[{"data":1,"prerenderedAt":4344},["ShallowReactive",2],{"blog-post-en-old-building-arei-part-8":3,"blog-alternates-old-building-arei-part8":955},{"id":4,"title":5,"articleId":6,"body":7,"category":932,"date":933,"description":934,"extension":935,"lastUpdated":936,"locale":937,"meta":938,"navigation":939,"path":940,"publishDate":933,"readTime":941,"refreshInterval":942,"seo":943,"slug":944,"stem":945,"tags":946,"__hash__":954},"blog\u002Fblog\u002Fold-building-arei-part8.en.md","Old Buildings and AREI Part 8: Special Rules for Existing Installations","old-building-arei-part8",{"type":8,"value":9,"toc":892},"minimark",[10,14,23,26,31,38,49,58,60,64,71,76,79,83,90,94,122,130,132,136,139,143,187,191,227,238,242,245,275,279,285,289,310,314,317,319,323,330,334,428,432,435,461,463,467,471,478,482,489,501,505,575,589,591,595,601,605,612,634,638,656,658,662,669,673,687,691,702,706,717,721,783,785,789,843,845,849,876,878],[11,12,5],"h1",{"id":13},"old-buildings-and-arei-part-8-special-rules-for-existing-installations",[15,16,17,18,22],"p",{},"Not every electrical installation in Belgium needs to comply with the latest AREI\u002FRGIE regulations. For older buildings, ",[19,20,21],"strong",{},"Part 8 (Partie 8)"," provides a dedicated set of rules that tolerates certain deviations from the current standard — as long as no immediate danger exists. This article explains when Part 8 applies, what is permitted, and where the limits lie.",[24,25],"hr",{},[27,28,30],"h2",{"id":29},"what-is-part-8","What Is Part 8?",[15,32,33,34,37],{},"Part 8 of the AREI (Algemeen Reglement op de Elektrische Installaties \u002F Règlement Général sur les Installations Électriques) is a ",[19,35,36],{},"special regulation for existing installations"," that were constructed and approved before the current AREI came into force.",[15,39,40,41,44,45,48],{},"The basic principle: as long as an installation functions ",[19,42,43],{},"safely"," and poses ",[19,46,47],{},"no immediate danger",", it does not need to be fully brought up to the latest standards — even if it does not meet all current requirements.",[50,51,52],"blockquote",{},[15,53,54,57],{},[19,55,56],{},"Important:"," Part 8 is not a free pass. It clearly defines which deviations are tolerated and which are not.",[24,59],{},[27,61,63],{"id":62},"when-does-part-8-apply","When Does Part 8 Apply?",[15,65,66,67,70],{},"Part 8 applies to installations that meet ",[19,68,69],{},"one"," of the following conditions:",[72,73,75],"h3",{"id":74},"condition-1-installation-before-01101981","Condition 1: Installation Before 01.10.1981",[15,77,78],{},"Installations constructed before 1 October 1981 (the date the original AREI came into force) fall under Part 8 by default.",[72,80,82],{"id":81},"condition-2-approved-under-the-old-arei","Condition 2: Approved Under the Old AREI",[15,84,85,86,89],{},"Installations that were approved under a previous version of the AREI and have ",[19,87,88],{},"not been substantially modified"," since the last approval.",[72,91,93],{"id":92},"what-counts-as-a-substantial-modification","What Counts as a \"Substantial Modification\"?",[95,96,97,104,110,116],"ul",{},[98,99,100,101],"li",{},"Adding ",[19,102,103],{},"new circuits",[98,105,106,107],{},"Expanding the ",[19,108,109],{},"distribution board",[98,111,112,113],{},"Modifying the ",[19,114,115],{},"metering installation",[98,117,118,119],{},"Extensive ",[19,120,121],{},"rewiring",[50,123,124],{},[15,125,126,129],{},[19,127,128],{},"Note:"," Small changes such as replacing a socket outlet or switch do NOT count as a substantial modification.",[24,131],{},[27,133,135],{"id":134},"what-is-permitted-under-part-8-tolerated-deviations","What Is Permitted Under Part 8? (Tolerated Deviations)",[15,137,138],{},"The following points deviate from the current AREI but are tolerated under Part 8 during inspection:",[72,140,142],{"id":141},"_1-old-cable-types","1. Old Cable Types",[144,145,146,159],"table",{},[147,148,149],"thead",{},[150,151,152,156],"tr",{},[153,154,155],"th",{},"Current AREI",[153,157,158],{},"Part 8 tolerates",[160,161,162,171,179],"tbody",{},[150,163,164,168],{},[165,166,167],"td",{},"XVB \u002F VOBst in Preflex",[165,169,170],{},"VOB cables in old conduits",[150,172,173,176],{},[165,174,175],{},"Cca fire reaction class",[165,177,178],{},"Older cable types without CPR classification",[150,180,181,184],{},[165,182,183],{},"Minimum cross-section 2.5 mm² for sockets",[165,185,186],{},"Minimum 1 mm² with max. 6A fuse or 10A MCB (Art. 8.2.1 Nr. 5)",[72,188,190],{"id":189},"_2-residual-current-devices-rcd","2. Residual Current Devices (RCD)",[144,192,193,201],{},[147,194,195],{},[150,196,197,199],{},[153,198,155],{},[153,200,158],{},[160,202,203,211,219],{},[150,204,205,208],{},[165,206,207],{},"30 mA RCD per socket circuit",[165,209,210],{},"No 30 mA RCD needed (only 300 mA main RCD)",[150,212,213,216],{},[165,214,215],{},"30 mA RCD mandatory for bathroom",[165,217,218],{},"Remains mandatory (not covered by the Part 8 deviation, Art. 4.2.4.3 b No. 3 \u002F Art. 7.1.4.3)",[150,220,221,224],{},[165,222,223],{},"Max. 8 circuits per RCD",[165,225,226],{},"More circuits permitted",[50,228,229],{},[15,230,231,233,234,237],{},[19,232,128],{}," Even under Part 8, a ",[19,235,236],{},"300 mA main RCD"," is recommended and often required by the grid operator when a new meter is installed.",[72,239,241],{"id":240},"_3-socket-outlets-without-earth-contact","3. Socket Outlets Without Earth Contact",[15,243,244],{},"Old socket outlets (type C, without earth pin) are tolerated under Part 8, provided that:",[95,246,247,254,261,272],{},[98,248,249,250,253],{},"The socket is protected by a ",[19,251,252],{},"high or very high sensitivity RCD"," (max. 30 mA) (Art. 8.2.1 No. 6 letter b).",[98,255,256,257,260],{},"No ",[19,258,259],{},"Class I"," appliances (with metal housing) are connected.",[98,262,263,264,267,268,271],{},"The socket is not in the ",[19,265,266],{},"bathroom"," or in a ",[19,269,270],{},"damp location",".",[98,273,274],{},"The circuit is otherwise intact.",[72,276,278],{"id":277},"_4-no-spd-surge-protection","4. No SPD (Surge Protection)",[15,280,281,282,271],{},"The current AREI requires a Type 2 SPD (Surge Protection Device) for new installations. Under Part 8, this is ",[19,283,284],{},"not required",[72,286,288],{"id":287},"_5-old-distribution-technology","5. Old Distribution Technology",[95,290,291,297,303],{},[98,292,293,296],{},[19,294,295],{},"Fuses"," instead of MCBs are permitted.",[98,298,299,302],{},[19,300,301],{},"Screw-type fuses"," (Diazed) are tolerated.",[98,304,305,306,309],{},"Missing ",[19,307,308],{},"labelling"," is noted as a deficiency but does not cause a failure.",[72,311,313],{"id":312},"_6-no-fire-reaction-classification-of-cables","6. No Fire Reaction Classification of Cables",[15,315,316],{},"Cables without CPR classification (installed before 2017) are tolerated, as the CPR regulation only applies from July 2017 for new installations.",[24,318],{},[27,320,322],{"id":321},"what-is-not-permitted-even-under-part-8","What Is NOT Permitted (Even Under Part 8)?",[15,324,325,326,329],{},"Certain conditions are ",[19,327,328],{},"never tolerated",", regardless of the installation's age:",[72,331,333],{"id":332},"absolutely-impermissible","Absolutely Impermissible:",[144,335,336,346],{},[147,337,338],{},[150,339,340,343],{},[153,341,342],{},"Condition",[153,344,345],{},"Why?",[160,347,348,358,368,378,388,398,408,418],{},[150,349,350,355],{},[165,351,352],{},[19,353,354],{},"Bare or damaged cables",[165,356,357],{},"Immediate electrocution risk",[150,359,360,365],{},[165,361,362],{},[19,363,364],{},"Complete absence of earthing",[165,366,367],{},"No protection in case of insulation fault",[150,369,370,375],{},[165,371,372],{},[19,373,374],{},"Water in contact with electrics",[165,376,377],{},"Danger to life",[150,379,380,385],{},[165,381,382],{},[19,383,384],{},"Accessible live parts",[165,386,387],{},"Direct contact risk",[150,389,390,395],{},[165,391,392],{},[19,393,394],{},"Overheated cables or connections",[165,396,397],{},"Fire risk",[150,399,400,405],{},[165,401,402],{},[19,403,404],{},"Loose connections in junction boxes",[165,406,407],{},"Arc\u002Ffire risk",[150,409,410,415],{},[165,411,412],{},[19,413,414],{},"Junction boxes without covers",[165,416,417],{},"Contact protection missing",[150,419,420,425],{},[165,421,422],{},[19,423,424],{},"Bathroom socket in zone 0 or 1",[165,426,427],{},"Danger to life, prohibited even under Part 8",[72,429,431],{"id":430},"safety-related-minimum-requirements","Safety-Related Minimum Requirements:",[15,433,434],{},"Even under Part 8, the following must be ensured:",[95,436,437,443,449,455],{},[98,438,439,442],{},[19,440,441],{},"Adequate cross-section"," for the actual load (no overloaded 0.75 mm² cable).",[98,444,445,448],{},[19,446,447],{},"Functioning fuses"," (no \"bridged\" fuses).",[98,450,451,454],{},[19,452,453],{},"Earthing of the main board"," (connection to earth electrode).",[98,456,457,460],{},[19,458,459],{},"Accessibility"," of the distribution board.",[24,462],{},[27,464,466],{"id":465},"periodic-inspection","Periodic Inspection",[72,468,470],{"id":469},"every-25-years-mandatory","Every 25 Years Mandatory",[15,472,473,474,477],{},"Existing installations under Part 8 must undergo a periodic inspection every ",[19,475,476],{},"25 years"," by an approved control body.",[72,479,481],{"id":480},"on-change-of-ownership","On Change of Ownership",[15,483,484,485,488],{},"When ",[19,486,487],{},"selling a property",", a valid inspection certificate (less than 25 years old) is mandatory. If none exists, an inspection must be carried out before the sale.",[50,490,491],{},[15,492,493,496,497,500],{},[19,494,495],{},"18-month deadline (Art. 8.4.2.2):"," When purchasing a property with a negative inspection report, the buyer has ",[19,498,499],{},"18 months"," from the purchase date to remedy the defects and have a re-inspection carried out.",[72,502,504],{"id":503},"what-is-checked-during-the-periodic-inspection","What Is Checked During the Periodic Inspection?",[144,506,507,517],{},[147,508,509],{},[150,510,511,514],{},[153,512,513],{},"Inspection Point",[153,515,516],{},"Assessment",[160,518,519,527,535,543,551,559,567],{},[150,520,521,524],{},[165,522,523],{},"Visual inspection of cables and connections",[165,525,526],{},"Damage, overheating",[150,528,529,532],{},[165,530,531],{},"Earth resistance measurement",[165,533,534],{},"≤ 30 Ohm (regulatory threshold per Art. 4.2.4.3b; above this, additional protective measures required)",[150,536,537,540],{},[165,538,539],{},"Insulation resistance measurement",[165,541,542],{},"> 0.5 MOhm",[150,544,545,548],{},[165,546,547],{},"RCD test (if present)",[165,549,550],{},"Trip time and current",[150,552,553,556],{},[165,554,555],{},"Short-circuit protection check",[165,557,558],{},"Fuses \u002F MCBs present",[150,560,561,564],{},[165,562,563],{},"Protection against direct contact",[165,565,566],{},"Covers, IP protection",[150,568,569,572],{},[165,570,571],{},"Documentation",[165,573,574],{},"Single-line diagram + situation plan present?",[50,576,577],{},[15,578,579,233,581,584,585,588],{},[19,580,128],{},[19,582,583],{},"single-line diagram"," and a ",[19,586,587],{},"situation plan"," must be available — even if they need to be created retrospectively.",[24,590],{},[27,592,594],{"id":593},"the-contamination-rule-for-partial-renovations","The Contamination Rule for Partial Renovations",[15,596,597,598,271],{},"A particularly important aspect for old buildings: the so-called ",[19,599,600],{},"contamination rule",[72,602,604],{"id":603},"how-does-it-work","How Does It Work?",[15,606,607,608,611],{},"When you ",[19,609,610],{},"substantially modify"," part of your installation (e.g., adding new circuits):",[613,614,615,622,628],"ol",{},[98,616,617,618,621],{},"The ",[19,619,620],{},"new part"," must fully comply with the current AREI.",[98,623,617,624,627],{},[19,625,626],{},"existing part"," continues to be assessed under Part 8.",[98,629,630,633],{},[19,631,632],{},"BUT:"," If the new part \"contaminates\" the existing part (e.g., new cables in the same distribution board), the inspector may decide that the entire board must comply with the current AREI.",[72,635,637],{"id":636},"practical-consequences","Practical Consequences:",[95,639,640,646,653],{},[98,641,642,643,271],{},"Plan renovations so that new and old parts are ",[19,644,645],{},"clearly separated",[98,647,648,649,652],{},"Ideally, use a ",[19,650,651],{},"separate sub-board"," for new circuits.",[98,654,655],{},"Document precisely what is old and what is new.",[24,657],{},[27,659,661],{"id":660},"recommendation-gradual-modernisation","Recommendation: Gradual Modernisation",[15,663,664,665,668],{},"Even though Part 8 tolerates deviations, ",[19,666,667],{},"gradual modernisation"," is recommended:",[72,670,672],{"id":671},"priority-1-safety-critical","Priority 1 (Safety-Critical)",[95,674,675,678,681,684],{},[98,676,677],{},"Retrofit a 300 mA main RCD (if not present)",[98,679,680],{},"Replace damaged cables",[98,682,683],{},"Fix loose connections",[98,685,686],{},"Check and improve earthing if necessary",[72,688,690],{"id":689},"priority-2-recommended","Priority 2 (Recommended)",[95,692,693,696,699],{},[98,694,695],{},"30 mA group RCDs for bathroom and kitchen",[98,697,698],{},"Replace old fuses with MCBs",[98,700,701],{},"Retrofit SPD Type 2",[72,703,705],{"id":704},"priority-3-comfort-future-proofing","Priority 3 (Comfort + Future-Proofing)",[95,707,708,711,714],{},[98,709,710],{},"Modernise the board (more rows, labelling)",[98,712,713],{},"Retrofit socket outlets with earth",[98,715,716],{},"Preparation for EV charger \u002F PV system",[72,718,720],{"id":719},"cost-orientation","Cost Orientation",[144,722,723,733],{},[147,724,725],{},[150,726,727,730],{},[153,728,729],{},"Measure",[153,731,732],{},"Estimated Cost",[160,734,735,743,751,759,767,775],{},[150,736,737,740],{},[165,738,739],{},"Retrofit 300 mA main RCD",[165,741,742],{},"EUR 150–300",[150,744,745,748],{},[165,746,747],{},"30 mA group RCD (each)",[165,749,750],{},"EUR 80–150",[150,752,753,756],{},[165,754,755],{},"SPD Type 2",[165,757,758],{},"EUR 100–250",[150,760,761,764],{},[165,762,763],{},"MCB set (10 pieces)",[165,765,766],{},"EUR 50–100",[150,768,769,772],{},[165,770,771],{},"New 4-row board (complete)",[165,773,774],{},"EUR 500–1,500",[150,776,777,780],{},[165,778,779],{},"Complete rewiring (house)",[165,781,782],{},"EUR 5,000–15,000",[24,784],{},[27,786,788],{"id":787},"summary","Summary",[144,790,791,801],{},[147,792,793],{},[150,794,795,798],{},[153,796,797],{},"Question",[153,799,800],{},"Answer",[160,802,803,811,819,827,835],{},[150,804,805,808],{},[165,806,807],{},"Does my old building need to comply with the current AREI?",[165,809,810],{},"Not fully, Part 8 permits deviations",[150,812,813,816],{},[165,814,815],{},"Do I need a 30 mA RCD?",[165,817,818],{},"Not mandatory under Part 8, but strongly recommended",[150,820,821,824],{},[165,822,823],{},"Are old sockets without earth permitted?",[165,825,826],{},"Under conditions yes (no bathroom, no Class I appliances)",[150,828,829,832],{},[165,830,831],{},"How often must inspections take place?",[165,833,834],{},"Every 25 years + on change of ownership",[150,836,837,840],{},[165,838,839],{},"What about partial renovation?",[165,841,842],{},"New part = current AREI, old part = Part 8 (contamination rule applies)",[24,844],{},[27,846,848],{"id":847},"related-articles","Related Articles",[95,850,851,858,864,870],{},[98,852,853],{},[854,855,857],"a",{"href":856},"\u002Fen\u002Fblog\u002Felectrical-inspection","Electrical Inspection in Belgium: What Is Checked?",[98,859,860],{},[854,861,863],{"href":862},"\u002Fen\u002Fblog\u002Farei-2026-changes","What Changes with the AREI 2026?",[98,865,866],{},[854,867,869],{"href":868},"\u002Fen\u002Fblog\u002Fpreflex-vs-open-wiring","Preflex vs. Open Wiring",[98,871,872],{},[854,873,875],{"href":874},"\u002Fen\u002Fblog\u002Fdistribution-board-planning-guide","Distribution Board Planning",[24,877],{},[15,879,880],{},[881,882,883,884,887,888],"em",{},"For older buildings, ",[19,885,886],{},"PlanElec"," helps build the single-line diagram and situation plan digitally. The self-check is advisory; have the documents and applicable derogations reviewed professionally. ",[854,889,891],{"href":890},"\u002F","Start for free →",{"title":893,"searchDepth":894,"depth":894,"links":895},"",2,[896,897,903,911,915,920,924,930,931],{"id":29,"depth":894,"text":30},{"id":62,"depth":894,"text":63,"children":898},[899,901,902],{"id":74,"depth":900,"text":75},3,{"id":81,"depth":900,"text":82},{"id":92,"depth":900,"text":93},{"id":134,"depth":894,"text":135,"children":904},[905,906,907,908,909,910],{"id":141,"depth":900,"text":142},{"id":189,"depth":900,"text":190},{"id":240,"depth":900,"text":241},{"id":277,"depth":900,"text":278},{"id":287,"depth":900,"text":288},{"id":312,"depth":900,"text":313},{"id":321,"depth":894,"text":322,"children":912},[913,914],{"id":332,"depth":900,"text":333},{"id":430,"depth":900,"text":431},{"id":465,"depth":894,"text":466,"children":916},[917,918,919],{"id":469,"depth":900,"text":470},{"id":480,"depth":900,"text":481},{"id":503,"depth":900,"text":504},{"id":593,"depth":894,"text":594,"children":921},[922,923],{"id":603,"depth":900,"text":604},{"id":636,"depth":900,"text":637},{"id":660,"depth":894,"text":661,"children":925},[926,927,928,929],{"id":671,"depth":900,"text":672},{"id":689,"depth":900,"text":690},{"id":704,"depth":900,"text":705},{"id":719,"depth":900,"text":720},{"id":787,"depth":894,"text":788},{"id":847,"depth":894,"text":848},"guide","2026-04-14","What applies to older electrical installations in Belgium. AREI Part 8 explained: permitted deviations, periodic inspection, and tips for gradual modernisation.","md","2026-06-05","en",{},true,"\u002Fblog\u002Fold-building-arei-part8.en","8 min",12,{"title":5,"description":934},"old-building-arei-part-8","blog\u002Fold-building-arei-part8.en",[947,948,949,950,951,952,953],"old building","AREI","Part 8","existing installation","renovation","inspection","periodic","3mUSkcLD_yqcR9pr9ReIxXoediuq8vIB4IlyOuBNzg4",[956,1875,2522,3433],{"id":957,"title":958,"articleId":6,"body":959,"category":932,"date":933,"description":1861,"extension":935,"lastUpdated":936,"locale":1862,"meta":1863,"navigation":939,"path":1864,"publishDate":933,"readTime":941,"refreshInterval":942,"seo":1865,"slug":1866,"stem":1867,"tags":1868,"__hash__":1874},"blog\u002Fblog\u002Fold-building-arei-part8.de.md","Altbau und AREI Part 8: Sonderregeln für bestehende Installationen",{"type":8,"value":960,"toc":1824},[961,964,970,972,976,983,994,1002,1004,1008,1015,1019,1022,1026,1033,1037,1063,1071,1073,1077,1080,1084,1121,1125,1161,1173,1177,1180,1210,1214,1220,1224,1245,1249,1252,1254,1258,1265,1269,1363,1367,1370,1396,1398,1402,1406,1413,1417,1424,1436,1440,1510,1525,1527,1531,1537,1541,1548,1569,1573,1592,1594,1598,1605,1609,1623,1627,1638,1642,1653,1657,1719,1721,1725,1779,1781,1785,1811,1813],[11,962,958],{"id":963},"altbau-und-arei-part-8-sonderregeln-für-bestehende-installationen",[15,965,966,967,969],{},"Nicht jede Elektroinstallation in Belgien muss den neuesten AREI-Vorschriften entsprechen. Für ältere Gebäude gibt es mit ",[19,968,21],{}," ein eigenes Regelwerk, das bestimmte Abweichungen vom aktuellen Standard toleriert — solange keine unmittelbare Gefahr besteht. Dieser Artikel erklärt, wann Part 8 gilt, was erlaubt ist und wo die Grenzen liegen.",[24,971],{},[27,973,975],{"id":974},"was-ist-part-8","Was ist Part 8?",[15,977,978,979,982],{},"Part 8 des AREI (Allgemeines Reglement über die Elektrischen Installationen \u002F Règlement Général sur les Installations Électriques) ist eine ",[19,980,981],{},"Sonderregelung für bestehende Installationen",", die vor Inkrafttreten des aktuellen AREI errichtet und abgenommen wurden.",[15,984,985,986,989,990,993],{},"Das Grundprinzip: Solange eine Installation ",[19,987,988],{},"sicher"," funktioniert und ",[19,991,992],{},"keine unmittelbare Gefahr"," darstellt, muss sie nicht vollständig auf den neuesten Stand gebracht werden — auch wenn sie nicht allen aktuellen Vorschriften entspricht.",[50,995,996],{},[15,997,998,1001],{},[19,999,1000],{},"Wichtig:"," Part 8 ist kein Freibrief. Es definiert klar, welche Abweichungen toleriert werden und welche nicht.",[24,1003],{},[27,1005,1007],{"id":1006},"wann-gilt-part-8","Wann gilt Part 8?",[15,1009,1010,1011,1014],{},"Part 8 gilt für Installationen, die ",[19,1012,1013],{},"eine"," der folgenden Bedingungen erfüllen:",[72,1016,1018],{"id":1017},"bedingung-1-installation-vor-dem-01101981","Bedingung 1: Installation vor dem 01.10.1981",[15,1020,1021],{},"Installationen, die vor dem 1. Oktober 1981 errichtet wurden (Datum des Inkrafttretens des ursprünglichen AREI), fallen grundsätzlich unter Part 8.",[72,1023,1025],{"id":1024},"bedingung-2-unter-dem-alten-arei-abgenommen","Bedingung 2: Unter dem alten AREI abgenommen",[15,1027,1028,1029,1032],{},"Installationen, die unter einer früheren Version des AREI abgenommen wurden und seit der letzten Abnahme ",[19,1030,1031],{},"nicht wesentlich verändert"," wurden.",[72,1034,1036],{"id":1035},"was-zählt-als-wesentliche-änderung","Was zählt als „wesentliche Änderung\"?",[95,1038,1039,1045,1051,1057],{},[98,1040,1041,1042],{},"Hinzufügen ",[19,1043,1044],{},"neuer Stromkreise",[98,1046,1047,1048],{},"Erweiterung des ",[19,1049,1050],{},"Verteilerkastens",[98,1052,1053,1054],{},"Änderung der ",[19,1055,1056],{},"Zähleranlage",[98,1058,1059,1060],{},"Umfangreiche ",[19,1061,1062],{},"Umverdrahtung",[50,1064,1065],{},[15,1066,1067,1070],{},[19,1068,1069],{},"Achtung:"," Kleine Änderungen wie der Austausch einer Steckdose oder eines Schalters gelten NICHT als wesentliche Änderung.",[24,1072],{},[27,1074,1076],{"id":1075},"was-ist-unter-part-8-erlaubt-tolerierte-abweichungen","Was ist unter Part 8 erlaubt? (Tolerierte Abweichungen)",[15,1078,1079],{},"Die folgenden Punkte weichen vom aktuellen AREI ab, werden aber unter Part 8 bei der Kontrolle toleriert:",[72,1081,1083],{"id":1082},"_1-alte-kabeltypen","1. Alte Kabeltypen",[144,1085,1086,1096],{},[147,1087,1088],{},[150,1089,1090,1093],{},[153,1091,1092],{},"Aktuelles AREI",[153,1094,1095],{},"Part 8 toleriert",[160,1097,1098,1105,1113],{},[150,1099,1100,1102],{},[165,1101,167],{},[165,1103,1104],{},"VOB-Kabel in alten Leerrohren",[150,1106,1107,1110],{},[165,1108,1109],{},"Cca-Brandschutzklasse",[165,1111,1112],{},"Ältere Kabeltypen ohne CPR-Klassifizierung",[150,1114,1115,1118],{},[165,1116,1117],{},"Mindestquerschnitt 2,5 mm² für Steckdosen",[165,1119,1120],{},"Mindestens 1 mm² bei Absicherung mit max. 6 A Sicherung oder 10 A Leitungsschutzschalter",[72,1122,1124],{"id":1123},"_2-fehlerstromschutzschalter-rcd-differenzialschalter","2. Fehlerstromschutzschalter (RCD \u002F Differenzialschalter)",[144,1126,1127,1135],{},[147,1128,1129],{},[150,1130,1131,1133],{},[153,1132,1092],{},[153,1134,1095],{},[160,1136,1137,1145,1153],{},[150,1138,1139,1142],{},[165,1140,1141],{},"30 mA RCD pro Steckdosenkreis",[165,1143,1144],{},"Kein 30 mA RCD nötig (nur 300 mA Haupt-RCD)",[150,1146,1147,1150],{},[165,1148,1149],{},"30 mA RCD für Badezimmer Pflicht",[165,1151,1152],{},"Bleibt Pflicht (nicht von der Part-8-Abweichung erfasst, Art. 4.2.4.3 b Nr. 3 \u002F Art. 7.1.4.3)",[150,1154,1155,1158],{},[165,1156,1157],{},"Max. 8 Kreise pro RCD",[165,1159,1160],{},"Mehr Kreise erlaubt",[50,1162,1163],{},[15,1164,1165,1168,1169,1172],{},[19,1166,1167],{},"Hinweis:"," Auch unter Part 8 wird ein ",[19,1170,1171],{},"300 mA Haupt-RCD"," empfohlen und bei Neuinstallation des Zählers oft vom Netzbetreiber vorausgesetzt.",[72,1174,1176],{"id":1175},"_3-steckdosen-ohne-erdungskontakt","3. Steckdosen ohne Erdungskontakt",[15,1178,1179],{},"Alte Steckdosen ohne Erdungsanschluss (die modernen belgischen Steckdosen sind Typ E mit Erdungsstift) werden unter Part 8 toleriert, sofern:",[95,1181,1182,1189,1196,1207],{},[98,1183,1184,1185,1188],{},"Die Steckdose durch einen ",[19,1186,1187],{},"Fehlerstromschutzschalter mit hoher oder sehr hoher Empfindlichkeit"," (max. 30 mA) geschützt ist (Art. 8.2.1 Nr. 6 Buchstabe b).",[98,1190,1191,1192,1195],{},"Keine Geräte der ",[19,1193,1194],{},"Schutzklasse I"," (mit Metallgehäuse) angeschlossen werden.",[98,1197,1198,1199,1202,1203,1206],{},"Die Steckdose nicht im ",[19,1200,1201],{},"Badezimmer"," oder an ",[19,1204,1205],{},"feuchten Orten"," ist.",[98,1208,1209],{},"Der Stromkreis ansonsten intakt ist.",[72,1211,1213],{"id":1212},"_4-kein-spd-überspannungsschutz","4. Kein SPD (Überspannungsschutz)",[15,1215,1216,1217,271],{},"Das aktuelle AREI schreibt für Neuinstallationen einen SPD (Surge Protection Device) Typ 2 vor. Unter Part 8 ist das ",[19,1218,1219],{},"nicht erforderlich",[72,1221,1223],{"id":1222},"_5-alte-verteilertechnik","5. Alte Verteilertechnik",[95,1225,1226,1232,1238],{},[98,1227,1228,1231],{},[19,1229,1230],{},"Schmelzsicherungen"," statt MCBs sind erlaubt.",[98,1233,1234,1237],{},[19,1235,1236],{},"Drehsicherungen"," (Diazed) werden toleriert.",[98,1239,1240,1241,1244],{},"Fehlende ",[19,1242,1243],{},"Beschriftung"," wird als Mangel vermerkt, führt aber nicht zum Durchfallen.",[72,1246,1248],{"id":1247},"_6-keine-brandschutzklassifizierung-der-kabel","6. Keine Brandschutzklassifizierung der Kabel",[15,1250,1251],{},"Kabel ohne CPR-Klassifizierung (vor 2017 installiert) werden toleriert, da die CPR-Verordnung erst ab Juli 2017 für neue Installationen gilt.",[24,1253],{},[27,1255,1257],{"id":1256},"was-ist-nicht-erlaubt-auch-unter-part-8","Was ist NICHT erlaubt (auch unter Part 8)?",[15,1259,1260,1261,1264],{},"Bestimmte Zustände werden ",[19,1262,1263],{},"niemals toleriert",", unabhängig vom Alter der Installation:",[72,1266,1268],{"id":1267},"absolut-unzulässig","Absolut unzulässig:",[144,1270,1271,1281],{},[147,1272,1273],{},[150,1274,1275,1278],{},[153,1276,1277],{},"Zustand",[153,1279,1280],{},"Warum?",[160,1282,1283,1293,1303,1313,1323,1333,1343,1353],{},[150,1284,1285,1290],{},[165,1286,1287],{},[19,1288,1289],{},"Blanke oder beschädigte Kabel",[165,1291,1292],{},"Unmittelbare Stromschlaggefahr",[150,1294,1295,1300],{},[165,1296,1297],{},[19,1298,1299],{},"Fehlende Erdung komplett",[165,1301,1302],{},"Kein Schutz bei Isolationsfehler",[150,1304,1305,1310],{},[165,1306,1307],{},[19,1308,1309],{},"Wasser in Kontakt mit Elektrik",[165,1311,1312],{},"Lebensgefahr",[150,1314,1315,1320],{},[165,1316,1317],{},[19,1318,1319],{},"Zugängliche spannungsführende Teile",[165,1321,1322],{},"Direktes Berührungsrisiko",[150,1324,1325,1330],{},[165,1326,1327],{},[19,1328,1329],{},"Überhitzte Kabel oder Verbindungen",[165,1331,1332],{},"Brandgefahr",[150,1334,1335,1340],{},[165,1336,1337],{},[19,1338,1339],{},"Lose Verbindungen in Verteilerdosen",[165,1341,1342],{},"Lichtbogen-\u002FBrandgefahr",[150,1344,1345,1350],{},[165,1346,1347],{},[19,1348,1349],{},"Abzweigdosen ohne Deckel",[165,1351,1352],{},"Berührungsschutz fehlt",[150,1354,1355,1360],{},[165,1356,1357],{},[19,1358,1359],{},"Badezimmer-Steckdose in Zone 0 oder 1",[165,1361,1362],{},"Lebensgefahr, auch unter Part 8 verboten",[72,1364,1366],{"id":1365},"sicherheitsrelevante-mindestanforderungen","Sicherheitsrelevante Mindestanforderungen:",[15,1368,1369],{},"Auch unter Part 8 muss gewährleistet sein:",[95,1371,1372,1378,1384,1390],{},[98,1373,1374,1377],{},[19,1375,1376],{},"Ausreichender Querschnitt"," für die tatsächliche Belastung (kein überlastetes 0,75 mm²-Kabel).",[98,1379,1380,1383],{},[19,1381,1382],{},"Funktionierende Sicherungen"," (keine „gebrückten\" Sicherungen).",[98,1385,1386,1389],{},[19,1387,1388],{},"Erdung des Hauptverteilers"," (Verbindung zur Erdungselektrode).",[98,1391,1392,1395],{},[19,1393,1394],{},"Zugänglichkeit"," des Verteilerkastens.",[24,1397],{},[27,1399,1401],{"id":1400},"periodische-kontrolle","Periodische Kontrolle",[72,1403,1405],{"id":1404},"alle-25-jahre-pflicht","Alle 25 Jahre Pflicht",[15,1407,1408,1409,1412],{},"Bestehende Installationen unter Part 8 müssen alle ",[19,1410,1411],{},"25 Jahre"," einer periodischen Kontrolle durch einen zugelassenen Kontrollorganismus unterzogen werden.",[72,1414,1416],{"id":1415},"bei-eigentümerwechsel","Bei Eigentümerwechsel",[15,1418,1419,1420,1423],{},"Bei ",[19,1421,1422],{},"Verkauf einer Immobilie"," ist eine gültige Kontrollbescheinigung (weniger als 25 Jahre alt) Pflicht. Liegt keine vor, muss vor dem Verkauf eine Kontrolle durchgeführt werden.",[50,1425,1426],{},[15,1427,1428,1431,1432,1435],{},[19,1429,1430],{},"18-Monate-Frist (Art. 8.4.2.2):"," Bei Kauf einer Immobilie mit negativem Prüfbericht hat der Käufer ",[19,1433,1434],{},"18 Monate"," ab Kaufdatum, um die Mängel zu beheben und eine Nachkontrolle durchführen zu lassen.",[72,1437,1439],{"id":1438},"was-wird-bei-der-periodischen-kontrolle-geprüft","Was wird bei der periodischen Kontrolle geprüft?",[144,1441,1442,1452],{},[147,1443,1444],{},[150,1445,1446,1449],{},[153,1447,1448],{},"Prüfpunkt",[153,1450,1451],{},"Beurteilung",[160,1453,1454,1462,1470,1478,1486,1494,1502],{},[150,1455,1456,1459],{},[165,1457,1458],{},"Sichtprüfung der Kabel und Verbindungen",[165,1460,1461],{},"Beschädigung, Überhitzung",[150,1463,1464,1467],{},[165,1465,1466],{},"Erdungswiderstand messen",[165,1468,1469],{},"≤ 30 Ω (regulatorische Schwelle gemäß Art. 4.2.4.3b; darüber zusätzliche Schutzmaßnahmen nötig)",[150,1471,1472,1475],{},[165,1473,1474],{},"Isolationswiderstand messen",[165,1476,1477],{},"> 0,5 MΩ",[150,1479,1480,1483],{},[165,1481,1482],{},"RCD-Test (falls vorhanden)",[165,1484,1485],{},"Auslösezeit und -strom",[150,1487,1488,1491],{},[165,1489,1490],{},"Kurzschlussschutz prüfen",[165,1492,1493],{},"Sicherungen \u002F MCBs vorhanden",[150,1495,1496,1499],{},[165,1497,1498],{},"Schutz gegen direktes Berühren",[165,1500,1501],{},"Abdeckungen, IP-Schutz",[150,1503,1504,1507],{},[165,1505,1506],{},"Dokumentation",[165,1508,1509],{},"Eindrahtschema + Situationsplan vorhanden?",[50,1511,1512],{},[15,1513,1514,1516,1517,1520,1521,1524],{},[19,1515,1167],{}," Auch unter Part 8 müssen ein ",[19,1518,1519],{},"Eindrahtschema"," und ein ",[19,1522,1523],{},"Situationsplan"," vorhanden sein — auch wenn diese nachträglich erstellt werden müssen.",[24,1526],{},[27,1528,1530],{"id":1529},"die-kontaminationsregel-bei-teilrenovierung","Die Kontaminationsregel bei Teilrenovierung",[15,1532,1533,1534,271],{},"Ein besonders wichtiger Aspekt bei Altbauten: die sogenannte ",[19,1535,1536],{},"Kontaminationsregel",[72,1538,1540],{"id":1539},"wie-funktioniert-sie","Wie funktioniert sie?",[15,1542,1543,1544,1547],{},"Wenn Sie einen Teil Ihrer Installation ",[19,1545,1546],{},"wesentlich verändern"," (z. B. neue Stromkreise hinzufügen), gilt:",[613,1549,1550,1557,1563],{},[98,1551,1552,1553,1556],{},"Der ",[19,1554,1555],{},"neue Teil"," muss vollständig dem aktuellen AREI entsprechen.",[98,1558,1552,1559,1562],{},[19,1560,1561],{},"bestehende Teil"," wird weiterhin nach Part 8 beurteilt.",[98,1564,1565,1568],{},[19,1566,1567],{},"ABER:"," Wenn der neue Teil den bestehenden Teil „kontaminiert\" (z. B. neue Kabel im selben Verteiler), kann der Kontrolleur entscheiden, dass der gesamte Verteiler dem aktuellen AREI entsprechen muss.",[72,1570,1572],{"id":1571},"praktische-konsequenz","Praktische Konsequenz:",[95,1574,1575,1582,1589],{},[98,1576,1577,1578,1581],{},"Planen Sie Renovierungen so, dass neue und alte Teile ",[19,1579,1580],{},"klar getrennt"," sind.",[98,1583,1584,1585,1588],{},"Idealerweise einen ",[19,1586,1587],{},"separaten Unterverteiler"," für neue Stromkreise.",[98,1590,1591],{},"Dokumentieren Sie genau, was alt und was neu ist.",[24,1593],{},[27,1595,1597],{"id":1596},"empfehlung-schrittweise-modernisierung","Empfehlung: Schrittweise Modernisierung",[15,1599,1600,1601,1604],{},"Auch wenn Part 8 Abweichungen toleriert, empfiehlt sich eine ",[19,1602,1603],{},"schrittweise Modernisierung",":",[72,1606,1608],{"id":1607},"priorität-1-sicherheitskritisch","Priorität 1 (Sicherheitskritisch)",[95,1610,1611,1614,1617,1620],{},[98,1612,1613],{},"300 mA Haupt-RCD nachrüsten (falls nicht vorhanden)",[98,1615,1616],{},"Beschädigte Kabel ersetzen",[98,1618,1619],{},"Lose Verbindungen beheben",[98,1621,1622],{},"Erdung prüfen und ggf. verbessern",[72,1624,1626],{"id":1625},"priorität-2-empfohlen","Priorität 2 (Empfohlen)",[95,1628,1629,1632,1635],{},[98,1630,1631],{},"30 mA Gruppen-RCDs für Badezimmer und Küche",[98,1633,1634],{},"Alte Schmelzsicherungen durch MCBs ersetzen",[98,1636,1637],{},"SPD Typ 2 nachrüsten",[72,1639,1641],{"id":1640},"priorität-3-komfort-zukunftssicherheit","Priorität 3 (Komfort + Zukunftssicherheit)",[95,1643,1644,1647,1650],{},[98,1645,1646],{},"Verteiler modernisieren (mehr Reihen, Beschriftung)",[98,1648,1649],{},"Steckdosen mit Erdung nachrüsten",[98,1651,1652],{},"Vorbereitung für Wallbox \u002F PV-Anlage",[72,1654,1656],{"id":1655},"kostenorientierung","Kostenorientierung",[144,1658,1659,1669],{},[147,1660,1661],{},[150,1662,1663,1666],{},[153,1664,1665],{},"Maßnahme",[153,1667,1668],{},"Geschätzte Kosten",[160,1670,1671,1679,1687,1695,1703,1711],{},[150,1672,1673,1676],{},[165,1674,1675],{},"300 mA Haupt-RCD nachrüsten",[165,1677,1678],{},"150–300 EUR",[150,1680,1681,1684],{},[165,1682,1683],{},"30 mA Gruppen-RCD (pro Stück)",[165,1685,1686],{},"80–150 EUR",[150,1688,1689,1692],{},[165,1690,1691],{},"SPD Typ 2",[165,1693,1694],{},"100–250 EUR",[150,1696,1697,1700],{},[165,1698,1699],{},"MCB-Set (10 Stück)",[165,1701,1702],{},"50–100 EUR",[150,1704,1705,1708],{},[165,1706,1707],{},"Neuer 4-Reihen-Verteiler (komplett)",[165,1709,1710],{},"500–1.500 EUR",[150,1712,1713,1716],{},[165,1714,1715],{},"Vollständige Neuverkabelung (EFH)",[165,1717,1718],{},"5.000–15.000 EUR",[24,1720],{},[27,1722,1724],{"id":1723},"zusammenfassung","Zusammenfassung",[144,1726,1727,1737],{},[147,1728,1729],{},[150,1730,1731,1734],{},[153,1732,1733],{},"Frage",[153,1735,1736],{},"Antwort",[160,1738,1739,1747,1755,1763,1771],{},[150,1740,1741,1744],{},[165,1742,1743],{},"Muss mein Altbau dem aktuellen AREI entsprechen?",[165,1745,1746],{},"Nicht vollständig, Part 8 erlaubt Abweichungen",[150,1748,1749,1752],{},[165,1750,1751],{},"Brauche ich einen 30 mA RCD?",[165,1753,1754],{},"Unter Part 8 nicht Pflicht, aber dringend empfohlen",[150,1756,1757,1760],{},[165,1758,1759],{},"Sind alte Steckdosen ohne Erdung erlaubt?",[165,1761,1762],{},"Unter Bedingungen ja (kein Badezimmer, keine Schutzklasse-I-Geräte)",[150,1764,1765,1768],{},[165,1766,1767],{},"Wie oft muss kontrolliert werden?",[165,1769,1770],{},"Alle 25 Jahre + bei Eigentümerwechsel",[150,1772,1773,1776],{},[165,1774,1775],{},"Was passiert bei Teilrenovierung?",[165,1777,1778],{},"Neuer Teil = aktuelles AREI, alter Teil = Part 8 (Kontaminationsregel beachten)",[24,1780],{},[27,1782,1784],{"id":1783},"verwandte-artikel","Verwandte Artikel",[95,1786,1787,1793,1799,1805],{},[98,1788,1789],{},[854,1790,1792],{"href":1791},"\u002Fde\u002Fblog\u002Felektrische-kontrolle","Elektrische Kontrolle in Belgien: Was wird geprüft?",[98,1794,1795],{},[854,1796,1798],{"href":1797},"\u002Fde\u002Fblog\u002Farei-2026-aenderungen","Was ändert sich mit dem AREI 2026?",[98,1800,1801],{},[854,1802,1804],{"href":1803},"\u002Fde\u002Fblog\u002Fpreflex-vs-freie-verlegung","Preflex vs. freie Verlegung",[98,1806,1807],{},[854,1808,1810],{"href":1809},"\u002Fde\u002Fblog\u002Fschaltschrank-planen-aufbau","Schaltschrank planen",[24,1812],{},[15,1814,1815],{},[881,1816,1817,1818,1820,1821],{},"Auch für Altbauten erstellt ",[19,1819,886],{}," normgerechte Eindrahtschemas und Situationspläne — die Pflichtdokumente für jede Kontrolle. Dokumentieren Sie Ihre Installation jetzt digital. ",[854,1822,1823],{"href":890},"Kostenlos starten →",{"title":893,"searchDepth":894,"depth":894,"links":1825},[1826,1827,1832,1840,1844,1849,1853,1859,1860],{"id":974,"depth":894,"text":975},{"id":1006,"depth":894,"text":1007,"children":1828},[1829,1830,1831],{"id":1017,"depth":900,"text":1018},{"id":1024,"depth":900,"text":1025},{"id":1035,"depth":900,"text":1036},{"id":1075,"depth":894,"text":1076,"children":1833},[1834,1835,1836,1837,1838,1839],{"id":1082,"depth":900,"text":1083},{"id":1123,"depth":900,"text":1124},{"id":1175,"depth":900,"text":1176},{"id":1212,"depth":900,"text":1213},{"id":1222,"depth":900,"text":1223},{"id":1247,"depth":900,"text":1248},{"id":1256,"depth":894,"text":1257,"children":1841},[1842,1843],{"id":1267,"depth":900,"text":1268},{"id":1365,"depth":900,"text":1366},{"id":1400,"depth":894,"text":1401,"children":1845},[1846,1847,1848],{"id":1404,"depth":900,"text":1405},{"id":1415,"depth":900,"text":1416},{"id":1438,"depth":900,"text":1439},{"id":1529,"depth":894,"text":1530,"children":1850},[1851,1852],{"id":1539,"depth":900,"text":1540},{"id":1571,"depth":900,"text":1572},{"id":1596,"depth":894,"text":1597,"children":1854},[1855,1856,1857,1858],{"id":1607,"depth":900,"text":1608},{"id":1625,"depth":900,"text":1626},{"id":1640,"depth":900,"text":1641},{"id":1655,"depth":900,"text":1656},{"id":1723,"depth":894,"text":1724},{"id":1783,"depth":894,"text":1784},"Was bei älteren Elektroinstallationen in Belgien gilt. AREI Part 8 erklärt: erlaubte Abweichungen, periodische Kontrolle und Tipps zur schrittweisen Modernisierung.","de",{},"\u002Fblog\u002Fold-building-arei-part8.de",{"title":958,"description":1861},"altbau-arei-part-8","blog\u002Fold-building-arei-part8.de",[1869,948,949,1870,1871,1872,1873],"altbau","bestandsinstallation","renovierung","kontrolle","periodisch","WDz2A426D1LVad7bgEuHPyefaCr9JZdCzjAxBg5Z9lE",{"id":4,"title":5,"articleId":6,"body":1876,"category":932,"date":933,"description":934,"extension":935,"lastUpdated":936,"locale":937,"meta":2519,"navigation":939,"path":940,"publishDate":933,"readTime":941,"refreshInterval":942,"seo":2520,"slug":944,"stem":945,"tags":2521,"__hash__":954},{"type":8,"value":1877,"toc":2482},[1878,1880,1884,1886,1888,1892,1898,1904,1906,1908,1912,1914,1916,1918,1922,1924,1942,1948,1950,1952,1954,1956,1986,1988,2018,2026,2028,2030,2048,2050,2054,2056,2070,2072,2074,2076,2078,2082,2084,2160,2162,2164,2182,2184,2186,2188,2192,2194,2198,2206,2208,2262,2272,2274,2276,2280,2282,2286,2300,2302,2314,2316,2318,2322,2324,2334,2336,2344,2346,2354,2356,2404,2406,2408,2450,2452,2454,2472,2474],[11,1879,5],{"id":13},[15,1881,17,1882,22],{},[19,1883,21],{},[24,1885],{},[27,1887,30],{"id":29},[15,1889,33,1890,37],{},[19,1891,36],{},[15,1893,40,1894,44,1896,48],{},[19,1895,43],{},[19,1897,47],{},[50,1899,1900],{},[15,1901,1902,57],{},[19,1903,56],{},[24,1905],{},[27,1907,63],{"id":62},[15,1909,66,1910,70],{},[19,1911,69],{},[72,1913,75],{"id":74},[15,1915,78],{},[72,1917,82],{"id":81},[15,1919,85,1920,89],{},[19,1921,88],{},[72,1923,93],{"id":92},[95,1925,1926,1930,1934,1938],{},[98,1927,100,1928],{},[19,1929,103],{},[98,1931,106,1932],{},[19,1933,109],{},[98,1935,112,1936],{},[19,1937,115],{},[98,1939,118,1940],{},[19,1941,121],{},[50,1943,1944],{},[15,1945,1946,129],{},[19,1947,128],{},[24,1949],{},[27,1951,135],{"id":134},[15,1953,138],{},[72,1955,142],{"id":141},[144,1957,1958,1966],{},[147,1959,1960],{},[150,1961,1962,1964],{},[153,1963,155],{},[153,1965,158],{},[160,1967,1968,1974,1980],{},[150,1969,1970,1972],{},[165,1971,167],{},[165,1973,170],{},[150,1975,1976,1978],{},[165,1977,175],{},[165,1979,178],{},[150,1981,1982,1984],{},[165,1983,183],{},[165,1985,186],{},[72,1987,190],{"id":189},[144,1989,1990,1998],{},[147,1991,1992],{},[150,1993,1994,1996],{},[153,1995,155],{},[153,1997,158],{},[160,1999,2000,2006,2012],{},[150,2001,2002,2004],{},[165,2003,207],{},[165,2005,210],{},[150,2007,2008,2010],{},[165,2009,215],{},[165,2011,218],{},[150,2013,2014,2016],{},[165,2015,223],{},[165,2017,226],{},[50,2019,2020],{},[15,2021,2022,233,2024,237],{},[19,2023,128],{},[19,2025,236],{},[72,2027,241],{"id":240},[15,2029,244],{},[95,2031,2032,2036,2040,2046],{},[98,2033,249,2034,253],{},[19,2035,252],{},[98,2037,256,2038,260],{},[19,2039,259],{},[98,2041,263,2042,267,2044,271],{},[19,2043,266],{},[19,2045,270],{},[98,2047,274],{},[72,2049,278],{"id":277},[15,2051,281,2052,271],{},[19,2053,284],{},[72,2055,288],{"id":287},[95,2057,2058,2062,2066],{},[98,2059,2060,296],{},[19,2061,295],{},[98,2063,2064,302],{},[19,2065,301],{},[98,2067,305,2068,309],{},[19,2069,308],{},[72,2071,313],{"id":312},[15,2073,316],{},[24,2075],{},[27,2077,322],{"id":321},[15,2079,325,2080,329],{},[19,2081,328],{},[72,2083,333],{"id":332},[144,2085,2086,2094],{},[147,2087,2088],{},[150,2089,2090,2092],{},[153,2091,342],{},[153,2093,345],{},[160,2095,2096,2104,2112,2120,2128,2136,2144,2152],{},[150,2097,2098,2102],{},[165,2099,2100],{},[19,2101,354],{},[165,2103,357],{},[150,2105,2106,2110],{},[165,2107,2108],{},[19,2109,364],{},[165,2111,367],{},[150,2113,2114,2118],{},[165,2115,2116],{},[19,2117,374],{},[165,2119,377],{},[150,2121,2122,2126],{},[165,2123,2124],{},[19,2125,384],{},[165,2127,387],{},[150,2129,2130,2134],{},[165,2131,2132],{},[19,2133,394],{},[165,2135,397],{},[150,2137,2138,2142],{},[165,2139,2140],{},[19,2141,404],{},[165,2143,407],{},[150,2145,2146,2150],{},[165,2147,2148],{},[19,2149,414],{},[165,2151,417],{},[150,2153,2154,2158],{},[165,2155,2156],{},[19,2157,424],{},[165,2159,427],{},[72,2161,431],{"id":430},[15,2163,434],{},[95,2165,2166,2170,2174,2178],{},[98,2167,2168,442],{},[19,2169,441],{},[98,2171,2172,448],{},[19,2173,447],{},[98,2175,2176,454],{},[19,2177,453],{},[98,2179,2180,460],{},[19,2181,459],{},[24,2183],{},[27,2185,466],{"id":465},[72,2187,470],{"id":469},[15,2189,473,2190,477],{},[19,2191,476],{},[72,2193,481],{"id":480},[15,2195,484,2196,488],{},[19,2197,487],{},[50,2199,2200],{},[15,2201,2202,496,2204,500],{},[19,2203,495],{},[19,2205,499],{},[72,2207,504],{"id":503},[144,2209,2210,2218],{},[147,2211,2212],{},[150,2213,2214,2216],{},[153,2215,513],{},[153,2217,516],{},[160,2219,2220,2226,2232,2238,2244,2250,2256],{},[150,2221,2222,2224],{},[165,2223,523],{},[165,2225,526],{},[150,2227,2228,2230],{},[165,2229,531],{},[165,2231,534],{},[150,2233,2234,2236],{},[165,2235,539],{},[165,2237,542],{},[150,2239,2240,2242],{},[165,2241,547],{},[165,2243,550],{},[150,2245,2246,2248],{},[165,2247,555],{},[165,2249,558],{},[150,2251,2252,2254],{},[165,2253,563],{},[165,2255,566],{},[150,2257,2258,2260],{},[165,2259,571],{},[165,2261,574],{},[50,2263,2264],{},[15,2265,2266,233,2268,584,2270,588],{},[19,2267,128],{},[19,2269,583],{},[19,2271,587],{},[24,2273],{},[27,2275,594],{"id":593},[15,2277,597,2278,271],{},[19,2279,600],{},[72,2281,604],{"id":603},[15,2283,607,2284,611],{},[19,2285,610],{},[613,2287,2288,2292,2296],{},[98,2289,617,2290,621],{},[19,2291,620],{},[98,2293,617,2294,627],{},[19,2295,626],{},[98,2297,2298,633],{},[19,2299,632],{},[72,2301,637],{"id":636},[95,2303,2304,2308,2312],{},[98,2305,642,2306,271],{},[19,2307,645],{},[98,2309,648,2310,652],{},[19,2311,651],{},[98,2313,655],{},[24,2315],{},[27,2317,661],{"id":660},[15,2319,664,2320,668],{},[19,2321,667],{},[72,2323,672],{"id":671},[95,2325,2326,2328,2330,2332],{},[98,2327,677],{},[98,2329,680],{},[98,2331,683],{},[98,2333,686],{},[72,2335,690],{"id":689},[95,2337,2338,2340,2342],{},[98,2339,695],{},[98,2341,698],{},[98,2343,701],{},[72,2345,705],{"id":704},[95,2347,2348,2350,2352],{},[98,2349,710],{},[98,2351,713],{},[98,2353,716],{},[72,2355,720],{"id":719},[144,2357,2358,2366],{},[147,2359,2360],{},[150,2361,2362,2364],{},[153,2363,729],{},[153,2365,732],{},[160,2367,2368,2374,2380,2386,2392,2398],{},[150,2369,2370,2372],{},[165,2371,739],{},[165,2373,742],{},[150,2375,2376,2378],{},[165,2377,747],{},[165,2379,750],{},[150,2381,2382,2384],{},[165,2383,755],{},[165,2385,758],{},[150,2387,2388,2390],{},[165,2389,763],{},[165,2391,766],{},[150,2393,2394,2396],{},[165,2395,771],{},[165,2397,774],{},[150,2399,2400,2402],{},[165,2401,779],{},[165,2403,782],{},[24,2405],{},[27,2407,788],{"id":787},[144,2409,2410,2418],{},[147,2411,2412],{},[150,2413,2414,2416],{},[153,2415,797],{},[153,2417,800],{},[160,2419,2420,2426,2432,2438,2444],{},[150,2421,2422,2424],{},[165,2423,807],{},[165,2425,810],{},[150,2427,2428,2430],{},[165,2429,815],{},[165,2431,818],{},[150,2433,2434,2436],{},[165,2435,823],{},[165,2437,826],{},[150,2439,2440,2442],{},[165,2441,831],{},[165,2443,834],{},[150,2445,2446,2448],{},[165,2447,839],{},[165,2449,842],{},[24,2451],{},[27,2453,848],{"id":847},[95,2455,2456,2460,2464,2468],{},[98,2457,2458],{},[854,2459,857],{"href":856},[98,2461,2462],{},[854,2463,863],{"href":862},[98,2465,2466],{},[854,2467,869],{"href":868},[98,2469,2470],{},[854,2471,875],{"href":874},[24,2473],{},[15,2475,2476],{},[881,2477,883,2478,887,2480],{},[19,2479,886],{},[854,2481,891],{"href":890},{"title":893,"searchDepth":894,"depth":894,"links":2483},[2484,2485,2490,2498,2502,2507,2511,2517,2518],{"id":29,"depth":894,"text":30},{"id":62,"depth":894,"text":63,"children":2486},[2487,2488,2489],{"id":74,"depth":900,"text":75},{"id":81,"depth":900,"text":82},{"id":92,"depth":900,"text":93},{"id":134,"depth":894,"text":135,"children":2491},[2492,2493,2494,2495,2496,2497],{"id":141,"depth":900,"text":142},{"id":189,"depth":900,"text":190},{"id":240,"depth":900,"text":241},{"id":277,"depth":900,"text":278},{"id":287,"depth":900,"text":288},{"id":312,"depth":900,"text":313},{"id":321,"depth":894,"text":322,"children":2499},[2500,2501],{"id":332,"depth":900,"text":333},{"id":430,"depth":900,"text":431},{"id":465,"depth":894,"text":466,"children":2503},[2504,2505,2506],{"id":469,"depth":900,"text":470},{"id":480,"depth":900,"text":481},{"id":503,"depth":900,"text":504},{"id":593,"depth":894,"text":594,"children":2508},[2509,2510],{"id":603,"depth":900,"text":604},{"id":636,"depth":900,"text":637},{"id":660,"depth":894,"text":661,"children":2512},[2513,2514,2515,2516],{"id":671,"depth":900,"text":672},{"id":689,"depth":900,"text":690},{"id":704,"depth":900,"text":705},{"id":719,"depth":900,"text":720},{"id":787,"depth":894,"text":788},{"id":847,"depth":894,"text":848},{},{"title":5,"description":934},[947,948,949,950,951,952,953],{"id":2523,"title":2524,"articleId":6,"body":2525,"category":932,"date":933,"description":3418,"extension":935,"lastUpdated":936,"locale":3419,"meta":3420,"navigation":939,"path":3421,"publishDate":933,"readTime":941,"refreshInterval":942,"seo":3422,"slug":3423,"stem":3424,"tags":3425,"__hash__":3432},"blog\u002Fblog\u002Fold-building-arei-part8.fr.md","Ancien bâtiment et RGIE Partie 8 : Règles spéciales pour les installations existantes",{"type":8,"value":2526,"toc":3381},[2527,2530,2537,2539,2543,2550,2561,2569,2571,2575,2582,2586,2589,2593,2600,2604,2630,2638,2640,2644,2647,2651,2689,2693,2729,2741,2745,2748,2777,2781,2787,2791,2813,2817,2820,2822,2826,2833,2837,2931,2935,2938,2964,2966,2970,2974,2981,2985,2992,3004,3008,3076,3090,3092,3096,3102,3106,3113,3134,3138,3156,3158,3162,3169,3173,3187,3191,3202,3206,3217,3221,3277,3279,3283,3336,3338,3342,3368,3370],[11,2528,2524],{"id":2529},"ancien-bâtiment-et-rgie-partie-8-règles-spéciales-pour-les-installations-existantes",[15,2531,2532,2533,2536],{},"Toute installation électrique en Belgique ne doit pas forcément répondre aux dernières prescriptions du RGIE. Pour les bâtiments plus anciens, la ",[19,2534,2535],{},"Partie 8"," constitue un ensemble de règles spécifiques qui tolère certaines dérogations par rapport au standard actuel — tant qu'il n'existe pas de danger immédiat. Cet article explique quand la Partie 8 s'applique, ce qui est autorisé et où se trouvent les limites.",[24,2538],{},[27,2540,2542],{"id":2541},"quest-ce-que-la-partie-8","Qu'est-ce que la Partie 8 ?",[15,2544,2545,2546,2549],{},"La Partie 8 du RGIE (Règlement Général sur les Installations Électriques) est une ",[19,2547,2548],{},"réglementation spéciale pour les installations existantes"," qui ont été réalisées et réceptionnées avant l'entrée en vigueur du RGIE actuel.",[15,2551,2552,2553,2556,2557,2560],{},"Le principe de base : tant qu'une installation fonctionne de manière ",[19,2554,2555],{},"sûre"," et ne représente ",[19,2558,2559],{},"aucun danger immédiat",", elle n'a pas à être entièrement mise aux normes actuelles — même si elle ne répond pas à toutes les prescriptions en vigueur.",[50,2562,2563],{},[15,2564,2565,2568],{},[19,2566,2567],{},"Important :"," La Partie 8 n'est pas un blanc-seing. Elle définit clairement quelles dérogations sont tolérées et lesquelles ne le sont pas.",[24,2570],{},[27,2572,2574],{"id":2573},"quand-la-partie-8-sapplique-t-elle","Quand la Partie 8 s'applique-t-elle ?",[15,2576,2577,2578,2581],{},"La Partie 8 s'applique aux installations qui remplissent ",[19,2579,2580],{},"l'une"," des conditions suivantes :",[72,2583,2585],{"id":2584},"condition-1-installation-avant-le-01101981","Condition 1 : Installation avant le 01.10.1981",[15,2587,2588],{},"Les installations réalisées avant le 1er octobre 1981 (date d'entrée en vigueur du RGIE original) tombent en principe sous la Partie 8.",[72,2590,2592],{"id":2591},"condition-2-réceptionnée-sous-lancien-rgie","Condition 2 : Réceptionnée sous l'ancien RGIE",[15,2594,2595,2596,2599],{},"Les installations qui ont été réceptionnées sous une version antérieure du RGIE et qui n'ont ",[19,2597,2598],{},"pas été substantiellement modifiées"," depuis la dernière réception.",[72,2601,2603],{"id":2602},"quest-ce-quune-modification-substantielle","Qu'est-ce qu'une « modification substantielle » ?",[95,2605,2606,2612,2618,2624],{},[98,2607,2608,2609],{},"Ajout de ",[19,2610,2611],{},"nouveaux circuits",[98,2613,2614,2615],{},"Extension du ",[19,2616,2617],{},"tableau de distribution",[98,2619,2620,2621],{},"Modification de l'",[19,2622,2623],{},"installation de comptage",[98,2625,2626,2629],{},[19,2627,2628],{},"Recâblage"," important",[50,2631,2632],{},[15,2633,2634,2637],{},[19,2635,2636],{},"Attention :"," Les petites modifications comme le remplacement d'une prise ou d'un interrupteur ne comptent PAS comme modification substantielle.",[24,2639],{},[27,2641,2643],{"id":2642},"ce-qui-est-autorisé-sous-la-partie-8-dérogations-tolérées","Ce qui est autorisé sous la Partie 8 (Dérogations tolérées)",[15,2645,2646],{},"Les points suivants s'écartent du RGIE actuel, mais sont tolérés sous la Partie 8 lors du contrôle :",[72,2648,2650],{"id":2649},"_1-anciens-types-de-câbles","1. Anciens types de câbles",[144,2652,2653,2663],{},[147,2654,2655],{},[150,2656,2657,2660],{},[153,2658,2659],{},"RGIE actuel",[153,2661,2662],{},"Partie 8 tolère",[160,2664,2665,2673,2681],{},[150,2666,2667,2670],{},[165,2668,2669],{},"XVB \u002F VOBst en Preflex",[165,2671,2672],{},"Câbles VOB dans d'anciennes gaines",[150,2674,2675,2678],{},[165,2676,2677],{},"Classe de réaction au feu Cca",[165,2679,2680],{},"Types de câbles plus anciens sans classification CPR",[150,2682,2683,2686],{},[165,2684,2685],{},"Section minimale 2,5 mm² pour les prises",[165,2687,2688],{},"Minimum 1 mm² avec fusible max. 6 A ou disjoncteur max. 10 A (Art. 8.2.1 Nr. 5)",[72,2690,2692],{"id":2691},"_2-différentiels-rcd","2. Différentiels (RCD)",[144,2694,2695,2703],{},[147,2696,2697],{},[150,2698,2699,2701],{},[153,2700,2659],{},[153,2702,2662],{},[160,2704,2705,2713,2721],{},[150,2706,2707,2710],{},[165,2708,2709],{},"Différentiel 30 mA par circuit prises",[165,2711,2712],{},"Pas de 30 mA nécessaire (seulement 300 mA principal)",[150,2714,2715,2718],{},[165,2716,2717],{},"Différentiel 30 mA obligatoire pour salle de bain",[165,2719,2720],{},"Reste obligatoire (non couvert par la dérogation Partie 8, Art. 4.2.4.3 b N° 3 \u002F Art. 7.1.4.3)",[150,2722,2723,2726],{},[165,2724,2725],{},"Max. 8 circuits par RCD",[165,2727,2728],{},"Plus de circuits autorisés",[50,2730,2731],{},[15,2732,2733,2736,2737,2740],{},[19,2734,2735],{},"Note :"," Même sous la Partie 8, un ",[19,2738,2739],{},"différentiel principal 300 mA"," est recommandé et souvent exigé par le gestionnaire de réseau lors d'une nouvelle installation de compteur.",[72,2742,2744],{"id":2743},"_3-prises-sans-contact-de-terre","3. Prises sans contact de terre",[15,2746,2747],{},"Les anciennes prises (type C, sans broche de terre) sont tolérées sous la Partie 8, à condition que :",[95,2749,2750,2757,2764,2774],{},[98,2751,2752,2753,2756],{},"La prise soit protégée par un ",[19,2754,2755],{},"différentiel à haute ou très haute sensibilité"," (max. 30 mA) (Art. 8.2.1 N° 6 lettre b).",[98,2758,2759,2760,2763],{},"Aucun appareil de ",[19,2761,2762],{},"classe de protection I"," (avec boîtier métallique) ne soit branché.",[98,2765,2766,2767,2770,2771,271],{},"La prise ne soit pas dans la ",[19,2768,2769],{},"salle de bain"," ou dans un ",[19,2772,2773],{},"lieu humide",[98,2775,2776],{},"Le circuit soit par ailleurs intact.",[72,2778,2780],{"id":2779},"_4-pas-de-parafoudre-spd","4. Pas de parafoudre (SPD)",[15,2782,2783,2784,271],{},"Le RGIE actuel prescrit un parafoudre (SPD) Type 2 pour les nouvelles installations. Sous la Partie 8, ce n'est ",[19,2785,2786],{},"pas requis",[72,2788,2790],{"id":2789},"_5-ancienne-technique-de-distribution","5. Ancienne technique de distribution",[95,2792,2793,2800,2806],{},[98,2794,2795,2796,2799],{},"Les ",[19,2797,2798],{},"fusibles"," au lieu de disjoncteurs sont autorisés.",[98,2801,2795,2802,2805],{},[19,2803,2804],{},"fusibles à vis"," (Diazed) sont tolérés.",[98,2807,2808,2809,2812],{},"L'absence d'",[19,2810,2811],{},"étiquetage"," est mentionnée comme défaut, mais n'entraîne pas un échec.",[72,2814,2816],{"id":2815},"_6-pas-de-classification-de-réaction-au-feu-des-câbles","6. Pas de classification de réaction au feu des câbles",[15,2818,2819],{},"Les câbles sans classification CPR (installés avant 2017) sont tolérés, car le règlement CPR ne s'applique qu'à partir de juillet 2017 pour les nouvelles installations.",[24,2821],{},[27,2823,2825],{"id":2824},"ce-qui-nest-pas-autorisé-même-sous-la-partie-8","Ce qui n'est PAS autorisé (même sous la Partie 8)",[15,2827,2828,2829,2832],{},"Certaines situations ne sont ",[19,2830,2831],{},"jamais tolérées",", quel que soit l'âge de l'installation :",[72,2834,2836],{"id":2835},"absolument-inadmissible","Absolument inadmissible :",[144,2838,2839,2849],{},[147,2840,2841],{},[150,2842,2843,2846],{},[153,2844,2845],{},"Situation",[153,2847,2848],{},"Pourquoi ?",[160,2850,2851,2861,2871,2881,2891,2901,2911,2921],{},[150,2852,2853,2858],{},[165,2854,2855],{},[19,2856,2857],{},"Câbles dénudés ou endommagés",[165,2859,2860],{},"Danger immédiat d'électrocution",[150,2862,2863,2868],{},[165,2864,2865],{},[19,2866,2867],{},"Absence totale de mise à la terre",[165,2869,2870],{},"Pas de protection en cas de défaut d'isolement",[150,2872,2873,2878],{},[165,2874,2875],{},[19,2876,2877],{},"Eau en contact avec l'électricité",[165,2879,2880],{},"Danger de mort",[150,2882,2883,2888],{},[165,2884,2885],{},[19,2886,2887],{},"Parties sous tension accessibles",[165,2889,2890],{},"Risque de contact direct",[150,2892,2893,2898],{},[165,2894,2895],{},[19,2896,2897],{},"Câbles ou connexions en surchauffe",[165,2899,2900],{},"Risque d'incendie",[150,2902,2903,2908],{},[165,2904,2905],{},[19,2906,2907],{},"Connexions desserrées dans les boîtes de dérivation",[165,2909,2910],{},"Risque d'arc\u002Fincendie",[150,2912,2913,2918],{},[165,2914,2915],{},[19,2916,2917],{},"Boîtes de dérivation sans couvercle",[165,2919,2920],{},"Protection contre les contacts manquante",[150,2922,2923,2928],{},[165,2924,2925],{},[19,2926,2927],{},"Prise de salle de bain en zone 0 ou 1",[165,2929,2930],{},"Danger de mort, interdit même sous Partie 8",[72,2932,2934],{"id":2933},"exigences-minimales-de-sécurité","Exigences minimales de sécurité :",[15,2936,2937],{},"Même sous la Partie 8, il faut garantir :",[95,2939,2940,2946,2952,2958],{},[98,2941,2942,2945],{},[19,2943,2944],{},"Section suffisante"," pour la charge réelle (pas de câble 0,75 mm² surchargé).",[98,2947,2948,2951],{},[19,2949,2950],{},"Fusibles fonctionnels"," (pas de fusibles « pontés »).",[98,2953,2954,2957],{},[19,2955,2956],{},"Mise à la terre du tableau principal"," (connexion à l'électrode de terre).",[98,2959,2960,2963],{},[19,2961,2962],{},"Accessibilité"," du tableau de distribution.",[24,2965],{},[27,2967,2969],{"id":2968},"contrôle-périodique","Contrôle périodique",[72,2971,2973],{"id":2972},"tous-les-25-ans-obligatoire","Tous les 25 ans obligatoire",[15,2975,2976,2977,2980],{},"Les installations existantes sous la Partie 8 doivent subir un contrôle périodique tous les ",[19,2978,2979],{},"25 ans"," par un organisme de contrôle agréé.",[72,2982,2984],{"id":2983},"lors-dun-changement-de-propriétaire","Lors d'un changement de propriétaire",[15,2986,2987,2988,2991],{},"Lors de la ",[19,2989,2990],{},"vente d'un bien immobilier",", une attestation de contrôle valide (de moins de 25 ans) est obligatoire. Si elle n'existe pas, un contrôle doit être effectué avant la vente.",[50,2993,2994],{},[15,2995,2996,2999,3000,3003],{},[19,2997,2998],{},"Délai de 18 mois (Art. 8.4.2.2) :"," Lors de l'achat d'un bien immobilier avec un rapport de contrôle négatif, l'acheteur dispose de ",[19,3001,3002],{},"18 mois"," à compter de la date d'achat pour remédier aux défauts et faire effectuer un recontrôle.",[72,3005,3007],{"id":3006},"que-vérifie-t-on-lors-du-contrôle-périodique","Que vérifie-t-on lors du contrôle périodique ?",[144,3009,3010,3020],{},[147,3011,3012],{},[150,3013,3014,3017],{},[153,3015,3016],{},"Point de contrôle",[153,3018,3019],{},"Évaluation",[160,3021,3022,3030,3038,3045,3053,3061,3069],{},[150,3023,3024,3027],{},[165,3025,3026],{},"Inspection visuelle des câbles et connexions",[165,3028,3029],{},"Dommages, surchauffe",[150,3031,3032,3035],{},[165,3033,3034],{},"Mesure de la résistance de terre",[165,3036,3037],{},"≤ 30 Ω (seuil réglementaire selon Art. 4.2.4.3b ; au-delà, des mesures de protection supplémentaires sont nécessaires)",[150,3039,3040,3043],{},[165,3041,3042],{},"Mesure de la résistance d'isolement",[165,3044,1477],{},[150,3046,3047,3050],{},[165,3048,3049],{},"Test RCD (si présent)",[165,3051,3052],{},"Temps et courant de déclenchement",[150,3054,3055,3058],{},[165,3056,3057],{},"Vérification de la protection contre les courts-circuits",[165,3059,3060],{},"Fusibles \u002F disjoncteurs présents",[150,3062,3063,3066],{},[165,3064,3065],{},"Protection contre les contacts directs",[165,3067,3068],{},"Couvercles, protection IP",[150,3070,3071,3073],{},[165,3072,571],{},[165,3074,3075],{},"Schéma unifilaire + plan de situation présents ?",[50,3077,3078],{},[15,3079,3080,2736,3082,3085,3086,3089],{},[19,3081,2735],{},[19,3083,3084],{},"schéma unifilaire"," et un ",[19,3087,3088],{},"plan de situation"," doivent être disponibles — même s'ils doivent être établis rétroactivement.",[24,3091],{},[27,3093,3095],{"id":3094},"la-règle-de-contamination-lors-dune-rénovation-partielle","La règle de contamination lors d'une rénovation partielle",[15,3097,3098,3099,271],{},"Un aspect particulièrement important pour les anciens bâtiments : la ",[19,3100,3101],{},"règle de contamination",[72,3103,3105],{"id":3104},"comment-fonctionne-t-elle","Comment fonctionne-t-elle ?",[15,3107,3108,3109,3112],{},"Lorsque vous modifiez ",[19,3110,3111],{},"substantiellement"," une partie de votre installation (par ex. ajout de nouveaux circuits) :",[613,3114,3115,3122,3128],{},[98,3116,3117,3118,3121],{},"La ",[19,3119,3120],{},"nouvelle partie"," doit entièrement répondre au RGIE actuel.",[98,3123,3117,3124,3127],{},[19,3125,3126],{},"partie existante"," continue d'être évaluée selon la Partie 8.",[98,3129,3130,3133],{},[19,3131,3132],{},"MAIS :"," Si la nouvelle partie « contamine » la partie existante (par ex. nouveaux câbles dans le même tableau), le contrôleur peut décider que l'ensemble du tableau doit répondre au RGIE actuel.",[72,3135,3137],{"id":3136},"conséquences-pratiques","Conséquences pratiques :",[95,3139,3140,3146,3153],{},[98,3141,3142,3143,271],{},"Planifiez les rénovations de manière à ce que les parties nouvelles et anciennes soient ",[19,3144,3145],{},"clairement séparées",[98,3147,3148,3149,3152],{},"Idéalement, un ",[19,3150,3151],{},"sous-tableau séparé"," pour les nouveaux circuits.",[98,3154,3155],{},"Documentez précisément ce qui est ancien et ce qui est nouveau.",[24,3157],{},[27,3159,3161],{"id":3160},"recommandation-modernisation-progressive","Recommandation : Modernisation progressive",[15,3163,3164,3165,3168],{},"Même si la Partie 8 tolère des dérogations, une ",[19,3166,3167],{},"modernisation progressive"," est recommandée :",[72,3170,3172],{"id":3171},"priorité-1-critique-pour-la-sécurité","Priorité 1 (Critique pour la sécurité)",[95,3174,3175,3178,3181,3184],{},[98,3176,3177],{},"Installer un différentiel principal 300 mA (s'il est absent)",[98,3179,3180],{},"Remplacer les câbles endommagés",[98,3182,3183],{},"Réparer les connexions desserrées",[98,3185,3186],{},"Vérifier et améliorer la mise à la terre si nécessaire",[72,3188,3190],{"id":3189},"priorité-2-recommandé","Priorité 2 (Recommandé)",[95,3192,3193,3196,3199],{},[98,3194,3195],{},"Différentiels de groupe 30 mA pour salle de bain et cuisine",[98,3197,3198],{},"Remplacer les anciens fusibles par des disjoncteurs",[98,3200,3201],{},"Installer un parafoudre Type 2",[72,3203,3205],{"id":3204},"priorité-3-confort-pérennité","Priorité 3 (Confort + pérennité)",[95,3207,3208,3211,3214],{},[98,3209,3210],{},"Moderniser le tableau (plus de rangées, étiquetage)",[98,3212,3213],{},"Installer des prises avec terre",[98,3215,3216],{},"Préparation pour borne de recharge \u002F installation PV",[72,3218,3220],{"id":3219},"orientation-des-coûts","Orientation des coûts",[144,3222,3223,3233],{},[147,3224,3225],{},[150,3226,3227,3230],{},[153,3228,3229],{},"Mesure",[153,3231,3232],{},"Coût estimé",[160,3234,3235,3242,3249,3256,3263,3270],{},[150,3236,3237,3240],{},[165,3238,3239],{},"Installer différentiel principal 300 mA",[165,3241,1678],{},[150,3243,3244,3247],{},[165,3245,3246],{},"Différentiel de groupe 30 mA (par pièce)",[165,3248,1686],{},[150,3250,3251,3254],{},[165,3252,3253],{},"Parafoudre Type 2",[165,3255,1694],{},[150,3257,3258,3261],{},[165,3259,3260],{},"Set de disjoncteurs (10 pièces)",[165,3262,1702],{},[150,3264,3265,3268],{},[165,3266,3267],{},"Nouveau tableau 4 rangées (complet)",[165,3269,1710],{},[150,3271,3272,3275],{},[165,3273,3274],{},"Recâblage complet (maison)",[165,3276,1718],{},[24,3278],{},[27,3280,3282],{"id":3281},"résumé","Résumé",[144,3284,3285,3294],{},[147,3286,3287],{},[150,3288,3289,3291],{},[153,3290,797],{},[153,3292,3293],{},"Réponse",[160,3295,3296,3304,3312,3320,3328],{},[150,3297,3298,3301],{},[165,3299,3300],{},"Mon ancien bâtiment doit-il répondre au RGIE actuel ?",[165,3302,3303],{},"Pas entièrement, la Partie 8 autorise des dérogations",[150,3305,3306,3309],{},[165,3307,3308],{},"Ai-je besoin d'un différentiel 30 mA ?",[165,3310,3311],{},"Pas obligatoire sous Partie 8, mais fortement recommandé",[150,3313,3314,3317],{},[165,3315,3316],{},"Les anciennes prises sans terre sont-elles autorisées ?",[165,3318,3319],{},"Sous conditions oui (pas de salle de bain, pas d'appareils classe I)",[150,3321,3322,3325],{},[165,3323,3324],{},"À quelle fréquence faut-il contrôler ?",[165,3326,3327],{},"Tous les 25 ans + lors d'un changement de propriétaire",[150,3329,3330,3333],{},[165,3331,3332],{},"Que se passe-t-il en cas de rénovation partielle ?",[165,3334,3335],{},"Nouvelle partie = RGIE actuel, ancienne = Partie 8 (règle de contamination)",[24,3337],{},[27,3339,3341],{"id":3340},"articles-connexes","Articles connexes",[95,3343,3344,3350,3356,3362],{},[98,3345,3346],{},[854,3347,3349],{"href":3348},"\u002Ffr\u002Fblog\u002Fcontrole-electrique","Contrôle électrique en Belgique : Que vérifie-t-on ?",[98,3351,3352],{},[854,3353,3355],{"href":3354},"\u002Ffr\u002Fblog\u002Frgie-2026-changements","Que change le RGIE 2026 ?",[98,3357,3358],{},[854,3359,3361],{"href":3360},"\u002Ffr\u002Fblog\u002Fpreflex-vs-pose-libre","Preflex vs. pose libre",[98,3363,3364],{},[854,3365,3367],{"href":3366},"\u002Ffr\u002Fblog\u002Fplanifier-tableau-electrique","Planifier un tableau électrique",[24,3369],{},[15,3371,3372],{},[881,3373,3374,3375,3377,3378],{},"Même pour les anciens bâtiments, ",[19,3376,886],{}," aide à construire numériquement le schéma unifilaire et le plan de situation. L'auto-contrôle est indicatif ; faites vérifier les documents et les dérogations applicables par un professionnel. ",[854,3379,3380],{"href":890},"Commencer gratuitement →",{"title":893,"searchDepth":894,"depth":894,"links":3382},[3383,3384,3389,3397,3401,3406,3410,3416,3417],{"id":2541,"depth":894,"text":2542},{"id":2573,"depth":894,"text":2574,"children":3385},[3386,3387,3388],{"id":2584,"depth":900,"text":2585},{"id":2591,"depth":900,"text":2592},{"id":2602,"depth":900,"text":2603},{"id":2642,"depth":894,"text":2643,"children":3390},[3391,3392,3393,3394,3395,3396],{"id":2649,"depth":900,"text":2650},{"id":2691,"depth":900,"text":2692},{"id":2743,"depth":900,"text":2744},{"id":2779,"depth":900,"text":2780},{"id":2789,"depth":900,"text":2790},{"id":2815,"depth":900,"text":2816},{"id":2824,"depth":894,"text":2825,"children":3398},[3399,3400],{"id":2835,"depth":900,"text":2836},{"id":2933,"depth":900,"text":2934},{"id":2968,"depth":894,"text":2969,"children":3402},[3403,3404,3405],{"id":2972,"depth":900,"text":2973},{"id":2983,"depth":900,"text":2984},{"id":3006,"depth":900,"text":3007},{"id":3094,"depth":894,"text":3095,"children":3407},[3408,3409],{"id":3104,"depth":900,"text":3105},{"id":3136,"depth":900,"text":3137},{"id":3160,"depth":894,"text":3161,"children":3411},[3412,3413,3414,3415],{"id":3171,"depth":900,"text":3172},{"id":3189,"depth":900,"text":3190},{"id":3204,"depth":900,"text":3205},{"id":3219,"depth":900,"text":3220},{"id":3281,"depth":894,"text":3282},{"id":3340,"depth":894,"text":3341},"Ce qui s'applique aux anciennes installations électriques en Belgique. RGIE Partie 8 expliqué : dérogations autorisées, contrôle périodique et conseils pour une modernisation progressive.","fr",{},"\u002Fblog\u002Fold-building-arei-part8.fr",{"title":2524,"description":3418},"ancien-rgie-part-8","blog\u002Fold-building-arei-part8.fr",[3426,3427,2535,3428,3429,3430,3431],"ancien bâtiment","RGIE","installation existante","rénovation","contrôle","périodique","omOCczz1zDQZeVaE62RW1l8-T0oTm2JMKjCL3B7oMdM",{"id":3434,"title":3435,"articleId":6,"body":3436,"category":932,"date":933,"description":4330,"extension":935,"lastUpdated":936,"locale":4331,"meta":4332,"navigation":939,"path":4333,"publishDate":933,"readTime":941,"refreshInterval":942,"seo":4334,"slug":4335,"stem":4336,"tags":4337,"__hash__":4343},"blog\u002Fblog\u002Fold-building-arei-part8.nl.md","Oudere installaties en AREI Part 8: Bijzondere regels voor bestaande installaties",{"type":8,"value":3437,"toc":4293},[3438,3441,3447,3449,3453,3460,3471,3479,3481,3485,3492,3496,3499,3503,3510,3514,3540,3548,3550,3554,3557,3561,3598,3602,3638,3650,3654,3657,3687,3691,3697,3701,3722,3726,3729,3731,3735,3742,3746,3840,3844,3847,3873,3875,3879,3883,3890,3894,3901,3913,3917,3986,4001,4003,4007,4014,4018,4025,4046,4050,4068,4070,4074,4081,4085,4099,4103,4114,4118,4129,4133,4188,4190,4194,4248,4250,4254,4280,4282],[11,3439,3435],{"id":3440},"oudere-installaties-en-arei-part-8-bijzondere-regels-voor-bestaande-installaties",[15,3442,3443,3444,3446],{},"Niet elke elektrische installatie in België moet aan de nieuwste AREI-voorschriften voldoen. Voor oudere gebouwen bestaat er met ",[19,3445,21],{}," een apart regelwerk dat bepaalde afwijkingen van de huidige standaard tolereert — zolang er geen onmiddellijk gevaar bestaat. Dit artikel legt uit wanneer Part 8 geldt, wat toegelaten is en waar de grenzen liggen.",[24,3448],{},[27,3450,3452],{"id":3451},"wat-is-part-8","Wat is Part 8?",[15,3454,3455,3456,3459],{},"Part 8 van het AREI (Algemeen Reglement op de Elektrische Installaties) is een ",[19,3457,3458],{},"bijzondere regeling voor bestaande installaties"," die vóór de inwerkingtreding van het huidige AREI werden aangelegd en gekeurd.",[15,3461,3462,3463,3466,3467,3470],{},"Het basisprincipe: zolang een installatie ",[19,3464,3465],{},"veilig"," functioneert en ",[19,3468,3469],{},"geen onmiddellijk gevaar"," vormt, hoeft ze niet volledig op de nieuwste stand gebracht te worden — ook al voldoet ze niet aan alle huidige voorschriften.",[50,3472,3473],{},[15,3474,3475,3478],{},[19,3476,3477],{},"Belangrijk:"," Part 8 is geen vrijbrief. Het definieert duidelijk welke afwijkingen getolereerd worden en welke niet.",[24,3480],{},[27,3482,3484],{"id":3483},"wanneer-geldt-part-8","Wanneer geldt Part 8?",[15,3486,3487,3488,3491],{},"Part 8 geldt voor installaties die aan ",[19,3489,3490],{},"één"," van de volgende voorwaarden voldoen:",[72,3493,3495],{"id":3494},"voorwaarde-1-installatie-vóór-01101981","Voorwaarde 1: Installatie vóór 01.10.1981",[15,3497,3498],{},"Installaties die vóór 1 oktober 1981 werden aangelegd (datum van inwerkingtreding van het oorspronkelijke AREI) vallen in principe onder Part 8.",[72,3500,3502],{"id":3501},"voorwaarde-2-onder-het-oude-arei-gekeurd","Voorwaarde 2: Onder het oude AREI gekeurd",[15,3504,3505,3506,3509],{},"Installaties die onder een eerdere versie van het AREI werden gekeurd en sindsdien ",[19,3507,3508],{},"niet wezenlijk gewijzigd"," zijn.",[72,3511,3513],{"id":3512},"wat-telt-als-wezenlijke-wijziging","Wat telt als \"wezenlijke wijziging\"?",[95,3515,3516,3522,3528,3534],{},[98,3517,3518,3519],{},"Toevoegen van ",[19,3520,3521],{},"nieuwe kringen",[98,3523,3524,3525],{},"Uitbreiding van de ",[19,3526,3527],{},"verdeelkast",[98,3529,3530,3531],{},"Wijziging van de ",[19,3532,3533],{},"meterinstallatie",[98,3535,3536,3537],{},"Omvangrijke ",[19,3538,3539],{},"herbekabeling",[50,3541,3542],{},[15,3543,3544,3547],{},[19,3545,3546],{},"Let op:"," Kleine wijzigingen zoals het vervangen van een stopcontact of schakelaar gelden NIET als wezenlijke wijziging.",[24,3549],{},[27,3551,3553],{"id":3552},"wat-is-onder-part-8-toegelaten-getolereerde-afwijkingen","Wat is onder Part 8 toegelaten? (Getolereerde afwijkingen)",[15,3555,3556],{},"De volgende punten wijken af van het huidige AREI, maar worden onder Part 8 bij de keuring getolereerd:",[72,3558,3560],{"id":3559},"_1-oude-kabeltypes","1. Oude kabeltypes",[144,3562,3563,3573],{},[147,3564,3565],{},[150,3566,3567,3570],{},[153,3568,3569],{},"Huidig AREI",[153,3571,3572],{},"Part 8 tolereert",[160,3574,3575,3582,3590],{},[150,3576,3577,3579],{},[165,3578,167],{},[165,3580,3581],{},"VOB-kabels in oude leidingen",[150,3583,3584,3587],{},[165,3585,3586],{},"Cca-brandveiligheidsklasse",[165,3588,3589],{},"Oudere kabeltypes zonder CPR-classificatie",[150,3591,3592,3595],{},[165,3593,3594],{},"Minimale doorsnede 2,5 mm² voor stopcontacten",[165,3596,3597],{},"Minimaal 1 mm² bij max. 6 A zekering of 10 A automaat (Art. 8.2.1 Nr. 5)",[72,3599,3601],{"id":3600},"_2-aardlekschakelaars-rcd-differentieelschakelaar","2. Aardlekschakelaars (RCD \u002F Differentieelschakelaar)",[144,3603,3604,3612],{},[147,3605,3606],{},[150,3607,3608,3610],{},[153,3609,3569],{},[153,3611,3572],{},[160,3613,3614,3622,3630],{},[150,3615,3616,3619],{},[165,3617,3618],{},"30 mA RCD per stopcontactkring",[165,3620,3621],{},"Geen 30 mA RCD nodig (alleen 300 mA hoofd-RCD)",[150,3623,3624,3627],{},[165,3625,3626],{},"30 mA RCD voor badkamer verplicht",[165,3628,3629],{},"Blijft verplicht (niet gedekt door de Part 8-afwijking, Art. 4.2.4.3 b nr. 3 \u002F Art. 7.1.4.3)",[150,3631,3632,3635],{},[165,3633,3634],{},"Max. 8 kringen per RCD",[165,3636,3637],{},"Meer kringen toegelaten",[50,3639,3640],{},[15,3641,3642,3645,3646,3649],{},[19,3643,3644],{},"Opmerking:"," Ook onder Part 8 wordt een ",[19,3647,3648],{},"300 mA hoofd-RCD"," aanbevolen en bij nieuwe meterinstallatie vaak door de netbeheerder vereist.",[72,3651,3653],{"id":3652},"_3-stopcontacten-zonder-aardingcontact","3. Stopcontacten zonder aardingcontact",[15,3655,3656],{},"Oude stopcontacten (type C, zonder aardpen) worden onder Part 8 getolereerd, op voorwaarde dat:",[95,3658,3659,3666,3673,3684],{},[98,3660,3661,3662,3665],{},"Het stopcontact beschermd wordt door een ",[19,3663,3664],{},"differentieelschakelaar met hoge of zeer hoge gevoeligheid"," (max. 30 mA) (Art. 8.2.1 nr. 6 letter b).",[98,3667,3668,3669,3672],{},"Geen toestellen van ",[19,3670,3671],{},"beschermingsklasse I"," (met metalen behuizing) worden aangesloten.",[98,3674,3675,3676,3679,3680,3683],{},"Het stopcontact niet in de ",[19,3677,3678],{},"badkamer"," of op ",[19,3681,3682],{},"vochtige plaatsen"," zit.",[98,3685,3686],{},"De kring verder intact is.",[72,3688,3690],{"id":3689},"_4-geen-spd-overspanningsbeveiliging","4. Geen SPD (overspanningsbeveiliging)",[15,3692,3693,3694,271],{},"Het huidige AREI schrijft voor nieuwe installaties een SPD (Surge Protection Device) Type 2 voor. Onder Part 8 is dit ",[19,3695,3696],{},"niet vereist",[72,3698,3700],{"id":3699},"_5-oude-verdeeltechniek","5. Oude verdeeltechniek",[95,3702,3703,3709,3715],{},[98,3704,3705,3708],{},[19,3706,3707],{},"Smeltzekeringen"," in plaats van MCBs zijn toegelaten.",[98,3710,3711,3714],{},[19,3712,3713],{},"Schroefzekeringen"," (Diazed) worden getolereerd.",[98,3716,3717,3718,3721],{},"Ontbrekende ",[19,3719,3720],{},"opschriften"," worden als gebrek vermeld, maar leiden niet tot afkeuring.",[72,3723,3725],{"id":3724},"_6-geen-brandveiligheidsclassificatie-van-kabels","6. Geen brandveiligheidsclassificatie van kabels",[15,3727,3728],{},"Kabels zonder CPR-classificatie (vóór 2017 geïnstalleerd) worden getolereerd, aangezien de CPR-verordening pas vanaf juli 2017 voor nieuwe installaties geldt.",[24,3730],{},[27,3732,3734],{"id":3733},"wat-is-niet-toegelaten-ook-onder-part-8","Wat is NIET toegelaten (ook onder Part 8)?",[15,3736,3737,3738,3741],{},"Bepaalde toestanden worden ",[19,3739,3740],{},"nooit getolereerd",", ongeacht de ouderdom van de installatie:",[72,3743,3745],{"id":3744},"absoluut-ongeoorloofd","Absoluut ongeoorloofd:",[144,3747,3748,3758],{},[147,3749,3750],{},[150,3751,3752,3755],{},[153,3753,3754],{},"Toestand",[153,3756,3757],{},"Waarom?",[160,3759,3760,3770,3780,3790,3800,3810,3820,3830],{},[150,3761,3762,3767],{},[165,3763,3764],{},[19,3765,3766],{},"Blote of beschadigde kabels",[165,3768,3769],{},"Onmiddellijk elektrocutiegevaar",[150,3771,3772,3777],{},[165,3773,3774],{},[19,3775,3776],{},"Volledig ontbrekende aarding",[165,3778,3779],{},"Geen bescherming bij isolatiefout",[150,3781,3782,3787],{},[165,3783,3784],{},[19,3785,3786],{},"Water in contact met elektriciteit",[165,3788,3789],{},"Levensgevaar",[150,3791,3792,3797],{},[165,3793,3794],{},[19,3795,3796],{},"Toegankelijke spanningvoerende delen",[165,3798,3799],{},"Direct aanrakingsrisico",[150,3801,3802,3807],{},[165,3803,3804],{},[19,3805,3806],{},"Oververhitte kabels of verbindingen",[165,3808,3809],{},"Brandgevaar",[150,3811,3812,3817],{},[165,3813,3814],{},[19,3815,3816],{},"Losse verbindingen in aftakdozen",[165,3818,3819],{},"Vlamboog-\u002Fbrandgevaar",[150,3821,3822,3827],{},[165,3823,3824],{},[19,3825,3826],{},"Aftakdozen zonder deksel",[165,3828,3829],{},"Aanrakingsbescherming ontbreekt",[150,3831,3832,3837],{},[165,3833,3834],{},[19,3835,3836],{},"Badkamer-stopcontact in zone 0 of 1",[165,3838,3839],{},"Levensgevaar, ook onder Part 8 verboden",[72,3841,3843],{"id":3842},"veiligheidsgerelateerde-minimumvereisten","Veiligheidsgerelateerde minimumvereisten:",[15,3845,3846],{},"Ook onder Part 8 moet gewaarborgd zijn:",[95,3848,3849,3855,3861,3867],{},[98,3850,3851,3854],{},[19,3852,3853],{},"Voldoende doorsnede"," voor de werkelijke belasting (geen overbelast 0,75 mm²-kabel).",[98,3856,3857,3860],{},[19,3858,3859],{},"Werkende zekeringen"," (geen \"overbrugde\" zekeringen).",[98,3862,3863,3866],{},[19,3864,3865],{},"Aarding van de hoofdverdeler"," (verbinding met aardingselektrode).",[98,3868,3869,3872],{},[19,3870,3871],{},"Toegankelijkheid"," van de verdeelkast.",[24,3874],{},[27,3876,3878],{"id":3877},"periodieke-keuring","Periodieke keuring",[72,3880,3882],{"id":3881},"elke-25-jaar-verplicht","Elke 25 jaar verplicht",[15,3884,3885,3886,3889],{},"Bestaande installaties onder Part 8 moeten elke ",[19,3887,3888],{},"25 jaar"," een periodieke keuring ondergaan door een erkend controleorganisme.",[72,3891,3893],{"id":3892},"bij-eigendomsoverdracht","Bij eigendomsoverdracht",[15,3895,3896,3897,3900],{},"Bij ",[19,3898,3899],{},"verkoop van een woning"," is een geldig keuringsattest (minder dan 25 jaar oud) verplicht. Ontbreekt dit, dan moet vóór de verkoop een keuring plaatsvinden.",[50,3902,3903],{},[15,3904,3905,3908,3909,3912],{},[19,3906,3907],{},"18-maandentermijn (Art. 8.4.2.2):"," Bij aankoop van een woning met een negatief keuringsverslag heeft de koper ",[19,3910,3911],{},"18 maanden"," vanaf de aankoopdatum om de gebreken te verhelpen en een herkeuring te laten uitvoeren.",[72,3914,3916],{"id":3915},"wat-wordt-bij-de-periodieke-keuring-gecontroleerd","Wat wordt bij de periodieke keuring gecontroleerd?",[144,3918,3919,3929],{},[147,3920,3921],{},[150,3922,3923,3926],{},[153,3924,3925],{},"Controlepunt",[153,3927,3928],{},"Beoordeling",[160,3930,3931,3939,3947,3954,3962,3970,3978],{},[150,3932,3933,3936],{},[165,3934,3935],{},"Visuele inspectie kabels en verbindingen",[165,3937,3938],{},"Beschadiging, oververhitting",[150,3940,3941,3944],{},[165,3942,3943],{},"Aardingsweerstand meten",[165,3945,3946],{},"≤ 30 Ω (reglementaire drempel conform Art. 4.2.4.3b; daarboven bijkomende beschermingsmaatregelen nodig)",[150,3948,3949,3952],{},[165,3950,3951],{},"Isolatieweerstand meten",[165,3953,1477],{},[150,3955,3956,3959],{},[165,3957,3958],{},"RCD-test (indien aanwezig)",[165,3960,3961],{},"Uitschakeltijd en -stroom",[150,3963,3964,3967],{},[165,3965,3966],{},"Kortsluitbeveiliging controleren",[165,3968,3969],{},"Zekeringen \u002F MCBs aanwezig",[150,3971,3972,3975],{},[165,3973,3974],{},"Bescherming tegen direct aanraken",[165,3976,3977],{},"Afdekkingen, IP-bescherming",[150,3979,3980,3983],{},[165,3981,3982],{},"Documentatie",[165,3984,3985],{},"Éénlijnschema + situatieschema aanwezig?",[50,3987,3988],{},[15,3989,3990,3992,3993,3996,3997,4000],{},[19,3991,3644],{}," Ook onder Part 8 moeten een ",[19,3994,3995],{},"éénlijnschema"," en een ",[19,3998,3999],{},"situatieschema"," aanwezig zijn — ook als deze achteraf moeten worden opgesteld.",[24,4002],{},[27,4004,4006],{"id":4005},"de-besmettingsregel-bij-gedeeltelijke-renovatie","De besmettingsregel bij gedeeltelijke renovatie",[15,4008,4009,4010,4013],{},"Een bijzonder belangrijk aspect bij oudere gebouwen: de zogenaamde ",[19,4011,4012],{},"besmettingsregel"," (contamination rule).",[72,4015,4017],{"id":4016},"hoe-werkt-het","Hoe werkt het?",[15,4019,4020,4021,4024],{},"Wanneer u een deel van uw installatie ",[19,4022,4023],{},"wezenlijk wijzigt"," (bijv. nieuwe kringen toevoegen), geldt:",[613,4026,4027,4034,4040],{},[98,4028,4029,4030,4033],{},"Het ",[19,4031,4032],{},"nieuwe deel"," moet volledig voldoen aan het huidige AREI.",[98,4035,4029,4036,4039],{},[19,4037,4038],{},"bestaande deel"," wordt verder beoordeeld volgens Part 8.",[98,4041,4042,4045],{},[19,4043,4044],{},"MAAR:"," Als het nieuwe deel het bestaande deel \"besmet\" (bijv. nieuwe kabels in dezelfde verdeelkast), kan de controleur beslissen dat de hele verdeelkast aan het huidige AREI moet voldoen.",[72,4047,4049],{"id":4048},"praktische-gevolgen","Praktische gevolgen:",[95,4051,4052,4058,4065],{},[98,4053,4054,4055,3509],{},"Plan renovaties zo dat nieuwe en oude delen ",[19,4056,4057],{},"duidelijk gescheiden",[98,4059,4060,4061,4064],{},"Idealiter een ",[19,4062,4063],{},"aparte onderverdeler"," voor nieuwe kringen.",[98,4066,4067],{},"Documenteer precies wat oud en wat nieuw is.",[24,4069],{},[27,4071,4073],{"id":4072},"aanbeveling-stapsgewijze-modernisering","Aanbeveling: Stapsgewijze modernisering",[15,4075,4076,4077,4080],{},"Hoewel Part 8 afwijkingen tolereert, is een ",[19,4078,4079],{},"stapsgewijze modernisering"," aan te raden:",[72,4082,4084],{"id":4083},"prioriteit-1-veiligheidskritisch","Prioriteit 1 (Veiligheidskritisch)",[95,4086,4087,4090,4093,4096],{},[98,4088,4089],{},"300 mA hoofd-RCD bijplaatsen (indien niet aanwezig)",[98,4091,4092],{},"Beschadigde kabels vervangen",[98,4094,4095],{},"Losse verbindingen herstellen",[98,4097,4098],{},"Aarding controleren en eventueel verbeteren",[72,4100,4102],{"id":4101},"prioriteit-2-aanbevolen","Prioriteit 2 (Aanbevolen)",[95,4104,4105,4108,4111],{},[98,4106,4107],{},"30 mA groeps-RCDs voor badkamer en keuken",[98,4109,4110],{},"Oude smeltzekeringen vervangen door MCBs",[98,4112,4113],{},"SPD Type 2 bijplaatsen",[72,4115,4117],{"id":4116},"prioriteit-3-comfort-toekomstbestendigheid","Prioriteit 3 (Comfort + toekomstbestendigheid)",[95,4119,4120,4123,4126],{},[98,4121,4122],{},"Verdeelkast moderniseren (meer rijen, opschriften)",[98,4124,4125],{},"Stopcontacten met aarding bijplaatsen",[98,4127,4128],{},"Voorbereiding voor laadpaal \u002F zonnepanelen",[72,4130,4132],{"id":4131},"kostenoriëntatie","Kostenoriëntatie",[144,4134,4135,4145],{},[147,4136,4137],{},[150,4138,4139,4142],{},[153,4140,4141],{},"Maatregel",[153,4143,4144],{},"Geschatte kosten",[160,4146,4147,4154,4161,4167,4174,4181],{},[150,4148,4149,4152],{},[165,4150,4151],{},"300 mA hoofd-RCD bijplaatsen",[165,4153,1678],{},[150,4155,4156,4159],{},[165,4157,4158],{},"30 mA groeps-RCD (per stuk)",[165,4160,1686],{},[150,4162,4163,4165],{},[165,4164,755],{},[165,4166,1694],{},[150,4168,4169,4172],{},[165,4170,4171],{},"MCB-set (10 stuks)",[165,4173,1702],{},[150,4175,4176,4179],{},[165,4177,4178],{},"Nieuwe 4-rijige verdeelkast (compleet)",[165,4180,1710],{},[150,4182,4183,4186],{},[165,4184,4185],{},"Volledige herbekabeling (EGW)",[165,4187,1718],{},[24,4189],{},[27,4191,4193],{"id":4192},"samenvatting","Samenvatting",[144,4195,4196,4206],{},[147,4197,4198],{},[150,4199,4200,4203],{},[153,4201,4202],{},"Vraag",[153,4204,4205],{},"Antwoord",[160,4207,4208,4216,4224,4232,4240],{},[150,4209,4210,4213],{},[165,4211,4212],{},"Moet mijn oud gebouw aan het huidige AREI voldoen?",[165,4214,4215],{},"Niet volledig, Part 8 staat afwijkingen toe",[150,4217,4218,4221],{},[165,4219,4220],{},"Heb ik een 30 mA RCD nodig?",[165,4222,4223],{},"Onder Part 8 niet verplicht, maar sterk aanbevolen",[150,4225,4226,4229],{},[165,4227,4228],{},"Zijn oude stopcontacten zonder aarding toegelaten?",[165,4230,4231],{},"Onder voorwaarden ja (geen badkamer, geen klasse-I-toestellen)",[150,4233,4234,4237],{},[165,4235,4236],{},"Hoe vaak moet er gekeurd worden?",[165,4238,4239],{},"Elke 25 jaar + bij eigendomsoverdracht",[150,4241,4242,4245],{},[165,4243,4244],{},"Wat bij gedeeltelijke renovatie?",[165,4246,4247],{},"Nieuw deel = huidig AREI, oud deel = Part 8 (besmettingsregel in acht nemen)",[24,4249],{},[27,4251,4253],{"id":4252},"gerelateerde-artikelen","Gerelateerde artikelen",[95,4255,4256,4262,4268,4274],{},[98,4257,4258],{},[854,4259,4261],{"href":4260},"\u002Fblog\u002Felektrische-keuring","Elektrische keuring in België: Wat wordt gecontroleerd?",[98,4263,4264],{},[854,4265,4267],{"href":4266},"\u002Fblog\u002Farei-2026-wijzigingen","Wat verandert er met het AREI 2026?",[98,4269,4270],{},[854,4271,4273],{"href":4272},"\u002Fblog\u002Fpreflex-vs-vrije-bedrading","Preflex vs. vrije bedrading",[98,4275,4276],{},[854,4277,4279],{"href":4278},"\u002Fblog\u002Fverdeelkast-plannen-opbouw","Verdeelkast plannen",[24,4281],{},[15,4283,4284],{},[881,4285,4286,4287,4289,4290],{},"Ook voor oudere gebouwen helpt ",[19,4288,886],{}," om éénlijnschema en situatieschema digitaal op te bouwen. De zelfcontrole is indicatief; laat de documenten en toepasselijke afwijkingen professioneel beoordelen. ",[854,4291,4292],{"href":890},"Gratis starten →",{"title":893,"searchDepth":894,"depth":894,"links":4294},[4295,4296,4301,4309,4313,4318,4322,4328,4329],{"id":3451,"depth":894,"text":3452},{"id":3483,"depth":894,"text":3484,"children":4297},[4298,4299,4300],{"id":3494,"depth":900,"text":3495},{"id":3501,"depth":900,"text":3502},{"id":3512,"depth":900,"text":3513},{"id":3552,"depth":894,"text":3553,"children":4302},[4303,4304,4305,4306,4307,4308],{"id":3559,"depth":900,"text":3560},{"id":3600,"depth":900,"text":3601},{"id":3652,"depth":900,"text":3653},{"id":3689,"depth":900,"text":3690},{"id":3699,"depth":900,"text":3700},{"id":3724,"depth":900,"text":3725},{"id":3733,"depth":894,"text":3734,"children":4310},[4311,4312],{"id":3744,"depth":900,"text":3745},{"id":3842,"depth":900,"text":3843},{"id":3877,"depth":894,"text":3878,"children":4314},[4315,4316,4317],{"id":3881,"depth":900,"text":3882},{"id":3892,"depth":900,"text":3893},{"id":3915,"depth":900,"text":3916},{"id":4005,"depth":894,"text":4006,"children":4319},[4320,4321],{"id":4016,"depth":900,"text":4017},{"id":4048,"depth":900,"text":4049},{"id":4072,"depth":894,"text":4073,"children":4323},[4324,4325,4326,4327],{"id":4083,"depth":900,"text":4084},{"id":4101,"depth":900,"text":4102},{"id":4116,"depth":900,"text":4117},{"id":4131,"depth":900,"text":4132},{"id":4192,"depth":894,"text":4193},{"id":4252,"depth":894,"text":4253},"Wat geldt voor oudere elektrische installaties in België. AREI Part 8 uitgelegd: toegelaten afwijkingen, periodieke keuring en tips voor stapsgewijze modernisering.","nl",{},"\u002Fblog\u002Fold-building-arei-part8.nl",{"title":3435,"description":4330},"oud-arei-part-8","blog\u002Fold-building-arei-part8.nl",[4338,948,949,4339,4340,4341,4342],"oudere installatie","bestaande installatie","renovatie","keuring","periodiek","Q2-L9YGyEVSXHJVXrrZFxrVWaA4pAqO0a7-HzjHgkHo",1787555263177]