de disjoncteurs (10 pièces)",[165,3262,770],{},[150,3264,3265,3268],{},[165,3266,3267],{},"Nouveau tableau 4 rangées (complet)",[165,3269,778],{},[150,3271,3272,3275],{},[165,3273,3274],{},"Recâblage complet (maison)",[165,3276,786],{},[24,3278],{},[27,3280,3282],{"id":3281},"résumé","Résumé",[144,3284,3285,3294],{},[147,3286,3287],{},[150,3288,3289,3291],{},[153,3290,2380],{},[153,3292,3293],{},"Réponse",[160,3295,3296,3304,3312,3320,3328],{},[150,3297,3298,3301],{},[165,3299,3300],{},"Mon ancien bâtiment doit-il répondre au RGIE actuel ?",[165,3302,3303],{},"Pas entièrement, la Partie 8 autorise des dérogations",[150,3305,3306,3309],{},[165,3307,3308],{},"Ai-je besoin d'un différentiel 30 mA ?",[165,3310,3311],{},"Pas obligatoire sous Partie 8, mais fortement recommandé",[150,3313,3314,3317],{},[165,3315,3316],{},"Les anciennes prises sans terre sont-elles autorisées ?",[165,3318,3319],{},"Sous conditions oui (pas de salle de bain, pas d'appareils classe I)",[150,3321,3322,3325],{},[165,3323,3324],{},"À quelle fréquence faut-il contrôler ?",[165,3326,3327],{},"Tous les 25 ans + lors d'un changement de propriétaire",[150,3329,3330,3333],{},[165,3331,3332],{},"Que se passe-t-il en cas de rénovation partielle ?",[165,3334,3335],{},"Nouvelle partie = RGIE actuel, ancienne = Partie 8 (règle de contamination)",[24,3337],{},[27,3339,3341],{"id":3340},"articles-connexes","Articles connexes",[95,3343,3344,3350,3356,3362],{},[98,3345,3346],{},[858,3347,3349],{"href":3348},"\u002Ffr\u002Fblog\u002Fcontrole-electrique","Contrôle électrique en Belgique : Que vérifie-t-on ?",[98,3351,3352],{},[858,3353,3355],{"href":3354},"\u002Ffr\u002Fblog\u002Frgie-2026-changements","Que change le RGIE 2026 ?",[98,3357,3358],{},[858,3359,3361],{"href":3360},"\u002Ffr\u002Fblog\u002Fpreflex-vs-pose-libre","Preflex vs. pose libre",[98,3363,3364],{},[858,3365,3367],{"href":3366},"\u002Ffr\u002Fblog\u002Fplanifier-tableau-electrique","Planifier un tableau électrique",[24,3369],{},[15,3371,3372],{},[885,3373,3374,3375,3377,3378],{},"Même pour les anciens bâtiments, ",[19,3376,890],{}," aide à construire numériquement le schéma unifilaire et le plan de situation. L'auto-contrôle est indicatif ; faites vérifier les documents et les dérogations applicables par un professionnel. ",[858,3379,3380],{"href":894},"Commencer gratuitement →",{"title":897,"searchDepth":898,"depth":898,"links":3382},[3383,3384,3389,3397,3401,3406,3410,3416,3417],{"id":2541,"depth":898,"text":2542},{"id":2573,"depth":898,"text":2574,"children":3385},[3386,3387,3388],{"id":2584,"depth":904,"text":2585},{"id":2591,"depth":904,"text":2592},{"id":2602,"depth":904,"text":2603},{"id":2642,"depth":898,"text":2643,"children":3390},[3391,3392,3393,3394,3395,3396],{"id":2649,"depth":904,"text":2650},{"id":2691,"depth":904,"text":2692},{"id":2743,"depth":904,"text":2744},{"id":2779,"depth":904,"text":2780},{"id":2789,"depth":904,"text":2790},{"id":2815,"depth":904,"text":2816},{"id":2824,"depth":898,"text":2825,"children":3398},[3399,3400],{"id":2835,"depth":904,"text":2836},{"id":2933,"depth":904,"text":2934},{"id":2968,"depth":898,"text":2969,"children":3402},[3403,3404,3405],{"id":2972,"depth":904,"text":2973},{"id":2983,"depth":904,"text":2984},{"id":3006,"depth":904,"text":3007},{"id":3094,"depth":898,"text":3095,"children":3407},[3408,3409],{"id":3104,"depth":904,"text":3105},{"id":3136,"depth":904,"text":3137},{"id":3160,"depth":898,"text":3161,"children":3411},[3412,3413,3414,3415],{"id":3171,"depth":904,"text":3172},{"id":3189,"depth":904,"text":3190},{"id":3204,"depth":904,"text":3205},{"id":3219,"depth":904,"text":3220},{"id":3281,"depth":898,"text":3282},{"id":3340,"depth":898,"text":3341},"Ce qui s'applique aux anciennes installations électriques en Belgique. RGIE Partie 8 expliqué : dérogations autorisées, contrôle périodique et conseils pour une modernisation progressive.","fr",{},"\u002Fblog\u002Fold-building-arei-part8.fr",{"title":2524,"description":3418},"ancien-rgie-part-8","blog\u002Fold-building-arei-part8.fr",[3426,3427,2535,3428,3429,3430,3431],"ancien bâtiment","RGIE","installation existante","rénovation","contrôle","périodique","omOCczz1zDQZeVaE62RW1l8-T0oTm2JMKjCL3B7oMdM",{"id":3434,"title":3435,"articleId":6,"body":3436,"category":936,"date":937,"description":4330,"extension":939,"lastUpdated":940,"locale":4331,"meta":4332,"navigation":943,"path":4333,"publishDate":937,"readTime":945,"refreshInterval":946,"seo":4334,"slug":4335,"stem":4336,"tags":4337,"__hash__":4343},"blog\u002Fblog\u002Fold-building-arei-part8.nl.md","Oudere installaties en AREI Part 8: Bijzondere regels voor bestaande installaties",{"type":8,"value":3437,"toc":4293},[3438,3441,3447,3449,3453,3460,3471,3479,3481,3485,3492,3496,3499,3503,3510,3514,3540,3548,3550,3554,3557,3561,3598,3602,3638,3650,3654,3657,3687,3691,3697,3701,3722,3726,3729,3731,3735,3742,3746,3840,3844,3847,3873,3875,3879,3883,3890,3894,3901,3913,3917,3986,4001,4003,4007,4014,4018,4025,4046,4050,4068,4070,4074,4081,4085,4099,4103,4114,4118,4129,4133,4188,4190,4194,4248,4250,4254,4280,4282],[11,3439,3435],{"id":3440},"oudere-installaties-en-arei-part-8-bijzondere-regels-voor-bestaande-installaties",[15,3442,3443,3444,3446],{},"Niet elke elektrische installatie in België moet aan de nieuwste AREI-voorschriften voldoen. Voor oudere gebouwen bestaat er met ",[19,3445,21],{}," een apart regelwerk dat bepaalde afwijkingen van de huidige standaard tolereert — zolang er geen onmiddellijk gevaar bestaat. Dit artikel legt uit wanneer Part 8 geldt, wat toegelaten is en waar de grenzen liggen.",[24,3448],{},[27,3450,3452],{"id":3451},"wat-is-part-8","Wat is Part 8?",[15,3454,3455,3456,3459],{},"Part 8 van het AREI (Algemeen Reglement op de Elektrische Installaties) is een ",[19,3457,3458],{},"bijzondere regeling voor bestaande installaties"," die vóór de inwerkingtreding van het huidige AREI werden aangelegd en gekeurd.",[15,3461,3462,3463,3466,3467,3470],{},"Het basisprincipe: zolang een installatie ",[19,3464,3465],{},"veilig"," functioneert en ",[19,3468,3469],{},"geen onmiddellijk gevaar"," vormt, hoeft ze niet volledig op de nieuwste stand gebracht te worden — ook al voldoet ze niet aan alle huidige voorschriften.",[50,3472,3473],{},[15,3474,3475,3478],{},[19,3476,3477],{},"Belangrijk:"," Part 8 is geen vrijbrief. Het definieert duidelijk welke afwijkingen getolereerd worden en welke niet.",[24,3480],{},[27,3482,3484],{"id":3483},"wanneer-geldt-part-8","Wanneer geldt Part 8?",[15,3486,3487,3488,3491],{},"Part 8 geldt voor installaties die aan ",[19,3489,3490],{},"één"," van de volgende voorwaarden voldoen:",[72,3493,3495],{"id":3494},"voorwaarde-1-installatie-vóór-01101981","Voorwaarde 1: Installatie vóór 01.10.1981",[15,3497,3498],{},"Installaties die vóór 1 oktober 1981 werden aangelegd (datum van inwerkingtreding van het oorspronkelijke AREI) vallen in principe onder Part 8.",[72,3500,3502],{"id":3501},"voorwaarde-2-onder-het-oude-arei-gekeurd","Voorwaarde 2: Onder het oude AREI gekeurd",[15,3504,3505,3506,3509],{},"Installaties die onder een eerdere versie van het AREI werden gekeurd en sindsdien ",[19,3507,3508],{},"niet wezenlijk gewijzigd"," zijn.",[72,3511,3513],{"id":3512},"wat-telt-als-wezenlijke-wijziging","Wat telt als \"wezenlijke wijziging\"?",[95,3515,3516,3522,3528,3534],{},[98,3517,3518,3519],{},"Toevoegen van ",[19,3520,3521],{},"nieuwe kringen",[98,3523,3524,3525],{},"Uitbreiding van de ",[19,3526,3527],{},"verdeelkast",[98,3529,3530,3531],{},"Wijziging van de ",[19,3532,3533],{},"meterinstallatie",[98,3535,3536,3537],{},"Omvangrijke ",[19,3538,3539],{},"herbekabeling",[50,3541,3542],{},[15,3543,3544,3547],{},[19,3545,3546],{},"Let op:"," Kleine wijzigingen zoals het vervangen van een stopcontact of schakelaar gelden NIET als wezenlijke wijziging.",[24,3549],{},[27,3551,3553],{"id":3552},"wat-is-onder-part-8-toegelaten-getolereerde-afwijkingen","Wat is onder Part 8 toegelaten? (Getolereerde afwijkingen)",[15,3555,3556],{},"De volgende punten wijken af van het huidige AREI, maar worden onder Part 8 bij de keuring getolereerd:",[72,3558,3560],{"id":3559},"_1-oude-kabeltypes","1. Oude kabeltypes",[144,3562,3563,3573],{},[147,3564,3565],{},[150,3566,3567,3570],{},[153,3568,3569],{},"Huidig AREI",[153,3571,3572],{},"Part 8 tolereert",[160,3574,3575,3582,3590],{},[150,3576,3577,3579],{},[165,3578,167],{},[165,3580,3581],{},"VOB-kabels in oude leidingen",[150,3583,3584,3587],{},[165,3585,3586],{},"Cca-brandveiligheidsklasse",[165,3588,3589],{},"Oudere kabeltypes zonder CPR-classificatie",[150,3591,3592,3595],{},[165,3593,3594],{},"Minimale doorsnede 2,5 mm² voor stopcontacten",[165,3596,3597],{},"Minimaal 1 mm² bij max. 6 A zekering of 10 A automaat (Art. 8.2.1 Nr. 5)",[72,3599,3601],{"id":3600},"_2-aardlekschakelaars-rcd-differentieelschakelaar","2. Aardlekschakelaars (RCD \u002F Differentieelschakelaar)",[144,3603,3604,3612],{},[147,3605,3606],{},[150,3607,3608,3610],{},[153,3609,3569],{},[153,3611,3572],{},[160,3613,3614,3622,3630],{},[150,3615,3616,3619],{},[165,3617,3618],{},"30 mA RCD per stopcontactkring",[165,3620,3621],{},"Geen 30 mA RCD nodig (alleen 300 mA hoofd-RCD)",[150,3623,3624,3627],{},[165,3625,3626],{},"30 mA RCD voor badkamer verplicht",[165,3628,3629],{},"Blijft verplicht (niet gedekt door de Part 8-afwijking, Art. 4.2.4.3 b nr. 3 \u002F Art. 7.1.4.3)",[150,3631,3632,3635],{},[165,3633,3634],{},"Max. 8 kringen per RCD",[165,3636,3637],{},"Meer kringen toegelaten",[50,3639,3640],{},[15,3641,3642,3645,3646,3649],{},[19,3643,3644],{},"Opmerking:"," Ook onder Part 8 wordt een ",[19,3647,3648],{},"300 mA hoofd-RCD"," aanbevolen en bij nieuwe meterinstallatie vaak door de netbeheerder vereist.",[72,3651,3653],{"id":3652},"_3-stopcontacten-zonder-aardingcontact","3. Stopcontacten zonder aardingcontact",[15,3655,3656],{},"Oude stopcontacten (type C, zonder aardpen) worden onder Part 8 getolereerd, op voorwaarde dat:",[95,3658,3659,3666,3673,3684],{},[98,3660,3661,3662,3665],{},"Het stopcontact beschermd wordt door een ",[19,3663,3664],{},"differentieelschakelaar met hoge of zeer hoge gevoeligheid"," (max. 30 mA) (Art. 8.2.1 nr. 6 letter b).",[98,3667,3668,3669,3672],{},"Geen toestellen van ",[19,3670,3671],{},"beschermingsklasse I"," (met metalen behuizing) worden aangesloten.",[98,3674,3675,3676,3679,3680,3683],{},"Het stopcontact niet in de ",[19,3677,3678],{},"badkamer"," of op ",[19,3681,3682],{},"vochtige plaatsen"," zit.",[98,3685,3686],{},"De kring verder intact is.",[72,3688,3690],{"id":3689},"_4-geen-spd-overspanningsbeveiliging","4. Geen SPD (overspanningsbeveiliging)",[15,3692,3693,3694,286],{},"Het huidige AREI schrijft voor nieuwe installaties een SPD (Surge Protection Device) Type 2 voor. Onder Part 8 is dit ",[19,3695,3696],{},"niet vereist",[72,3698,3700],{"id":3699},"_5-oude-verdeeltechniek","5. Oude verdeeltechniek",[95,3702,3703,3709,3715],{},[98,3704,3705,3708],{},[19,3706,3707],{},"Smeltzekeringen"," in plaats van MCBs zijn toegelaten.",[98,3710,3711,3714],{},[19,3712,3713],{},"Schroefzekeringen"," (Diazed) worden getolereerd.",[98,3716,3717,3718,3721],{},"Ontbrekende ",[19,3719,3720],{},"opschriften"," worden als gebrek vermeld, maar leiden niet tot afkeuring.",[72,3723,3725],{"id":3724},"_6-geen-brandveiligheidsclassificatie-van-kabels","6. Geen brandveiligheidsclassificatie van kabels",[15,3727,3728],{},"Kabels zonder CPR-classificatie (vóór 2017 geïnstalleerd) worden getolereerd, aangezien de CPR-verordening pas vanaf juli 2017 voor nieuwe installaties geldt.",[24,3730],{},[27,3732,3734],{"id":3733},"wat-is-niet-toegelaten-ook-onder-part-8","Wat is NIET toegelaten (ook onder Part 8)?",[15,3736,3737,3738,3741],{},"Bepaalde toestanden worden ",[19,3739,3740],{},"nooit getolereerd",", ongeacht de ouderdom van de installatie:",[72,3743,3745],{"id":3744},"absoluut-ongeoorloofd","Absoluut ongeoorloofd:",[144,3747,3748,3758],{},[147,3749,3750],{},[150,3751,3752,3755],{},[153,3753,3754],{},"Toestand",[153,3756,3757],{},"Waarom?",[160,3759,3760,3770,3780,3790,3800,3810,3820,3830],{},[150,3761,3762,3767],{},[165,3763,3764],{},[19,3765,3766],{},"Blote of beschadigde kabels",[165,3768,3769],{},"Onmiddellijk elektrocutiegevaar",[150,3771,3772,3777],{},[165,3773,3774],{},[19,3775,3776],{},"Volledig ontbrekende aarding",[165,3778,3779],{},"Geen bescherming bij isolatiefout",[150,3781,3782,3787],{},[165,3783,3784],{},[19,3785,3786],{},"Water in contact met elektriciteit",[165,3788,3789],{},"Levensgevaar",[150,3791,3792,3797],{},[165,3793,3794],{},[19,3795,3796],{},"Toegankelijke spanningvoerende delen",[165,3798,3799],{},"Direct aanrakingsrisico",[150,3801,3802,3807],{},[165,3803,3804],{},[19,3805,3806],{},"Oververhitte kabels of verbindingen",[165,3808,3809],{},"Brandgevaar",[150,3811,3812,3817],{},[165,3813,3814],{},[19,3815,3816],{},"Losse verbindingen in aftakdozen",[165,3818,3819],{},"Vlamboog-\u002Fbrandgevaar",[150,3821,3822,3827],{},[165,3823,3824],{},[19,3825,3826],{},"Aftakdozen zonder deksel",[165,3828,3829],{},"Aanrakingsbescherming ontbreekt",[150,3831,3832,3837],{},[165,3833,3834],{},[19,3835,3836],{},"Badkamer-stopcontact in zone 0 of 1",[165,3838,3839],{},"Levensgevaar, ook onder Part 8 verboden",[72,3841,3843],{"id":3842},"veiligheidsgerelateerde-minimumvereisten","Veiligheidsgerelateerde minimumvereisten:",[15,3845,3846],{},"Ook onder Part 8 moet gewaarborgd zijn:",[95,3848,3849,3855,3861,3867],{},[98,3850,3851,3854],{},[19,3852,3853],{},"Voldoende doorsnede"," voor de werkelijke belasting (geen overbelast 0,75 mm²-kabel).",[98,3856,3857,3860],{},[19,3858,3859],{},"Werkende zekeringen"," (geen \"overbrugde\" zekeringen).",[98,3862,3863,3866],{},[19,3864,3865],{},"Aarding van de hoofdverdeler"," (verbinding met aardingselektrode).",[98,3868,3869,3872],{},[19,3870,3871],{},"Toegankelijkheid"," van de verdeelkast.",[24,3874],{},[27,3876,3878],{"id":3877},"periodieke-keuring","Periodieke keuring",[72,3880,3882],{"id":3881},"elke-25-jaar-verplicht","Elke 25 jaar verplicht",[15,3884,3885,3886,3889],{},"Bestaande installaties onder Part 8 moeten elke ",[19,3887,3888],{},"25 jaar"," een periodieke keuring ondergaan door een erkend controleorganisme.",[72,3891,3893],{"id":3892},"bij-eigendomsoverdracht","Bij eigendomsoverdracht",[15,3895,3896,3897,3900],{},"Bij ",[19,3898,3899],{},"verkoop van een woning"," is een geldig keuringsattest (minder dan 25 jaar oud) verplicht. Ontbreekt dit, dan moet vóór de verkoop een keuring plaatsvinden.",[50,3902,3903],{},[15,3904,3905,3908,3909,3912],{},[19,3906,3907],{},"18-maandentermijn (Art. 8.4.2.2):"," Bij aankoop van een woning met een negatief keuringsverslag heeft de koper ",[19,3910,3911],{},"18 maanden"," vanaf de aankoopdatum om de gebreken te verhelpen en een herkeuring te laten uitvoeren.",[72,3914,3916],{"id":3915},"wat-wordt-bij-de-periodieke-keuring-gecontroleerd","Wat wordt bij de periodieke keuring gecontroleerd?",[144,3918,3919,3929],{},[147,3920,3921],{},[150,3922,3923,3926],{},[153,3924,3925],{},"Controlepunt",[153,3927,3928],{},"Beoordeling",[160,3930,3931,3939,3947,3954,3962,3970,3978],{},[150,3932,3933,3936],{},[165,3934,3935],{},"Visuele inspectie kabels en verbindingen",[165,3937,3938],{},"Beschadiging, oververhitting",[150,3940,3941,3944],{},[165,3942,3943],{},"Aardingsweerstand meten",[165,3945,3946],{},"≤ 30 Ω (reglementaire drempel conform Art. 4.2.4.3b; daarboven bijkomende beschermingsmaatregelen nodig)",[150,3948,3949,3952],{},[165,3950,3951],{},"Isolatieweerstand meten",[165,3953,544],{},[150,3955,3956,3959],{},[165,3957,3958],{},"RCD-test (indien aanwezig)",[165,3960,3961],{},"Uitschakeltijd en -stroom",[150,3963,3964,3967],{},[165,3965,3966],{},"Kortsluitbeveiliging controleren",[165,3968,3969],{},"Zekeringen \u002F MCBs aanwezig",[150,3971,3972,3975],{},[165,3973,3974],{},"Bescherming tegen direct aanraken",[165,3976,3977],{},"Afdekkingen, IP-bescherming",[150,3979,3980,3983],{},[165,3981,3982],{},"Documentatie",[165,3984,3985],{},"Éénlijnschema + situatieschema aanwezig?",[50,3987,3988],{},[15,3989,3990,3992,3993,3996,3997,4000],{},[19,3991,3644],{}," Ook onder Part 8 moeten een ",[19,3994,3995],{},"éénlijnschema"," en een ",[19,3998,3999],{},"situatieschema"," aanwezig zijn — ook als deze achteraf moeten worden opgesteld.",[24,4002],{},[27,4004,4006],{"id":4005},"de-besmettingsregel-bij-gedeeltelijke-renovatie","De besmettingsregel bij gedeeltelijke renovatie",[15,4008,4009,4010,4013],{},"Een bijzonder belangrijk aspect bij oudere gebouwen: de zogenaamde ",[19,4011,4012],{},"besmettingsregel"," (contamination rule).",[72,4015,4017],{"id":4016},"hoe-werkt-het","Hoe werkt het?",[15,4019,4020,4021,4024],{},"Wanneer u een deel van uw installatie ",[19,4022,4023],{},"wezenlijk wijzigt"," (bijv. nieuwe kringen toevoegen), geldt:",[616,4026,4027,4034,4040],{},[98,4028,4029,4030,4033],{},"Het ",[19,4031,4032],{},"nieuwe deel"," moet volledig voldoen aan het huidige AREI.",[98,4035,4029,4036,4039],{},[19,4037,4038],{},"bestaande deel"," wordt verder beoordeeld volgens Part 8.",[98,4041,4042,4045],{},[19,4043,4044],{},"MAAR:"," Als het nieuwe deel het bestaande deel \"besmet\" (bijv. nieuwe kabels in dezelfde verdeelkast), kan de controleur beslissen dat de hele verdeelkast aan het huidige AREI moet voldoen.",[72,4047,4049],{"id":4048},"praktische-gevolgen","Praktische gevolgen:",[95,4051,4052,4058,4065],{},[98,4053,4054,4055,3509],{},"Plan renovaties zo dat nieuwe en oude delen ",[19,4056,4057],{},"duidelijk gescheiden",[98,4059,4060,4061,4064],{},"Idealiter een ",[19,4062,4063],{},"aparte onderverdeler"," voor nieuwe kringen.",[98,4066,4067],{},"Documenteer precies wat oud en wat nieuw is.",[24,4069],{},[27,4071,4073],{"id":4072},"aanbeveling-stapsgewijze-modernisering","Aanbeveling: Stapsgewijze modernisering",[15,4075,4076,4077,4080],{},"Hoewel Part 8 afwijkingen tolereert, is een ",[19,4078,4079],{},"stapsgewijze modernisering"," aan te raden:",[72,4082,4084],{"id":4083},"prioriteit-1-veiligheidskritisch","Prioriteit 1 (Veiligheidskritisch)",[95,4086,4087,4090,4093,4096],{},[98,4088,4089],{},"300 mA hoofd-RCD bijplaatsen (indien niet aanwezig)",[98,4091,4092],{},"Beschadigde kabels vervangen",[98,4094,4095],{},"Losse verbindingen herstellen",[98,4097,4098],{},"Aarding controleren en eventueel verbeteren",[72,4100,4102],{"id":4101},"prioriteit-2-aanbevolen","Prioriteit 2 (Aanbevolen)",[95,4104,4105,4108,4111],{},[98,4106,4107],{},"30 mA groeps-RCDs voor badkamer en keuken",[98,4109,4110],{},"Oude smeltzekeringen vervangen door MCBs",[98,4112,4113],{},"SPD Type 2 bijplaatsen",[72,4115,4117],{"id":4116},"prioriteit-3-comfort-toekomstbestendigheid","Prioriteit 3 (Comfort + toekomstbestendigheid)",[95,4119,4120,4123,4126],{},[98,4121,4122],{},"Verdeelkast moderniseren (meer rijen, opschriften)",[98,4124,4125],{},"Stopcontacten met aarding bijplaatsen",[98,4127,4128],{},"Voorbereiding voor laadpaal \u002F zonnepanelen",[72,4130,4132],{"id":4131},"kostenoriëntatie","Kostenoriëntatie",[144,4134,4135,4145],{},[147,4136,4137],{},[150,4138,4139,4142],{},[153,4140,4141],{},"Maatregel",[153,4143,4144],{},"Geschatte kosten",[160,4146,4147,4154,4161,4167,4174,4181],{},[150,4148,4149,4152],{},[165,4150,4151],{},"300 mA hoofd-RCD bijplaatsen",[165,4153,746],{},[150,4155,4156,4159],{},[165,4157,4158],{},"30 mA groeps-RCD (per stuk)",[165,4160,754],{},[150,4162,4163,4165],{},[165,4164,2338],{},[165,4166,762],{},[150,4168,4169,4172],{},[165,4170,4171],{},"MCB-set (10 stuks)",[165,4173,770],{},[150,4175,4176,4179],{},[165,4177,4178],{},"Nieuwe 4-rijige verdeelkast (compleet)",[165,4180,778],{},[150,4182,4183,4186],{},[165,4184,4185],{},"Volledige herbekabeling (EGW)",[165,4187,786],{},[24,4189],{},[27,4191,4193],{"id":4192},"samenvatting","Samenvatting",[144,4195,4196,4206],{},[147,4197,4198],{},[150,4199,4200,4203],{},[153,4201,4202],{},"Vraag",[153,4204,4205],{},"Antwoord",[160,4207,4208,4216,4224,4232,4240],{},[150,4209,4210,4213],{},[165,4211,4212],{},"Moet mijn oud gebouw aan het huidige AREI voldoen?",[165,4214,4215],{},"Niet volledig, Part 8 staat afwijkingen toe",[150,4217,4218,4221],{},[165,4219,4220],{},"Heb ik een 30 mA RCD nodig?",[165,4222,4223],{},"Onder Part 8 niet verplicht, maar sterk aanbevolen",[150,4225,4226,4229],{},[165,4227,4228],{},"Zijn oude stopcontacten zonder aarding toegelaten?",[165,4230,4231],{},"Onder voorwaarden ja (geen badkamer, geen klasse-I-toestellen)",[150,4233,4234,4237],{},[165,4235,4236],{},"Hoe vaak moet er gekeurd worden?",[165,4238,4239],{},"Elke 25 jaar + bij eigendomsoverdracht",[150,4241,4242,4245],{},[165,4243,4244],{},"Wat bij gedeeltelijke renovatie?",[165,4246,4247],{},"Nieuw deel = huidig AREI, oud deel = Part 8 (besmettingsregel in acht nemen)",[24,4249],{},[27,4251,4253],{"id":4252},"gerelateerde-artikelen","Gerelateerde artikelen",[95,4255,4256,4262,4268,4274],{},[98,4257,4258],{},[858,4259,4261],{"href":4260},"\u002Fblog\u002Felektrische-keuring","Elektrische keuring in België: Wat wordt gecontroleerd?",[98,4263,4264],{},[858,4265,4267],{"href":4266},"\u002Fblog\u002Farei-2026-wijzigingen","Wat verandert er met het AREI 2026?",[98,4269,4270],{},[858,4271,4273],{"href":4272},"\u002Fblog\u002Fpreflex-vs-vrije-bedrading","Preflex vs. vrije bedrading",[98,4275,4276],{},[858,4277,4279],{"href":4278},"\u002Fblog\u002Fverdeelkast-plannen-opbouw","Verdeelkast plannen",[24,4281],{},[15,4283,4284],{},[885,4285,4286,4287,4289,4290],{},"Ook voor oudere gebouwen helpt ",[19,4288,890],{}," om éénlijnschema en situatieschema digitaal op te bouwen. De zelfcontrole is indicatief; laat de documenten en toepasselijke afwijkingen professioneel beoordelen. ",[858,4291,4292],{"href":894},"Gratis starten →",{"title":897,"searchDepth":898,"depth":898,"links":4294},[4295,4296,4301,4309,4313,4318,4322,4328,4329],{"id":3451,"depth":898,"text":3452},{"id":3483,"depth":898,"text":3484,"children":4297},[4298,4299,4300],{"id":3494,"depth":904,"text":3495},{"id":3501,"depth":904,"text":3502},{"id":3512,"depth":904,"text":3513},{"id":3552,"depth":898,"text":3553,"children":4302},[4303,4304,4305,4306,4307,4308],{"id":3559,"depth":904,"text":3560},{"id":3600,"depth":904,"text":3601},{"id":3652,"depth":904,"text":3653},{"id":3689,"depth":904,"text":3690},{"id":3699,"depth":904,"text":3700},{"id":3724,"depth":904,"text":3725},{"id":3733,"depth":898,"text":3734,"children":4310},[4311,4312],{"id":3744,"depth":904,"text":3745},{"id":3842,"depth":904,"text":3843},{"id":3877,"depth":898,"text":3878,"children":4314},[4315,4316,4317],{"id":3881,"depth":904,"text":3882},{"id":3892,"depth":904,"text":3893},{"id":3915,"depth":904,"text":3916},{"id":4005,"depth":898,"text":4006,"children":4319},[4320,4321],{"id":4016,"depth":904,"text":4017},{"id":4048,"depth":904,"text":4049},{"id":4072,"depth":898,"text":4073,"children":4323},[4324,4325,4326,4327],{"id":4083,"depth":904,"text":4084},{"id":4101,"depth":904,"text":4102},{"id":4116,"depth":904,"text":4117},{"id":4131,"depth":904,"text":4132},{"id":4192,"depth":898,"text":4193},{"id":4252,"depth":898,"text":4253},"Wat geldt voor oudere elektrische installaties in België. AREI Part 8 uitgelegd: toegelaten afwijkingen, periodieke keuring en tips voor stapsgewijze modernisering.","nl",{},"\u002Fblog\u002Fold-building-arei-part8.nl",{"title":3435,"description":4330},"oud-arei-part-8","blog\u002Fold-building-arei-part8.nl",[4338,952,953,4339,4340,4341,4342],"oudere installatie","bestaande installatie","renovatie","keuring","periodiek","Q2-L9YGyEVSXHJVXrrZFxrVWaA4pAqO0a7-HzjHgkHo",1787555200310]