[{"data":1,"prerenderedAt":5672},["ShallowReactive",2],{"help-guide-en-what-the-self-check-verifies":3,"help-alternates-self-check-coverage":821,"help-related-en":3730},{"id":4,"title":5,"body":6,"category":798,"description":799,"extension":800,"guideId":801,"locale":802,"meta":803,"navigation":804,"order":805,"path":806,"publishedAt":807,"readTime":808,"seo":809,"slug":810,"stem":811,"tags":812,"updatedAt":819,"__hash__":820},"help\u002Fhelp\u002Fself-check-coverage.en.md","What does PlanElec's AREI self-check verify?",{"type":7,"value":8,"toc":780},"minimark",[9,13,16,24,30,35,50,53,58,277,281,335,339,407,411,452,456,523,527,555,559,600,604,707,711,714,720,726,732,738,742,745,770,774,777],[10,11,12],"p",{},"PlanElec contains two things that are easily confused.",[10,14,15],{},"AREI\u002FRGIE references are linked publicly only after the documented source and subject-matter approvals. Practice rules and plausibility checks make no claim to quote the regulations.",[10,17,18,19,23],{},"The ",[20,21,22],"strong",{},"automatic self-check"," covers only part of it. This page states exactly which part. We list the rules that are checked and, just as plainly, the areas where the application makes no statement — because an incomplete check presenting itself as complete is more dangerous than no check at all.",[25,26,27],"blockquote",{},[10,28,29],{},"The self-check is preparation. Only an accredited inspection body issues the official assessment.",[31,32,34],"h2",{"id":33},"what-is-checked-automatically","What is checked automatically",[10,36,37,38,41,42,45,46,49],{},"The application currently holds ",[20,39,40],{},"38 checks",". Of these, ",[20,43,44],{},"25"," point to a specific AREI article; the remaining ",[20,47,48],{},"13"," are practice rules or plausibility checks, marked as such, carrying no regulatory obligation.",[10,51,52],{},"A check only produces a result once the required project data has been entered. Where data is missing, the report marks the check as incomplete — never as passed.",[54,55,57],"h3",{"id":56},"protection","Protection",[59,60,61,80],"table",{},[62,63,64],"thead",{},[65,66,67,71,74,77],"tr",{},[68,69,70],"th",{},"Check",[68,72,73],{},"What is verified",[68,75,76],{},"Basis",[68,78,79],{},"Severity",[81,82,83,98,111,124,137,150,162,176,189,202,214,226,239,251,264],"tbody",{},[65,84,85,89,92,95],{},[86,87,88],"td",{},"Main RCD",[86,90,91],{},"A residual current device of at most 300 mA must be present at the head of the installation.",[86,93,94],{},"AREI 4.2.4.3",[86,96,97],{},"Error",[65,99,100,103,106,109],{},[86,101,102],{},"Max. circuits per high-sensitivity RCD",[86,104,105],{},"At most 8 final circuits per high-sensitivity residual current device (≤ 30 mA).",[86,107,108],{},"AREI 4.2.4.3.b",[86,110,97],{},[65,112,113,116,119,122],{},[86,114,115],{},"Shutter actuator ratings",[86,117,118],{},"DIN-rail shutter actuators require an upstream MCB or RCBO; protective-device and motor loads stay within the catalogued input and channel ratings.",[86,120,121],{},"Practice rule",[86,123,97],{},[65,125,126,129,132,135],{},[86,127,128],{},"Charging-point protection (EV charging)",[86,130,131],{},"A charging point requires its own circuit, a dedicated residual current device and at least IP44 outdoors.",[86,133,134],{},"AREI 7.22.4",[86,136,97],{},[65,138,139,142,145,147],{},[86,140,141],{},"RCD selectivity (practice recommendation)",[86,143,144],{},"Practice recommendation: grade sensitivity and time between upstream and downstream RCDs (IEC 60364-5-53).",[86,146,121],{},[86,148,149],{},"Warning",[65,151,152,155,158,160],{},[86,153,154],{},"30 mA RCD for socket circuits",[86,156,157],{},"All socket circuits must be protected by a 30 mA residual current device.",[86,159,108],{},[86,161,97],{},[65,163,164,167,170,173],{},[86,165,166],{},"Surge protection (SPD)",[86,168,169],{},"The presence of a surge protective device (SPD) is assessed; the AREI imposes no general obligation.",[86,171,172],{},"AREI 4.5.1",[86,174,175],{},"Information",[65,177,178,181,184,187],{},[86,179,180],{},"Main switch min. 40 A",[86,182,183],{},"A main switch must be present and rated at least 40 A in domestic installations.",[86,185,186],{},"AREI 5.3.5.1.b",[86,188,97],{},[65,190,191,194,197,200],{},[86,192,193],{},"Main RCD min. 40 A",[86,195,196],{},"The residual current device at the supply point must be rated at least 40 A.",[86,198,199],{},"AREI 5.3.5.3.a",[86,201,97],{},[65,203,204,207,210,212],{},[86,205,206],{},"Distribution-board layout",[86,208,209],{},"Board: occupancy within the module count, one residual current device per row and roughly 20 % spare capacity.",[86,211,121],{},[86,213,149],{},[65,215,216,219,222,224],{},[86,217,218],{},"Embedded wall heating: 100 mA RCD",[86,220,221],{},"Heating elements embedded in walls above 25 V AC require a separate 100 mA residual current device.",[86,223,108],{},[86,225,97],{},[65,227,228,231,234,237],{},[86,229,230],{},"Pole configuration in residential installations",[86,232,233],{},"Single-pole breakers are not permitted in Belgian dwellings with a star configuration; use 1P+N.",[86,235,236],{},"AREI 4.4.4.2",[86,238,149],{},[65,240,241,244,247,249],{},[86,242,243],{},"Trip characteristic versus load type",[86,245,246],{},"Practice recommendation: the breaker curve B, C or D must match the load type.",[86,248,121],{},[86,250,149],{},[65,252,253,256,259,262],{},[86,254,255],{},"Feeder back-up protection between distribution boards",[86,257,258],{},"A feeder to a sub-board requires its own protective device in the supplying board and a consistent link.",[86,260,261],{},"AREI 4.4.1.4",[86,263,97],{},[65,265,266,269,272,275],{},[86,267,268],{},"Breaking capacity versus prospective short-circuit current",[86,270,271],{},"The breaking capacity of each breaker must withstand the prospective short-circuit current; checked only when the value is recorded.",[86,273,274],{},"AREI 5.3.5.5",[86,276,97],{},[54,278,280],{"id":279},"earthing","Earthing",[59,282,283,295],{},[62,284,285],{},[65,286,287,289,291,293],{},[68,288,70],{},[68,290,73],{},[68,292,76],{},[68,294,79],{},[81,296,297,310,323],{},[65,298,299,302,305,308],{},[86,300,301],{},"Main equipotential bonding",[86,303,304],{},"A main equipotential bonding rail must be present.",[86,306,307],{},"AREI 4.2.3.2",[86,309,97],{},[65,311,312,315,318,321],{},[86,313,314],{},"Earth electrode (ring earth\u002Fearth rod)",[86,316,317],{},"For a TT or IT system, an earth electrode must be documented.",[86,319,320],{},"AREI 4.2.3",[86,322,97],{},[65,324,325,328,331,333],{},[86,326,327],{},"Earthing and supply plausibility",[86,329,330],{},"Plausibility check: a public domestic 3×230 V connection recorded as a TN system requires review.",[86,332,121],{},[86,334,149],{},[54,336,338],{"id":337},"cables-and-sizing","Cables and sizing",[59,340,341,353],{},[62,342,343],{},[65,344,345,347,349,351],{},[68,346,70],{},[68,348,73],{},[68,350,76],{},[68,352,79],{},[81,354,355,368,381,394],{},[65,356,357,360,363,366],{},[86,358,359],{},"Cable cross-section",[86,361,362],{},"The cable cross-section must match the rating of the protective device.",[86,364,365],{},"AREI 5.2.2",[86,367,97],{},[65,369,370,373,376,379],{},[86,371,372],{},"Voltage drop (ΔU)",[86,374,375],{},"Voltage drop computed from cable length: guide value 3 % for lighting and 5 % for other final circuits.",[86,377,378],{},"AREI 5.2.5",[86,380,97],{},[65,382,383,386,389,392],{},[86,384,385],{},"CPR cable fire-performance class",[86,387,388],{},"Individually laid cables must have the F1 property or reach at least CPR class Eca; class Fca is not permitted.",[86,390,391],{},"AREI 5.2.7.2",[86,393,97],{},[65,395,396,399,402,405],{},[86,397,398],{},"Cables in hollow walls: Cca\u002FPreflex",[86,400,401],{},"Cables in building cavities run in conduit (Preflex) or reach at least CPR class Cca.",[86,403,404],{},"AREI 4.3.3.5.b",[86,406,97],{},[54,408,410],{"id":409},"circuit-loading","Circuit loading",[59,412,413,425],{},[62,414,415],{},[65,416,417,419,421,423],{},[68,418,70],{},[68,420,73],{},[68,422,76],{},[68,424,79],{},[81,426,427,440],{},[65,428,429,432,435,438],{},[86,430,431],{},"Max. contact points per final circuit",[86,433,434],{},"At most 8 sockets and fixed appliances per final circuit; lighting-only points are not counted.",[86,436,437],{},"AREI 5.3.5.2b",[86,439,97],{},[65,441,442,445,448,450],{},[86,443,444],{},"Phase imbalance",[86,446,447],{},"Practice recommendation: imbalance between phases should stay below 30 %.",[86,449,121],{},[86,451,149],{},[54,453,455],{"id":454},"rooms-and-zones","Rooms and zones",[59,457,458,470],{},[62,459,460],{},[65,461,462,464,466,468],{},[68,463,70],{},[68,465,73],{},[68,467,76],{},[68,469,79],{},[81,471,472,485,498,511],{},[65,473,474,477,480,483],{},[86,475,476],{},"30 mA protection for wet rooms",[86,478,479],{},"Sockets in damp rooms must be protected by a 30 mA residual current device.",[86,481,482],{},"AREI 4.2.4.4",[86,484,97],{},[65,486,487,490,493,496],{},[86,488,489],{},"30 mA RCD for bathroom circuits",[86,491,492],{},"All circuits in bathrooms and damp rooms must be protected by a 30 mA residual current device.",[86,494,495],{},"AREI 7.1.4.3",[86,497,97],{},[65,499,500,503,506,509],{},[86,501,502],{},"Bathroom zones 0\u002F1\u002F2: permitted equipment",[86,504,505],{},"In bathroom volumes 0, 1 and 2 only certain equipment is permitted; distribution boards are prohibited there.",[86,507,508],{},"AREI 7.1.5.2",[86,510,97],{},[65,512,513,516,519,521],{},[86,514,515],{},"Smoke-detector coverage (recommendation)",[86,517,518],{},"Non-binding advice based on regional housing rules; the AREI itself does not mandate smoke detectors in dwellings.",[86,520,121],{},[86,522,149],{},[54,524,526],{"id":525},"topology-and-control","Topology and control",[59,528,529,541],{},[62,530,531],{},[65,532,533,535,537,539],{},[68,534,70],{},[68,536,73],{},[68,538,76],{},[68,540,79],{},[81,542,543],{},[65,544,545,548,551,553],{},[86,546,547],{},"Electric shutter control paths",[86,549,550],{},"Plausibility check: direct switches, actuator inputs, central controls and drive types together form a consistent control path.",[86,552,121],{},[86,554,97],{},[54,556,558],{"id":557},"photovoltaic-installation","Photovoltaic installation",[59,560,561,573],{},[62,562,563],{},[65,564,565,567,569,571],{},[68,566,70],{},[68,568,73],{},[68,570,76],{},[68,572,79],{},[81,574,575,588],{},[65,576,577,580,583,586],{},[86,578,579],{},"PV installation compliance",[86,581,582],{},"PV installation: anti-islanding, earthing of module frames, warning signs and identification of DC and AC conductors.",[86,584,585],{},"AREI 7.112.2",[86,587,97],{},[65,589,590,593,596,598],{},[86,591,592],{},"Combined current in distribution boards with multiple sources",[86,594,595],{},"In a board with local generation, grid and source currents add up per phase on jointly loaded sections.",[86,597,121],{},[86,599,97],{},[54,601,603],{"id":602},"completeness-of-the-file","Completeness of the file",[59,605,606,618],{},[62,607,608],{},[65,609,610,612,614,616],{},[68,611,70],{},[68,613,73],{},[68,615,76],{},[68,617,79],{},[81,619,620,632,645,658,670,683,695],{},[65,621,622,625,628,630],{},[86,623,624],{},"Complete connections",[86,626,627],{},"Every element in the diagram must be connected; orphan nodes indicate an incomplete model.",[86,629,121],{},[86,631,149],{},[65,633,634,637,640,643],{},[86,635,636],{},"Minimum number of lighting circuits",[86,638,639],{},"Practice recommendation: at least two lighting circuits per dwelling unit.",[86,641,642],{},"AREI 5.3.5.2.b",[86,644,97],{},[65,646,647,650,653,656],{},[86,648,649],{},"Dedicated circuits for large appliances",[86,651,652],{},"Large appliances such as washing machine, dryer, dishwasher, hob and oven each require a dedicated circuit.",[86,654,655],{},"AREI 4.3.3.3",[86,657,97],{},[65,659,660,663,666,668],{},[86,661,662],{},"Installation dossier (AREI 9.1.2)",[86,664,665],{},"The installation file requires a single-line diagram, a situation plan and a complete title block; PV needs additional documents.",[86,667,121],{},[86,669,149],{},[65,671,672,675,678,681],{},[86,673,674],{},"Placement of connection\u002Fjunction boxes",[86,676,677],{},"Structural junction boxes must appear exactly once and consistently in the diagram.",[86,679,680],{},"AREI 3.1.2.3",[86,682,149],{},[65,684,685,688,691,693],{},[86,686,687],{},"Unlinked electrical floor-plan symbols",[86,689,690],{},"Floor-plan devices without a link to the electrical topology are reported for information.",[86,692,121],{},[86,694,175],{},[65,696,697,700,703,705],{},[86,698,699],{},"Switch-control group plausibility",[86,701,702],{},"Plausibility check: a control group contains at least one switch and at least one switched load.",[86,704,121],{},[86,706,149],{},[31,708,710],{"id":709},"what-the-self-check-does-not-assess","What the self-check does not assess",[10,712,713],{},"These areas of Book 1 deliberately remain outside the automatic check:",[10,715,716,719],{},[20,717,718],{},"Special installations and locations (Part 7)."," Of fourteen chapters, PlanElec touches three, each only in part: rooms containing a bath or shower (7.1), supply of electric road vehicles (7.22) and domestic photovoltaic installations (7.112). Not covered: swimming pools (7.2), saunas (7.3), construction sites and outdoor installations (7.4), conductive confined spaces (7.6), camping sites (7.8), marinas (7.9), fairground installations (7.11), fountains (7.100), stationary vehicles (7.101), explosive atmospheres (7.102) and industrial accumulator batteries (7.103).",[10,721,722,725],{},[20,723,724],{},"The direct-current side."," The model has no separate roles for the L+, L-, M, PEM and PEL conductors. Conductor selection, colouring, combined protective conductors, DC residual current sensitivity, protection of the M conductor and permanent insulation monitoring in an IT system are therefore not verifiable. For photovoltaics this remains manual work.",[10,727,728,731],{},[20,729,730],{},"The transitional provisions of articles 59 and 69."," Whether an exception applies to an existing installation depends on data that cannot be derived from a single-line diagram — among others the PEN cross-section, the actual start of work on site and the presence of a monitoring device. PlanElec does take the relaxations of Part 8 into account by presenting certain findings on existing parts as indications rather than errors, but does not decide the exception itself.",[10,733,734,737],{},[20,735,736],{},"Inspections of installations (Part 6) and the rules of conduct (Part 9)"," fall outside the reach of a planning tool. Only the composition of the installation file is checked.",[31,739,741],{"id":740},"what-software-cannot-establish-in-principle","What software cannot establish in principle",[10,743,744],{},"Even after further extension of the model, these points remain dependent on measurement, documentation or visual inspection on site:",[746,747,748,752,755,758,761,764,767],"ul",{},[749,750,751],"li",{},"the actual wiring, continuity and polarity of the conductors;",[749,753,754],{},"the tripping characteristics and DC suitability of the devices actually installed;",[749,756,757],{},"insulation measurement and the operation of a permanent insulation monitoring device;",[749,759,760],{},"the mechanical and chemical resistance and corrosion state of the earthing;",[749,762,763],{},"the effectiveness of automatic disconnection and the real earth impedance;",[749,765,766],{},"the suitability and certification of inverters, batteries and PV components;",[749,768,769],{},"zoning, risk assessment and on-site conditions.",[31,771,773],{"id":772},"what-this-means-for-your-inspection","What this means for your inspection",[10,775,776],{},"Use the self-check to catch avoidable mistakes early: a missing residual current device, a cross-section that does not match the protection, too many contact points on one circuit, an incomplete file. These are exactly the findings that otherwise surface only at inspection.",[10,778,779],{},"Do not rely on it for the cases listed above. There, your expertise and the judgement of the accredited body remain decisive.",{"title":781,"searchDepth":782,"depth":782,"links":783},"",2,[784,795,796,797],{"id":33,"depth":782,"text":34,"children":785},[786,788,789,790,791,792,793,794],{"id":56,"depth":787,"text":57},3,{"id":279,"depth":787,"text":280},{"id":337,"depth":787,"text":338},{"id":409,"depth":787,"text":410},{"id":454,"depth":787,"text":455},{"id":525,"depth":787,"text":526},{"id":557,"depth":787,"text":558},{"id":602,"depth":787,"text":603},{"id":709,"depth":782,"text":710},{"id":740,"depth":782,"text":741},{"id":772,"depth":782,"text":773},"compliance","The complete list of rules PlanElec checks automatically — and an equally explicit list of what the self-check does not assess.","md","self-check-coverage","en",{},true,4,"\u002Fhelp\u002Fself-check-coverage.en","2026-08-17","7 min",{"title":5,"description":799},"what-the-self-check-verifies","help\u002Fself-check-coverage.en",[813,814,815,816,817,818],"AREI","RGIE","self-check","inspection","coverage","validation","2026-08-18","vzS7v_4jTdxIKNrBFeCemo2bOg4FsWZhhPciQ34uh6s",[822,1588,2203,2965],{"id":823,"title":824,"body":825,"category":798,"description":1574,"extension":800,"guideId":801,"locale":1575,"meta":1576,"navigation":804,"order":805,"path":1577,"publishedAt":807,"readTime":1578,"seo":1579,"slug":1580,"stem":1581,"tags":1582,"updatedAt":819,"__hash__":1587},"help\u002Fhelp\u002Fself-check-coverage.de.md","Was prüft die AREI-Selbstprüfung von PlanElec?",{"type":7,"value":826,"toc":1559},[827,830,833,840,845,849,862,865,869,1072,1076,1128,1132,1196,1200,1240,1244,1308,1312,1340,1344,1384,1388,1488,1492,1495,1501,1507,1513,1519,1523,1526,1549,1553,1556],[10,828,829],{},"In PlanElec stecken zwei Dinge, die leicht verwechselt werden.",[10,831,832],{},"AREI-Verweise werden erst nach der dokumentierten Quellen- und Fachfreigabe öffentlich verlinkt. Praxisregeln und Plausibilitätsprüfungen erheben keinen Regelwerk-Zitatanspruch.",[10,834,835,836,839],{},"Die ",[20,837,838],{},"automatische Selbstprüfung"," deckt davon nur einen Teil ab. Diese Seite sagt genau, welchen. Wir nennen die geprüften Regeln und ebenso die Bereiche, zu denen die Anwendung keine Aussage trifft — denn eine unvollständige Prüfung, die sich als vollständig ausgibt, ist gefährlicher als gar keine Prüfung.",[25,841,842],{},[10,843,844],{},"Die Selbstprüfung ist eine Vorbereitung. Das offizielle Urteil spricht ausschließlich eine zugelassene Kontrollstelle.",[31,846,848],{"id":847},"was-automatisch-geprüft-wird","Was automatisch geprüft wird",[10,850,851,852,855,856,858,859,861],{},"Die Anwendung kennt derzeit ",[20,853,854],{},"38 Prüfungen",". Davon verweisen ",[20,857,44],{}," auf einen konkreten AREI-Artikel; die übrigen ",[20,860,48],{}," sind Praxisregeln oder Plausibilitätsprüfungen, die wir als solche kennzeichnen und die keine regulatorische Pflicht darstellen.",[10,863,864],{},"Eine Prüfung liefert erst dann ein Ergebnis, wenn die nötigen Projektdaten erfasst sind. Fehlen sie, weist der Bericht die Prüfung als unvollständig aus — niemals als bestanden.",[54,866,868],{"id":867},"schutzmaßnahmen","Schutzmaßnahmen",[59,870,871,887],{},[62,872,873],{},[65,874,875,878,881,884],{},[68,876,877],{},"Prüfung",[68,879,880],{},"Was geprüft wird",[68,882,883],{},"Grundlage",[68,885,886],{},"Schweregrad",[81,888,889,902,914,927,939,952,964,976,988,1000,1012,1024,1036,1048,1060],{},[65,890,891,894,897,899],{},[86,892,893],{},"Haupt-Differentialschalter",[86,895,896],{},"Am Kopf der Installation muss ein Differentialschalter mit höchstens 300 mA vorhanden sein.",[86,898,94],{},[86,900,901],{},"Fehler",[65,903,904,907,910,912],{},[86,905,906],{},"Max. Stromkreise pro hochempfindlichem FI",[86,908,909],{},"Höchstens 8 Endstromkreise pro hoch­empfindlichem Differentialschalter (≤ 30 mA).",[86,911,108],{},[86,913,901],{},[65,915,916,919,922,925],{},[86,917,918],{},"Bemessungsgrenzen von Rollladenaktoren",[86,920,921],{},"Rollladenaktoren auf DIN-Schiene brauchen einen vorgeschalteten LS oder FI\u002FLS; Schutzorgan- und Motorlast bleiben innerhalb der katalogisierten Eingangs- und Kanaldaten.",[86,923,924],{},"Praxisregel",[86,926,901],{},[65,928,929,932,935,937],{},[86,930,931],{},"Wallbox-Schutz (EV-Laden)",[86,933,934],{},"Ein Ladepunkt braucht einen eigenen Stromkreis, einen dedizierten Differentialschalter und im Außenbereich mindestens IP44.",[86,936,134],{},[86,938,901],{},[65,940,941,944,947,949],{},[86,942,943],{},"FI-Selektivität (Praxisempfehlung)",[86,945,946],{},"Praxisempfehlung: Empfindlichkeit und Zeit zwischen vor- und nachgeschalteten Differentialschaltern staffeln (IEC 60364-5-53).",[86,948,924],{},[86,950,951],{},"Warnung",[65,953,954,957,960,962],{},[86,955,956],{},"30-mA-FI für Steckdosenstromkreise",[86,958,959],{},"Alle Steckdosenstromkreise müssen durch einen 30-mA-Differentialschalter geschützt sein.",[86,961,108],{},[86,963,901],{},[65,965,966,969,972,974],{},[86,967,968],{},"Überspannungsschutz (SPD)",[86,970,971],{},"Das Vorhandensein eines Überspannungsschutzgeräts (SPD) wird bewertet; das AREI schreibt keine generelle Pflicht vor.",[86,973,172],{},[86,975,175],{},[65,977,978,981,984,986],{},[86,979,980],{},"Hauptschalter mind. 40 A",[86,982,983],{},"Ein Hauptschalter muss vorhanden sein und in häuslichen Anlagen mindestens 40 A betragen.",[86,985,186],{},[86,987,901],{},[65,989,990,993,996,998],{},[86,991,992],{},"Haupt-FI mind. 40 A",[86,994,995],{},"Der Differentialschalter am Speisepunkt muss mindestens 40 A Nennstrom aufweisen.",[86,997,199],{},[86,999,901],{},[65,1001,1002,1005,1008,1010],{},[86,1003,1004],{},"Verteiler-Layout",[86,1006,1007],{},"Verteiler: Belegung innerhalb der Modulanzahl, ein Differentialschalter je Reihe und rund 20 % Reserve.",[86,1009,924],{},[86,1011,951],{},[65,1013,1014,1017,1020,1022],{},[86,1015,1016],{},"Wandeinbauheizung: 100-mA-FI",[86,1018,1019],{},"In Wänden eingebaute Heizwiderstände über 25 V AC verlangen eine getrennte 100-mA-Differenzstromeinrichtung.",[86,1021,108],{},[86,1023,901],{},[65,1025,1026,1029,1032,1034],{},[86,1027,1028],{},"Polkonfiguration in Wohnanlagen",[86,1030,1031],{},"Einpolige Automaten sind in belgischen Wohnanlagen mit Sternschaltung nicht zulässig; 1P+N verwenden.",[86,1033,236],{},[86,1035,951],{},[65,1037,1038,1041,1044,1046],{},[86,1039,1040],{},"Auslösecharakteristik gegenüber Lasttyp",[86,1042,1043],{},"Praxisempfehlung: die Kennlinie B, C oder D des Automaten muss zur Lastart passen.",[86,1045,924],{},[86,1047,951],{},[65,1049,1050,1053,1056,1058],{},[86,1051,1052],{},"Feeder-Backup-Schutz zwischen Verteilern",[86,1054,1055],{},"Eine Speiseleitung zu einem Unterverteiler verlangt ein eigenes Schutzorgan im speisenden Verteiler und eine konsistente Zuordnung.",[86,1057,261],{},[86,1059,901],{},[65,1061,1062,1065,1068,1070],{},[86,1063,1064],{},"Ausschaltvermögen gegenüber Kurzschlussstrom",[86,1066,1067],{},"Das Ausschaltvermögen jedes Automaten muss dem erwarteten Kurzschlussstrom standhalten; nur bei erfasstem Wert geprüft.",[86,1069,274],{},[86,1071,901],{},[54,1073,1075],{"id":1074},"erdung","Erdung",[59,1077,1078,1090],{},[62,1079,1080],{},[65,1081,1082,1084,1086,1088],{},[68,1083,877],{},[68,1085,880],{},[68,1087,883],{},[68,1089,886],{},[81,1091,1092,1104,1116],{},[65,1093,1094,1097,1100,1102],{},[86,1095,1096],{},"Hauptpotentialausgleich",[86,1098,1099],{},"Ein Hauptpotentialausgleich (Erdungsschiene) muss vorhanden sein.",[86,1101,307],{},[86,1103,901],{},[65,1105,1106,1109,1112,1114],{},[86,1107,1108],{},"Erdungselektrode (Hauserder\u002FStaberder)",[86,1110,1111],{},"Bei einem TT- oder IT-Netz muss eine Erdungselektrode dokumentiert sein.",[86,1113,320],{},[86,1115,901],{},[65,1117,1118,1121,1124,1126],{},[86,1119,1120],{},"Plausibilität von Erdung und Netzanschluss",[86,1122,1123],{},"Plausibilitätsprüfung: ein öffentlicher häuslicher 3×230-V-Anschluss mit gespeichertem TN-System erfordert Nachprüfung.",[86,1125,924],{},[86,1127,951],{},[54,1129,1131],{"id":1130},"kabel-und-dimensionierung","Kabel und Dimensionierung",[59,1133,1134,1146],{},[62,1135,1136],{},[65,1137,1138,1140,1142,1144],{},[68,1139,877],{},[68,1141,880],{},[68,1143,883],{},[68,1145,886],{},[81,1147,1148,1160,1172,1184],{},[65,1149,1150,1153,1156,1158],{},[86,1151,1152],{},"Kabelquerschnitt",[86,1154,1155],{},"Der Kabelquerschnitt muss zum Nennstrom der Absicherung passen.",[86,1157,365],{},[86,1159,901],{},[65,1161,1162,1165,1168,1170],{},[86,1163,1164],{},"Spannungsfall (ΔU)",[86,1166,1167],{},"Spannungsfall aus der Kabellänge berechnet: Richtwert 3 % für Beleuchtung und 5 % für andere Endstromkreise.",[86,1169,378],{},[86,1171,901],{},[65,1173,1174,1177,1180,1182],{},[86,1175,1176],{},"CPR-Brandschutzklasse von Kabeln",[86,1178,1179],{},"Einzeln verlegte Kabel müssen die Eigenschaft F1 aufweisen oder mindestens CPR-Klasse Eca erreichen; Klasse Fca ist unzulässig.",[86,1181,391],{},[86,1183,901],{},[65,1185,1186,1189,1192,1194],{},[86,1187,1188],{},"Hohlwandverlegung: Cca\u002FPreflex",[86,1190,1191],{},"Kabel in baulichen Hohlräumen werden im Leerrohr (Preflex) geführt oder erreichen mindestens CPR-Klasse Cca.",[86,1193,404],{},[86,1195,901],{},[54,1197,1199],{"id":1198},"stromkreisbelastung","Stromkreisbelastung",[59,1201,1202,1214],{},[62,1203,1204],{},[65,1205,1206,1208,1210,1212],{},[68,1207,877],{},[68,1209,880],{},[68,1211,883],{},[68,1213,886],{},[81,1215,1216,1228],{},[65,1217,1218,1221,1224,1226],{},[86,1219,1220],{},"Max. Steckdosen\u002FGeräte pro Endstromkreis",[86,1222,1223],{},"Höchstens 8 Steckdosen und ortsfeste Geräte pro Endstromkreis; reine Lichtpunkte zählen nicht mit.",[86,1225,437],{},[86,1227,901],{},[65,1229,1230,1233,1236,1238],{},[86,1231,1232],{},"Phasen-Ungleichgewicht",[86,1234,1235],{},"Praxisempfehlung: die Unsymmetrie zwischen den Phasen sollte unter 30 % bleiben.",[86,1237,924],{},[86,1239,951],{},[54,1241,1243],{"id":1242},"räume-und-zonen","Räume und Zonen",[59,1245,1246,1258],{},[62,1247,1248],{},[65,1249,1250,1252,1254,1256],{},[68,1251,877],{},[68,1253,880],{},[68,1255,883],{},[68,1257,886],{},[81,1259,1260,1272,1284,1296],{},[65,1261,1262,1265,1268,1270],{},[86,1263,1264],{},"30-mA-Schutz für Feuchträume",[86,1266,1267],{},"Steckdosen in Feuchträumen müssen durch einen 30-mA-Differentialschalter geschützt sein.",[86,1269,482],{},[86,1271,901],{},[65,1273,1274,1277,1280,1282],{},[86,1275,1276],{},"30-mA-FI für Badezimmerstromkreise",[86,1278,1279],{},"Alle Stromkreise in Badezimmern und Feuchträumen müssen durch einen 30-mA-Differentialschalter geschützt sein.",[86,1281,495],{},[86,1283,901],{},[65,1285,1286,1289,1292,1294],{},[86,1287,1288],{},"Badbereiche 0\u002F1\u002F2: Zulässigkeit von Betriebsmitteln",[86,1290,1291],{},"In den Badezimmervolumen 0, 1 und 2 sind nur bestimmte Betriebsmittel zulässig; Verteiler sind dort verboten.",[86,1293,508],{},[86,1295,901],{},[65,1297,1298,1301,1304,1306],{},[86,1299,1300],{},"Rauchmelder-Abdeckung (Empfehlung)",[86,1302,1303],{},"Unverbindlicher Hinweis auf Basis der regionalen Wohnungsvorschriften; das AREI selbst schreibt Rauchmelder für Wohnungen nicht vor.",[86,1305,924],{},[86,1307,951],{},[54,1309,1311],{"id":1310},"topologie-und-steuerung","Topologie und Steuerung",[59,1313,1314,1326],{},[62,1315,1316],{},[65,1317,1318,1320,1322,1324],{},[68,1319,877],{},[68,1321,880],{},[68,1323,883],{},[68,1325,886],{},[81,1327,1328],{},[65,1329,1330,1333,1336,1338],{},[86,1331,1332],{},"Steuerwege elektrischer Rollläden",[86,1334,1335],{},"Plausibilitätsprüfung: direkte Schalter, Aktoreingänge, zentrale Bedienungen und Antriebsart ergeben zusammen einen widerspruchsfreien Steuerweg.",[86,1337,924],{},[86,1339,901],{},[54,1341,1343],{"id":1342},"photovoltaikanlage","Photovoltaikanlage",[59,1345,1346,1358],{},[62,1347,1348],{},[65,1349,1350,1352,1354,1356],{},[68,1351,877],{},[68,1353,880],{},[68,1355,883],{},[68,1357,886],{},[81,1359,1360,1372],{},[65,1361,1362,1365,1368,1370],{},[86,1363,1364],{},"Konformität der PV-Anlage",[86,1366,1367],{},"PV-Anlage: Anti-Islanding, Erdung der Modulrahmen, Warnschilder und Kennzeichnung der DC- und AC-Leiter.",[86,1369,585],{},[86,1371,901],{},[65,1373,1374,1377,1380,1382],{},[86,1375,1376],{},"Summenstrom in Verteilungen mit Einspeisung",[86,1378,1379],{},"Bei einem Verteiler mit eigener Erzeugung addieren sich Netz- und Quellenstrom je Phase auf gemeinsam belasteten Abschnitten.",[86,1381,924],{},[86,1383,901],{},[54,1385,1387],{"id":1386},"vollständigkeit-der-akte","Vollständigkeit der Akte",[59,1389,1390,1402],{},[62,1391,1392],{},[65,1393,1394,1396,1398,1400],{},[68,1395,877],{},[68,1397,880],{},[68,1399,883],{},[68,1401,886],{},[81,1403,1404,1416,1428,1440,1452,1464,1476],{},[65,1405,1406,1409,1412,1414],{},[86,1407,1408],{},"Vollständige Verbindungen",[86,1410,1411],{},"Jedes Element im Schema muss angeschlossen sein; lose Knoten weisen auf ein unvollständiges Modell hin.",[86,1413,924],{},[86,1415,951],{},[65,1417,1418,1421,1424,1426],{},[86,1419,1420],{},"Mindestanzahl Beleuchtungsstromkreise",[86,1422,1423],{},"Praxisempfehlung: mindestens zwei Beleuchtungsstromkreise pro Wohneinheit.",[86,1425,642],{},[86,1427,901],{},[65,1429,1430,1433,1436,1438],{},[86,1431,1432],{},"Eigene Stromkreise für Großgeräte",[86,1434,1435],{},"Großgeräte wie Waschmaschine, Trockner, Spülmaschine, Kochfeld und Backofen brauchen je einen eigenen Stromkreis.",[86,1437,655],{},[86,1439,901],{},[65,1441,1442,1445,1448,1450],{},[86,1443,1444],{},"Anlagenakte (AREI 9.1.2)",[86,1446,1447],{},"Die Anlagenakte verlangt Eindrahtschema, Situationsplan und vollständige Cartouche; PV erfordert zusätzliche Unterlagen.",[86,1449,924],{},[86,1451,951],{},[65,1453,1454,1457,1460,1462],{},[86,1455,1456],{},"Platzierung von Anschluss-\u002FAbzweigdosen",[86,1458,1459],{},"Strukturelle Abzweigdosen müssen genau einmal und konsistent im Schema erscheinen.",[86,1461,680],{},[86,1463,951],{},[65,1465,1466,1469,1472,1474],{},[86,1467,1468],{},"Unverknüpfte elektrische Grundrisssymbole",[86,1470,1471],{},"Geräte im Grundriss ohne Verknüpfung zur elektrischen Topologie werden als Information gemeldet.",[86,1473,924],{},[86,1475,175],{},[65,1477,1478,1481,1484,1486],{},[86,1479,1480],{},"Plausibilität von Schalter-Steuergruppen",[86,1482,1483],{},"Plausibilitätsprüfung: eine Schaltgruppe enthält mindestens einen Schalter und mindestens eine geschaltete Last.",[86,1485,924],{},[86,1487,951],{},[31,1489,1491],{"id":1490},"was-die-selbstprüfung-nicht-beurteilt","Was die Selbstprüfung nicht beurteilt",[10,1493,1494],{},"Diese Bereiche aus Buch 1 bleiben bewusst außerhalb der automatischen Prüfung:",[10,1496,1497,1500],{},[20,1498,1499],{},"Besondere Anlagen und Räume (Teil 7)."," Von vierzehn Kapiteln berührt PlanElec drei, und diese jeweils teilweise: Räume mit Badewanne oder Dusche (7.1), Speisung elektrischer Straßenfahrzeuge (7.22) und häusliche Photovoltaikanlagen (7.112). Nicht abgedeckt sind Schwimmbäder (7.2), Saunen (7.3), Baustellen- und Außenanlagen (7.4), enge leitfähige Räume (7.6), Campingplätze (7.8), Yachthäfen (7.9), Kirmesanlagen (7.11), Springbrunnen (7.100), abgestellte Fahrzeuge (7.101), explosionsfähige Atmosphären (7.102) und industrielle Akkumulatorenbatterien (7.103).",[10,1502,1503,1506],{},[20,1504,1505],{},"Die Gleichstromseite."," Das Modell kennt keine eigenen Rollen für die Leiter L+, L-, M, PEM und PEL. Leiterwahl, Farbgebung, kombinierte Schutzleiter, DC-Differenzstromempfindlichkeit, der Schutz des M-Leiters und die permanente Isolationsüberwachung im IT-System sind daher nicht prüfbar. Für Photovoltaik bleibt das Handarbeit.",[10,1508,1509,1512],{},[20,1510,1511],{},"Die Übergangsbestimmungen der Artikel 59 und 69."," Ob eine Ausnahme für eine bestehende Anlage greift, hängt von Angaben ab, die sich aus einem Eindrahtschema nicht ableiten lassen — unter anderem vom PEN-Querschnitt, vom tatsächlichen Ausführungsbeginn vor Ort und vom Vorhandensein eines Überwachungsgeräts. PlanElec berücksichtigt zwar die Lockerungen aus Teil 8, indem bestimmte Befunde an Bestandsteilen als Hinweis statt als Fehler erscheinen, entscheidet die Ausnahme aber nicht selbst.",[10,1514,1515,1518],{},[20,1516,1517],{},"Kontrollen von Anlagen (Teil 6) und die Verhaltensvorschriften (Teil 9)"," liegen außerhalb der Reichweite eines Planungswerkzeugs. Geprüft wird lediglich die Zusammensetzung der Anlagenakte.",[31,1520,1522],{"id":1521},"was-software-grundsätzlich-nicht-feststellen-kann","Was Software grundsätzlich nicht feststellen kann",[10,1524,1525],{},"Auch nach weiterem Ausbau des Modells bleiben diese Punkte auf Messung, Unterlagen oder Sichtprüfung vor Ort angewiesen:",[746,1527,1528,1531,1534,1537,1540,1543,1546],{},[749,1529,1530],{},"die tatsächliche Verdrahtung, die Durchgängigkeit und die Polung der Leiter;",[749,1532,1533],{},"die Auslösekennlinien und die DC-Eignung der real eingebauten Geräte;",[749,1535,1536],{},"die Isolationsmessung und die Funktion eines permanenten Isolationsüberwachungsgeräts;",[749,1538,1539],{},"die mechanische und chemische Beständigkeit sowie der Korrosionszustand der Erdung;",[749,1541,1542],{},"die Wirksamkeit der automatischen Abschaltung und die reale Erdungsimpedanz;",[749,1544,1545],{},"die Eignung und die Zertifizierung von Wechselrichtern, Batterien und PV-Komponenten;",[749,1547,1548],{},"die Zoneneinteilung, die Risikobeurteilung und die Bedingungen vor Ort.",[31,1550,1552],{"id":1551},"was-das-für-ihre-kontrolle-bedeutet","Was das für Ihre Kontrolle bedeutet",[10,1554,1555],{},"Nutzen Sie die Selbstprüfung, um vermeidbare Fehler früh zu finden: einen fehlenden Differentialschalter, einen Querschnitt, der nicht zur Absicherung passt, zu viele Kontaktpunkte an einem Stromkreis, eine unvollständige Akte. Genau diese Befunde tauchen sonst erst bei der Abnahme auf.",[10,1557,1558],{},"Verlassen Sie sich nicht darauf bei den oben genannten Fällen. Dort bleiben Ihre Fachkenntnis und das Urteil der Kontrollstelle maßgeblich.",{"title":781,"searchDepth":782,"depth":782,"links":1560},[1561,1571,1572,1573],{"id":847,"depth":782,"text":848,"children":1562},[1563,1564,1565,1566,1567,1568,1569,1570],{"id":867,"depth":787,"text":868},{"id":1074,"depth":787,"text":1075},{"id":1130,"depth":787,"text":1131},{"id":1198,"depth":787,"text":1199},{"id":1242,"depth":787,"text":1243},{"id":1310,"depth":787,"text":1311},{"id":1342,"depth":787,"text":1343},{"id":1386,"depth":787,"text":1387},{"id":1490,"depth":782,"text":1491},{"id":1521,"depth":782,"text":1522},{"id":1551,"depth":782,"text":1552},"Die vollständige Liste der Regeln, die PlanElec automatisch prüft — und eine ebenso ausdrückliche Liste dessen, was die Selbstprüfung nicht beurteilt.","de",{},"\u002Fhelp\u002Fself-check-coverage.de","7 Min.",{"title":824,"description":1574},"was-die-selbstpruefung-kontrolliert","help\u002Fself-check-coverage.de",[813,814,1583,1584,1585,1586],"Selbstprüfung","Kontrolle","Abdeckung","Validierung","qhzmfsmH5xtEXzuRkucSbBy8S82LMdde5STrM98DBYY",{"id":4,"title":5,"body":1589,"category":798,"description":799,"extension":800,"guideId":801,"locale":802,"meta":2200,"navigation":804,"order":805,"path":806,"publishedAt":807,"readTime":808,"seo":2201,"slug":810,"stem":811,"tags":2202,"updatedAt":819,"__hash__":820},{"type":7,"value":1590,"toc":2185},[1591,1593,1595,1599,1603,1605,1613,1615,1617,1783,1785,1831,1833,1889,1891,1927,1929,1985,1987,2013,2015,2051,2053,2139,2141,2143,2147,2151,2155,2159,2161,2163,2179,2181,2183],[10,1592,12],{},[10,1594,15],{},[10,1596,18,1597,23],{},[20,1598,22],{},[25,1600,1601],{},[10,1602,29],{},[31,1604,34],{"id":33},[10,1606,37,1607,41,1609,45,1611,49],{},[20,1608,40],{},[20,1610,44],{},[20,1612,48],{},[10,1614,52],{},[54,1616,57],{"id":56},[59,1618,1619,1631],{},[62,1620,1621],{},[65,1622,1623,1625,1627,1629],{},[68,1624,70],{},[68,1626,73],{},[68,1628,76],{},[68,1630,79],{},[81,1632,1633,1643,1653,1663,1673,1683,1693,1703,1713,1723,1733,1743,1753,1763,1773],{},[65,1634,1635,1637,1639,1641],{},[86,1636,88],{},[86,1638,91],{},[86,1640,94],{},[86,1642,97],{},[65,1644,1645,1647,1649,1651],{},[86,1646,102],{},[86,1648,105],{},[86,1650,108],{},[86,1652,97],{},[65,1654,1655,1657,1659,1661],{},[86,1656,115],{},[86,1658,118],{},[86,1660,121],{},[86,1662,97],{},[65,1664,1665,1667,1669,1671],{},[86,1666,128],{},[86,1668,131],{},[86,1670,134],{},[86,1672,97],{},[65,1674,1675,1677,1679,1681],{},[86,1676,141],{},[86,1678,144],{},[86,1680,121],{},[86,1682,149],{},[65,1684,1685,1687,1689,1691],{},[86,1686,154],{},[86,1688,157],{},[86,1690,108],{},[86,1692,97],{},[65,1694,1695,1697,1699,1701],{},[86,1696,166],{},[86,1698,169],{},[86,1700,172],{},[86,1702,175],{},[65,1704,1705,1707,1709,1711],{},[86,1706,180],{},[86,1708,183],{},[86,1710,186],{},[86,1712,97],{},[65,1714,1715,1717,1719,1721],{},[86,1716,193],{},[86,1718,196],{},[86,1720,199],{},[86,1722,97],{},[65,1724,1725,1727,1729,1731],{},[86,1726,206],{},[86,1728,209],{},[86,1730,121],{},[86,1732,149],{},[65,1734,1735,1737,1739,1741],{},[86,1736,218],{},[86,1738,221],{},[86,1740,108],{},[86,1742,97],{},[65,1744,1745,1747,1749,1751],{},[86,1746,230],{},[86,1748,233],{},[86,1750,236],{},[86,1752,149],{},[65,1754,1755,1757,1759,1761],{},[86,1756,243],{},[86,1758,246],{},[86,1760,121],{},[86,1762,149],{},[65,1764,1765,1767,1769,1771],{},[86,1766,255],{},[86,1768,258],{},[86,1770,261],{},[86,1772,97],{},[65,1774,1775,1777,1779,1781],{},[86,1776,268],{},[86,1778,271],{},[86,1780,274],{},[86,1782,97],{},[54,1784,280],{"id":279},[59,1786,1787,1799],{},[62,1788,1789],{},[65,1790,1791,1793,1795,1797],{},[68,1792,70],{},[68,1794,73],{},[68,1796,76],{},[68,1798,79],{},[81,1800,1801,1811,1821],{},[65,1802,1803,1805,1807,1809],{},[86,1804,301],{},[86,1806,304],{},[86,1808,307],{},[86,1810,97],{},[65,1812,1813,1815,1817,1819],{},[86,1814,314],{},[86,1816,317],{},[86,1818,320],{},[86,1820,97],{},[65,1822,1823,1825,1827,1829],{},[86,1824,327],{},[86,1826,330],{},[86,1828,121],{},[86,1830,149],{},[54,1832,338],{"id":337},[59,1834,1835,1847],{},[62,1836,1837],{},[65,1838,1839,1841,1843,1845],{},[68,1840,70],{},[68,1842,73],{},[68,1844,76],{},[68,1846,79],{},[81,1848,1849,1859,1869,1879],{},[65,1850,1851,1853,1855,1857],{},[86,1852,359],{},[86,1854,362],{},[86,1856,365],{},[86,1858,97],{},[65,1860,1861,1863,1865,1867],{},[86,1862,372],{},[86,1864,375],{},[86,1866,378],{},[86,1868,97],{},[65,1870,1871,1873,1875,1877],{},[86,1872,385],{},[86,1874,388],{},[86,1876,391],{},[86,1878,97],{},[65,1880,1881,1883,1885,1887],{},[86,1882,398],{},[86,1884,401],{},[86,1886,404],{},[86,1888,97],{},[54,1890,410],{"id":409},[59,1892,1893,1905],{},[62,1894,1895],{},[65,1896,1897,1899,1901,1903],{},[68,1898,70],{},[68,1900,73],{},[68,1902,76],{},[68,1904,79],{},[81,1906,1907,1917],{},[65,1908,1909,1911,1913,1915],{},[86,1910,431],{},[86,1912,434],{},[86,1914,437],{},[86,1916,97],{},[65,1918,1919,1921,1923,1925],{},[86,1920,444],{},[86,1922,447],{},[86,1924,121],{},[86,1926,149],{},[54,1928,455],{"id":454},[59,1930,1931,1943],{},[62,1932,1933],{},[65,1934,1935,1937,1939,1941],{},[68,1936,70],{},[68,1938,73],{},[68,1940,76],{},[68,1942,79],{},[81,1944,1945,1955,1965,1975],{},[65,1946,1947,1949,1951,1953],{},[86,1948,476],{},[86,1950,479],{},[86,1952,482],{},[86,1954,97],{},[65,1956,1957,1959,1961,1963],{},[86,1958,489],{},[86,1960,492],{},[86,1962,495],{},[86,1964,97],{},[65,1966,1967,1969,1971,1973],{},[86,1968,502],{},[86,1970,505],{},[86,1972,508],{},[86,1974,97],{},[65,1976,1977,1979,1981,1983],{},[86,1978,515],{},[86,1980,518],{},[86,1982,121],{},[86,1984,149],{},[54,1986,526],{"id":525},[59,1988,1989,2001],{},[62,1990,1991],{},[65,1992,1993,1995,1997,1999],{},[68,1994,70],{},[68,1996,73],{},[68,1998,76],{},[68,2000,79],{},[81,2002,2003],{},[65,2004,2005,2007,2009,2011],{},[86,2006,547],{},[86,2008,550],{},[86,2010,121],{},[86,2012,97],{},[54,2014,558],{"id":557},[59,2016,2017,2029],{},[62,2018,2019],{},[65,2020,2021,2023,2025,2027],{},[68,2022,70],{},[68,2024,73],{},[68,2026,76],{},[68,2028,79],{},[81,2030,2031,2041],{},[65,2032,2033,2035,2037,2039],{},[86,2034,579],{},[86,2036,582],{},[86,2038,585],{},[86,2040,97],{},[65,2042,2043,2045,2047,2049],{},[86,2044,592],{},[86,2046,595],{},[86,2048,121],{},[86,2050,97],{},[54,2052,603],{"id":602},[59,2054,2055,2067],{},[62,2056,2057],{},[65,2058,2059,2061,2063,2065],{},[68,2060,70],{},[68,2062,73],{},[68,2064,76],{},[68,2066,79],{},[81,2068,2069,2079,2089,2099,2109,2119,2129],{},[65,2070,2071,2073,2075,2077],{},[86,2072,624],{},[86,2074,627],{},[86,2076,121],{},[86,2078,149],{},[65,2080,2081,2083,2085,2087],{},[86,2082,636],{},[86,2084,639],{},[86,2086,642],{},[86,2088,97],{},[65,2090,2091,2093,2095,2097],{},[86,2092,649],{},[86,2094,652],{},[86,2096,655],{},[86,2098,97],{},[65,2100,2101,2103,2105,2107],{},[86,2102,662],{},[86,2104,665],{},[86,2106,121],{},[86,2108,149],{},[65,2110,2111,2113,2115,2117],{},[86,2112,674],{},[86,2114,677],{},[86,2116,680],{},[86,2118,149],{},[65,2120,2121,2123,2125,2127],{},[86,2122,687],{},[86,2124,690],{},[86,2126,121],{},[86,2128,175],{},[65,2130,2131,2133,2135,2137],{},[86,2132,699],{},[86,2134,702],{},[86,2136,121],{},[86,2138,149],{},[31,2140,710],{"id":709},[10,2142,713],{},[10,2144,2145,719],{},[20,2146,718],{},[10,2148,2149,725],{},[20,2150,724],{},[10,2152,2153,731],{},[20,2154,730],{},[10,2156,2157,737],{},[20,2158,736],{},[31,2160,741],{"id":740},[10,2162,744],{},[746,2164,2165,2167,2169,2171,2173,2175,2177],{},[749,2166,751],{},[749,2168,754],{},[749,2170,757],{},[749,2172,760],{},[749,2174,763],{},[749,2176,766],{},[749,2178,769],{},[31,2180,773],{"id":772},[10,2182,776],{},[10,2184,779],{},{"title":781,"searchDepth":782,"depth":782,"links":2186},[2187,2197,2198,2199],{"id":33,"depth":782,"text":34,"children":2188},[2189,2190,2191,2192,2193,2194,2195,2196],{"id":56,"depth":787,"text":57},{"id":279,"depth":787,"text":280},{"id":337,"depth":787,"text":338},{"id":409,"depth":787,"text":410},{"id":454,"depth":787,"text":455},{"id":525,"depth":787,"text":526},{"id":557,"depth":787,"text":558},{"id":602,"depth":787,"text":603},{"id":709,"depth":782,"text":710},{"id":740,"depth":782,"text":741},{"id":772,"depth":782,"text":773},{},{"title":5,"description":799},[813,814,815,816,817,818],{"id":2204,"title":2205,"body":2206,"category":798,"description":2953,"extension":800,"guideId":801,"locale":2954,"meta":2955,"navigation":804,"order":805,"path":2956,"publishedAt":807,"readTime":808,"seo":2957,"slug":2958,"stem":2959,"tags":2960,"updatedAt":819,"__hash__":2964},"help\u002Fhelp\u002Fself-check-coverage.fr.md","Que vérifie l'autocontrôle RGIE de PlanElec ?",{"type":7,"value":2207,"toc":2938},[2208,2211,2214,2221,2226,2230,2243,2246,2248,2451,2455,2507,2511,2575,2579,2619,2623,2687,2691,2719,2723,2763,2767,2867,2871,2874,2880,2886,2892,2898,2902,2905,2928,2932,2935],[10,2209,2210],{},"PlanElec réunit deux choses qu'il est facile de confondre.",[10,2212,2213],{},"Les références RGIE ne sont liées publiquement qu’après les validations documentées de la source et du fond. Les règles de pratique et contrôles de plausibilité ne prétendent pas citer le règlement.",[10,2215,2216,2217,2220],{},"L'",[20,2218,2219],{},"autocontrôle automatique"," n'en couvre qu'une partie. Cette page indique précisément laquelle. Nous énumérons les règles vérifiées et les domaines où l'application ne se prononce pas, car un contrôle incomplet qui se présente comme complet est plus dangereux qu'une absence de contrôle.",[25,2222,2223],{},[10,2224,2225],{},"L'autocontrôle est une préparation. Seul un organisme de contrôle agréé délivre le jugement officiel.",[31,2227,2229],{"id":2228},"ce-qui-est-vérifié-automatiquement","Ce qui est vérifié automatiquement",[10,2231,2232,2233,2236,2237,2239,2240,2242],{},"L'application compte actuellement ",[20,2234,2235],{},"38 contrôles",". Parmi eux, ",[20,2238,44],{}," renvoient à un article précis du RGIE ; les ",[20,2241,48],{}," autres sont des règles de pratique ou des contrôles de plausibilité, signalés comme tels, sans caractère réglementaire.",[10,2244,2245],{},"Un contrôle ne produit un résultat que si les données de projet nécessaires sont renseignées. À défaut, le rapport marque le contrôle comme incomplet — jamais comme réussi.",[54,2247,57],{"id":56},[59,2249,2250,2266],{},[62,2251,2252],{},[65,2253,2254,2257,2260,2263],{},[68,2255,2256],{},"Contrôle",[68,2258,2259],{},"Ce qui est vérifié",[68,2261,2262],{},"Base",[68,2264,2265],{},"Gravité",[81,2267,2268,2281,2293,2306,2318,2331,2343,2355,2367,2379,2391,2403,2415,2427,2439],{},[65,2269,2270,2273,2276,2278],{},[86,2271,2272],{},"Différentiel principal",[86,2274,2275],{},"En tête d'installation, un différentiel de 300 mA au maximum doit être présent.",[86,2277,94],{},[86,2279,2280],{},"Erreur",[65,2282,2283,2286,2289,2291],{},[86,2284,2285],{},"Max. de circuits par différentiel à haute sensibilité",[86,2287,2288],{},"Au maximum 8 circuits terminaux par différentiel à haute sensibilité (≤ 30 mA).",[86,2290,108],{},[86,2292,2280],{},[65,2294,2295,2298,2301,2304],{},[86,2296,2297],{},"Calibres des actionneurs de volets",[86,2299,2300],{},"Les actionneurs de volet sur rail DIN exigent un disjoncteur ou différentiel en amont ; les charges de protection et de moteur restent dans les valeurs d'entrée et de canal du catalogue.",[86,2302,2303],{},"Règle de pratique",[86,2305,2280],{},[65,2307,2308,2311,2314,2316],{},[86,2309,2310],{},"Protection des bornes de recharge (VE)",[86,2312,2313],{},"Un point de charge exige un circuit propre, un différentiel dédié et au moins IP44 à l'extérieur.",[86,2315,134],{},[86,2317,2280],{},[65,2319,2320,2323,2326,2328],{},[86,2321,2322],{},"Sélectivité des différentiels (recommandation pratique)",[86,2324,2325],{},"Recommandation de pratique : échelonner sensibilité et temporisation entre différentiels amont et aval (CEI 60364-5-53).",[86,2327,2303],{},[86,2329,2330],{},"Avertissement",[65,2332,2333,2336,2339,2341],{},[86,2334,2335],{},"Différentiel 30 mA pour les circuits de prises",[86,2337,2338],{},"Tous les circuits de prises doivent être protégés par un différentiel de 30 mA.",[86,2340,108],{},[86,2342,2280],{},[65,2344,2345,2348,2351,2353],{},[86,2346,2347],{},"Protection contre les surtensions (SPD)",[86,2349,2350],{},"La présence d’un parafoudre (SPD) est évaluée ; le RGIE n’impose pas d’obligation générale.",[86,2352,172],{},[86,2354,175],{},[65,2356,2357,2360,2363,2365],{},[86,2358,2359],{},"Interrupteur principal min. 40 A",[86,2361,2362],{},"Un interrupteur général doit être présent et atteindre au moins 40 A dans les installations domestiques.",[86,2364,186],{},[86,2366,2280],{},[65,2368,2369,2372,2375,2377],{},[86,2370,2371],{},"Différentiel principal min. 40 A",[86,2373,2374],{},"Le différentiel au point d’alimentation doit présenter un calibre d’au moins 40 A.",[86,2376,199],{},[86,2378,2280],{},[65,2380,2381,2384,2387,2389],{},[86,2382,2383],{},"Implantation du tableau",[86,2385,2386],{},"Tableau : occupation dans la limite des modules, un différentiel par rangée et une réserve d’environ 20 %.",[86,2388,2303],{},[86,2390,2330],{},[65,2392,2393,2396,2399,2401],{},[86,2394,2395],{},"Chauffage encastré en paroi : différentiel 100 mA",[86,2397,2398],{},"Les résistances chauffantes noyées dans les parois au-delà de 25 V CA exigent un différentiel séparé de 100 mA.",[86,2400,108],{},[86,2402,2280],{},[65,2404,2405,2408,2411,2413],{},[86,2406,2407],{},"Configuration des pôles en installation domestique",[86,2409,2410],{},"Les disjoncteurs unipolaires ne sont pas admis dans les habitations belges en schéma étoile ; utilisez 1P+N.",[86,2412,236],{},[86,2414,2330],{},[65,2416,2417,2420,2423,2425],{},[86,2418,2419],{},"Courbe de déclenchement selon le type de charge",[86,2421,2422],{},"Recommandation de pratique : la courbe B, C ou D du disjoncteur doit correspondre au type de charge.",[86,2424,2303],{},[86,2426,2330],{},[65,2428,2429,2432,2435,2437],{},[86,2430,2431],{},"Protection amont des départs entre tableaux",[86,2433,2434],{},"Une liaison vers un tableau divisionnaire exige une protection propre dans le tableau amont et un couplage cohérent.",[86,2436,261],{},[86,2438,2280],{},[65,2440,2441,2444,2447,2449],{},[86,2442,2443],{},"Pouvoir de coupure par rapport au courant de court-circuit",[86,2445,2446],{},"Le pouvoir de coupure de chaque disjoncteur doit supporter le courant de court-circuit présumé ; vérifié uniquement si la valeur est renseignée.",[86,2448,274],{},[86,2450,2280],{},[54,2452,2454],{"id":2453},"mise-à-la-terre","Mise à la terre",[59,2456,2457,2469],{},[62,2458,2459],{},[65,2460,2461,2463,2465,2467],{},[68,2462,2256],{},[68,2464,2259],{},[68,2466,2262],{},[68,2468,2265],{},[81,2470,2471,2483,2495],{},[65,2472,2473,2476,2479,2481],{},[86,2474,2475],{},"Liaison équipotentielle principale",[86,2477,2478],{},"Une liaison équipotentielle principale (barrette de terre) doit être présente.",[86,2480,307],{},[86,2482,2280],{},[65,2484,2485,2488,2491,2493],{},[86,2486,2487],{},"Prise de terre (boucle\u002Fpiquet)",[86,2489,2490],{},"Pour un réseau TT ou IT, une prise de terre doit être documentée.",[86,2492,320],{},[86,2494,2280],{},[65,2496,2497,2500,2503,2505],{},[86,2498,2499],{},"Cohérence de la mise à la terre et du raccordement",[86,2501,2502],{},"Contrôle de plausibilité : un raccordement domestique public 3×230 V avec un schéma TN enregistré demande vérification.",[86,2504,2303],{},[86,2506,2330],{},[54,2508,2510],{"id":2509},"câbles-et-dimensionnement","Câbles et dimensionnement",[59,2512,2513,2525],{},[62,2514,2515],{},[65,2516,2517,2519,2521,2523],{},[68,2518,2256],{},[68,2520,2259],{},[68,2522,2262],{},[68,2524,2265],{},[81,2526,2527,2539,2551,2563],{},[65,2528,2529,2532,2535,2537],{},[86,2530,2531],{},"Section des câbles",[86,2533,2534],{},"La section du câble doit correspondre au calibre de la protection.",[86,2536,365],{},[86,2538,2280],{},[65,2540,2541,2544,2547,2549],{},[86,2542,2543],{},"Chute de tension (ΔU)",[86,2545,2546],{},"Chute de tension calculée sur la longueur du câble : valeur indicative de 3 % en éclairage et 5 % pour les autres circuits terminaux.",[86,2548,378],{},[86,2550,2280],{},[65,2552,2553,2556,2559,2561],{},[86,2554,2555],{},"Classe de réaction au feu CPR des câbles",[86,2557,2558],{},"Les câbles posés individuellement doivent présenter la propriété F1 ou atteindre au moins la classe CPR Eca ; la classe Fca est interdite.",[86,2560,391],{},[86,2562,2280],{},[65,2564,2565,2568,2571,2573],{},[86,2566,2567],{},"Pose en parois creuses : Cca\u002FPreflex",[86,2569,2570],{},"Les câbles dans les cavités constructives passent en gaine (Preflex) ou atteignent au moins la classe CPR Cca.",[86,2572,404],{},[86,2574,2280],{},[54,2576,2578],{"id":2577},"charge-des-circuits","Charge des circuits",[59,2580,2581,2593],{},[62,2582,2583],{},[65,2584,2585,2587,2589,2591],{},[68,2586,2256],{},[68,2588,2259],{},[68,2590,2262],{},[68,2592,2265],{},[81,2594,2595,2607],{},[65,2596,2597,2600,2603,2605],{},[86,2598,2599],{},"Max. prises\u002Fappareils par circuit terminal",[86,2601,2602],{},"Au maximum 8 prises et appareils fixes par circuit terminal ; les points lumineux seuls ne comptent pas.",[86,2604,437],{},[86,2606,2280],{},[65,2608,2609,2612,2615,2617],{},[86,2610,2611],{},"Déséquilibre des phases",[86,2613,2614],{},"Recommandation de pratique : le déséquilibre entre phases reste de préférence sous 30 %.",[86,2616,2303],{},[86,2618,2330],{},[54,2620,2622],{"id":2621},"locaux-et-volumes","Locaux et volumes",[59,2624,2625,2637],{},[62,2626,2627],{},[65,2628,2629,2631,2633,2635],{},[68,2630,2256],{},[68,2632,2259],{},[68,2634,2262],{},[68,2636,2265],{},[81,2638,2639,2651,2663,2675],{},[65,2640,2641,2644,2647,2649],{},[86,2642,2643],{},"Protection 30 mA des locaux humides",[86,2645,2646],{},"Les prises des locaux humides doivent être protégées par un différentiel de 30 mA.",[86,2648,482],{},[86,2650,2280],{},[65,2652,2653,2656,2659,2661],{},[86,2654,2655],{},"Différentiel 30 mA pour les circuits de salle de bains",[86,2657,2658],{},"Tous les circuits des salles de bains et locaux humides doivent être protégés par un différentiel de 30 mA.",[86,2660,495],{},[86,2662,2280],{},[65,2664,2665,2668,2671,2673],{},[86,2666,2667],{},"Volumes 0\u002F1\u002F2 de salle de bains : admissibilité du matériel",[86,2669,2670],{},"Dans les volumes de salle de bains 0, 1 et 2, seul certain matériel est admis ; les tableaux y sont interdits.",[86,2672,508],{},[86,2674,2280],{},[65,2676,2677,2680,2683,2685],{},[86,2678,2679],{},"Couverture des détecteurs de fumée (recommandation)",[86,2681,2682],{},"Avis non contraignant fondé sur les règles régionales du logement ; le RGIE lui-même n’impose pas de détecteurs de fumée en habitation.",[86,2684,2303],{},[86,2686,2330],{},[54,2688,2690],{"id":2689},"topologie-et-commande","Topologie et commande",[59,2692,2693,2705],{},[62,2694,2695],{},[65,2696,2697,2699,2701,2703],{},[68,2698,2256],{},[68,2700,2259],{},[68,2702,2262],{},[68,2704,2265],{},[81,2706,2707],{},[65,2708,2709,2712,2715,2717],{},[86,2710,2711],{},"Chaînes de commande des volets électriques",[86,2713,2714],{},"Contrôle de plausibilité : interrupteurs directs, entrées d’actionneur, commandes centrales et types de moteur forment un chemin de commande cohérent.",[86,2716,2303],{},[86,2718,2280],{},[54,2720,2722],{"id":2721},"installation-photovoltaïque","Installation photovoltaïque",[59,2724,2725,2737],{},[62,2726,2727],{},[65,2728,2729,2731,2733,2735],{},[68,2730,2256],{},[68,2732,2259],{},[68,2734,2262],{},[68,2736,2265],{},[81,2738,2739,2751],{},[65,2740,2741,2744,2747,2749],{},[86,2742,2743],{},"Conformité de l'installation photovoltaïque",[86,2745,2746],{},"Installation PV : anti-îlotage, mise à la terre des cadres de modules, panneaux d’avertissement et repérage des conducteurs CC et CA.",[86,2748,585],{},[86,2750,2280],{},[65,2752,2753,2756,2759,2761],{},[86,2754,2755],{},"Courant cumulé dans les tableaux à sources multiples",[86,2757,2758],{},"Dans un tableau avec production propre, courants du réseau et de la source s’additionnent par phase sur les tronçons communs.",[86,2760,2303],{},[86,2762,2280],{},[54,2764,2766],{"id":2765},"complétude-du-dossier","Complétude du dossier",[59,2768,2769,2781],{},[62,2770,2771],{},[65,2772,2773,2775,2777,2779],{},[68,2774,2256],{},[68,2776,2259],{},[68,2778,2262],{},[68,2780,2265],{},[81,2782,2783,2795,2807,2819,2831,2843,2855],{},[65,2784,2785,2788,2791,2793],{},[86,2786,2787],{},"Connexions complètes",[86,2789,2790],{},"Chaque élément du schéma doit être raccordé ; un nœud isolé signale un modèle incomplet.",[86,2792,2303],{},[86,2794,2330],{},[65,2796,2797,2800,2803,2805],{},[86,2798,2799],{},"Nombre minimal de circuits d'éclairage",[86,2801,2802],{},"Recommandation de pratique : au moins deux circuits d’éclairage par unité de logement.",[86,2804,642],{},[86,2806,2280],{},[65,2808,2809,2812,2815,2817],{},[86,2810,2811],{},"Circuits dédiés aux gros appareils",[86,2813,2814],{},"Les gros appareils — lave-linge, sèche-linge, lave-vaisselle, taque et four — exigent chacun un circuit propre.",[86,2816,655],{},[86,2818,2280],{},[65,2820,2821,2824,2827,2829],{},[86,2822,2823],{},"Dossier de l'installation (RGIE 9.1.2)",[86,2825,2826],{},"Le dossier d’installation exige un schéma unifilaire, un plan de situation et un cartouche complet ; le PV demande des documents supplémentaires.",[86,2828,2303],{},[86,2830,2330],{},[65,2832,2833,2836,2839,2841],{},[86,2834,2835],{},"Implantation des boîtes de connexion\u002Fdérivation",[86,2837,2838],{},"Les boîtes de dérivation structurelles doivent apparaître une seule fois et de manière cohérente dans le schéma.",[86,2840,680],{},[86,2842,2330],{},[65,2844,2845,2848,2851,2853],{},[86,2846,2847],{},"Symboles électriques du plan non liés",[86,2849,2850],{},"Les appareils du plan sans lien avec la topologie électrique sont signalés à titre informatif.",[86,2852,2303],{},[86,2854,175],{},[65,2856,2857,2860,2863,2865],{},[86,2858,2859],{},"Plausibilité des groupes de commande",[86,2861,2862],{},"Contrôle de plausibilité : un groupe de commande contient au moins un interrupteur et au moins une charge commandée.",[86,2864,2303],{},[86,2866,2330],{},[31,2868,2870],{"id":2869},"ce-que-lautocontrôle-névalue-pas","Ce que l'autocontrôle n'évalue pas",[10,2872,2873],{},"Ces parties du Livre 1 restent délibérément hors du contrôle automatique :",[10,2875,2876,2879],{},[20,2877,2878],{},"Installations et locaux particuliers (Partie 7)."," Sur quatorze chapitres, PlanElec en touche trois, et chaque fois partiellement : locaux contenant une baignoire ou une douche (7.1), alimentation des véhicules routiers électriques (7.22) et installations photovoltaïques domestiques (7.112). Ne sont pas couverts : les piscines (7.2), les saunas (7.3), les installations de chantier et extérieures (7.4), les enceintes conductrices exiguës (7.6), les campings (7.8), les ports de plaisance (7.9), les installations foraines (7.11), les fontaines (7.100), les véhicules en stationnement (7.101), les atmosphères explosives (7.102) et les batteries d'accumulateurs industrielles (7.103).",[10,2881,2882,2885],{},[20,2883,2884],{},"Le côté courant continu."," Le modèle ne distingue pas les rôles de conducteur L+, L-, M, PEM et PEL. Le choix des conducteurs, les couleurs, les conducteurs de protection combinés, la sensibilité différentielle en continu, la protection du conducteur M et le contrôle permanent d'isolement en schéma IT ne sont donc pas vérifiables. Pour le photovoltaïque, cela reste du travail manuel.",[10,2887,2888,2891],{},[20,2889,2890],{},"Les dispositions transitoires des articles 59 et 69."," L'application d'une exception à une installation existante dépend de données qui ne se déduisent pas d'un schéma unifilaire — notamment la section du PEN, le début effectif des travaux sur place et la présence d'un dispositif de contrôle. PlanElec tient compte des assouplissements de la Partie 8 en présentant certains constats sur les parties existantes comme des indications plutôt que comme des erreurs, mais ne tranche pas lui-même l'exception.",[10,2893,2894,2897],{},[20,2895,2896],{},"Les contrôles des installations (Partie 6) et les prescriptions de comportement (Partie 9)"," sortent du champ d'un outil de planification. Seule la composition du dossier d'installation est vérifiée.",[31,2899,2901],{"id":2900},"ce-quun-logiciel-ne-peut-pas-établir-par-principe","Ce qu'un logiciel ne peut pas établir par principe",[10,2903,2904],{},"Même après extension du modèle, ces points resteront tributaires d'une mesure, d'un document ou d'un contrôle visuel sur place :",[746,2906,2907,2910,2913,2916,2919,2922,2925],{},[749,2908,2909],{},"le câblage réel, la continuité et la polarité des conducteurs ;",[749,2911,2912],{},"les courbes de déclenchement et l'aptitude au continu des appareils effectivement posés ;",[749,2914,2915],{},"la mesure d'isolement et le fonctionnement d'un contrôleur permanent d'isolement ;",[749,2917,2918],{},"la tenue mécanique et chimique ainsi que l'état de corrosion de la mise à la terre ;",[749,2920,2921],{},"l'efficacité de la coupure automatique et l'impédance de terre réelle ;",[749,2923,2924],{},"l'aptitude et la certification des onduleurs, batteries et composants PV ;",[749,2926,2927],{},"le zonage, l'analyse de risque et les conditions du site.",[31,2929,2931],{"id":2930},"ce-que-cela-signifie-pour-votre-contrôle","Ce que cela signifie pour votre contrôle",[10,2933,2934],{},"Utilisez l'autocontrôle pour détecter tôt les erreurs évitables : un différentiel manquant, une section qui ne correspond pas à la protection, trop de points de contact sur un circuit, un dossier incomplet. Ce sont précisément les constats qui, sinon, n'apparaissent qu'à la réception.",[10,2936,2937],{},"N'y comptez pas pour les cas énumérés ci-dessus. Votre expertise et le jugement de l'organisme agréé y restent déterminants.",{"title":781,"searchDepth":782,"depth":782,"links":2939},[2940,2950,2951,2952],{"id":2228,"depth":782,"text":2229,"children":2941},[2942,2943,2944,2945,2946,2947,2948,2949],{"id":56,"depth":787,"text":57},{"id":2453,"depth":787,"text":2454},{"id":2509,"depth":787,"text":2510},{"id":2577,"depth":787,"text":2578},{"id":2621,"depth":787,"text":2622},{"id":2689,"depth":787,"text":2690},{"id":2721,"depth":787,"text":2722},{"id":2765,"depth":787,"text":2766},{"id":2869,"depth":782,"text":2870},{"id":2900,"depth":782,"text":2901},{"id":2930,"depth":782,"text":2931},"La liste complète des règles vérifiées automatiquement par PlanElec — et une liste tout aussi explicite de ce que l'autocontrôle n'évalue pas.","fr",{},"\u002Fhelp\u002Fself-check-coverage.fr",{"title":2205,"description":2953},"ce-que-verifie-l-autocontrole","help\u002Fself-check-coverage.fr",[814,813,2961,2962,2963,818],"autocontrôle","contrôle","couverture","Z5DQlp6JYzKVR97InkvOKuYnzseDlY_C4PO_HR77OU4",{"id":2966,"title":2967,"body":2968,"category":798,"description":3717,"extension":800,"guideId":801,"locale":3718,"meta":3719,"navigation":804,"order":805,"path":3720,"publishedAt":807,"readTime":808,"seo":3721,"slug":3722,"stem":3723,"tags":3724,"updatedAt":819,"__hash__":3729},"help\u002Fhelp\u002Fself-check-coverage.nl.md","Wat controleert de AREI-zelfcontrole van PlanElec?",{"type":7,"value":2969,"toc":3702},[2970,2973,2976,2983,2988,2992,3005,3008,3012,3215,3219,3271,3275,3339,3343,3383,3387,3451,3455,3483,3487,3527,3531,3631,3635,3638,3644,3650,3656,3662,3666,3669,3692,3696,3699],[10,2971,2972],{},"In PlanElec zitten twee verschillende dingen die makkelijk verward worden.",[10,2974,2975],{},"AREI-verwijzingen worden pas na de gedocumenteerde bron- en vakinhoudelijke vrijgave publiek gelinkt. Praktijkregels en plausibiliteitscontroles maken geen regeltekstclaim.",[10,2977,2978,2979,2982],{},"De ",[20,2980,2981],{},"automatische zelfcontrole"," dekt daarvan slechts een deel. Deze pagina zegt precies welk deel dat is. Wij vermelden de regels die getoetst worden én de gebieden waar de toepassing geen uitspraak doet, omdat een onvolledige controle die zich als volledig voordoet gevaarlijker is dan helemaal geen controle.",[25,2984,2985],{},[10,2986,2987],{},"De zelfcontrole is een voorbereiding. Het officiële oordeel komt uitsluitend van een erkend controleorganisme.",[31,2989,2991],{"id":2990},"wat-automatisch-getoetst-wordt","Wat automatisch getoetst wordt",[10,2993,2994,2995,2998,2999,3001,3002,3004],{},"De toepassing kent op dit moment ",[20,2996,2997],{},"38 controles",". Daarvan verwijzen er ",[20,3000,44],{}," naar een concreet AREI-artikel; de overige ",[20,3003,48],{}," zijn praktijkregels of plausibiliteitscontroles die wij als zodanig aanduiden en die geen reglementaire verplichting zijn.",[10,3006,3007],{},"Een controle levert pas een resultaat op wanneer de nodige projectgegevens ingevuld zijn. Ontbreken die, dan markeert het rapport de controle als onvolledig — nooit als geslaagd.",[54,3009,3011],{"id":3010},"beveiliging","Beveiliging",[59,3013,3014,3029],{},[62,3015,3016],{},[65,3017,3018,3021,3024,3026],{},[68,3019,3020],{},"Controle",[68,3022,3023],{},"Wat er getoetst wordt",[68,3025,76],{},[68,3027,3028],{},"Ernst",[81,3030,3031,3044,3056,3069,3081,3094,3106,3119,3131,3143,3155,3167,3179,3191,3203],{},[65,3032,3033,3036,3039,3041],{},[86,3034,3035],{},"Hoofddifferentieelschakelaar",[86,3037,3038],{},"Aan het hoofd van de installatie moet een differentieelschakelaar van hoogstens 300 mA aanwezig zijn.",[86,3040,94],{},[86,3042,3043],{},"Fout",[65,3045,3046,3049,3052,3054],{},[86,3047,3048],{},"Max. stroomkringen per hooggevoelige differentieel",[86,3050,3051],{},"Hoogstens 8 eindstroomkringen per hooggevoelige differentieelschakelaar (≤ 30 mA).",[86,3053,108],{},[86,3055,3043],{},[65,3057,3058,3061,3064,3067],{},[86,3059,3060],{},"Nominale waarden van rolluikactoren",[86,3062,3063],{},"Rolluikactoren op DIN-rail vragen een automaat of aardlekautomaat stroomopwaarts; beveiligings- en motorlast blijven binnen de gecatalogiseerde ingangs- en kanaalwaarden.",[86,3065,3066],{},"Praktijkregel",[86,3068,3043],{},[65,3070,3071,3074,3077,3079],{},[86,3072,3073],{},"Beveiliging van laadpunten (EV-laden)",[86,3075,3076],{},"Een laadpunt vraagt een eigen stroomkring, een toegewijde differentieelschakelaar en buiten minstens IP44.",[86,3078,134],{},[86,3080,3043],{},[65,3082,3083,3086,3089,3091],{},[86,3084,3085],{},"Selectiviteit van differentieelschakelaars (praktijkaanbeveling)",[86,3087,3088],{},"Praktijkadvies: stem gevoeligheid en tijd af tussen boven- en ondergeschikte differentieelschakelaars (IEC 60364-5-53).",[86,3090,3066],{},[86,3092,3093],{},"Waarschuwing",[65,3095,3096,3099,3102,3104],{},[86,3097,3098],{},"30mA-differentieel voor stopcontactkringen",[86,3100,3101],{},"Alle stopcontactkringen moeten door een differentieelschakelaar van 30 mA beschermd zijn.",[86,3103,108],{},[86,3105,3043],{},[65,3107,3108,3111,3114,3116],{},[86,3109,3110],{},"Overspanningsbeveiliging (SPD)",[86,3112,3113],{},"Een overspanningsbeveiliging (SPD) wordt beoordeeld op aanwezigheid; het AREI legt geen algemene plicht op.",[86,3115,172],{},[86,3117,3118],{},"Informatie",[65,3120,3121,3124,3127,3129],{},[86,3122,3123],{},"Hoofdschakelaar min. 40 A",[86,3125,3126],{},"Een hoofdschakelaar moet aanwezig zijn en in huishoudelijke installaties minstens 40 A bedragen.",[86,3128,186],{},[86,3130,3043],{},[65,3132,3133,3136,3139,3141],{},[86,3134,3135],{},"Hoofddifferentieel min. 40 A",[86,3137,3138],{},"De differentieelschakelaar aan het voedingspunt moet minstens 40 A nominale stroom hebben.",[86,3140,199],{},[86,3142,3043],{},[65,3144,3145,3148,3151,3153],{},[86,3146,3147],{},"Verdeelbordindeling",[86,3149,3150],{},"Verdeelkast: bezetting binnen het aantal modules, een differentieelschakelaar per rij en een reserve van ongeveer 20 %.",[86,3152,3066],{},[86,3154,3093],{},[65,3156,3157,3160,3163,3165],{},[86,3158,3159],{},"Ingebouwde wandverwarming: differentieel 100 mA",[86,3161,3162],{},"In wanden ingebouwde verwarmingsweerstanden boven 25 V AC vragen een afzonderlijke differentieelschakelaar van 100 mA.",[86,3164,108],{},[86,3166,3043],{},[65,3168,3169,3172,3175,3177],{},[86,3170,3171],{},"Poolconfiguratie van huishoudelijke installatie",[86,3173,3174],{},"Eenpolige automaten zijn in Belgische woningen met sterschakeling niet toegelaten; gebruik 1P+N.",[86,3176,236],{},[86,3178,3093],{},[65,3180,3181,3184,3187,3189],{},[86,3182,3183],{},"Uitschakelkarakteristiek tegenover belastingstype",[86,3185,3186],{},"Praktijkadvies: de karakteristiek B, C of D van de automaat moet passen bij het type belasting.",[86,3188,3066],{},[86,3190,3093],{},[65,3192,3193,3196,3199,3201],{},[86,3194,3195],{},"Back-upbeveiliging van voedingsleidingen tussen verdeelborden",[86,3197,3198],{},"Een voedingsleiding naar een onderverdeler vraagt een eigen beveiliging in de voedende kast en een consistente koppeling.",[86,3200,261],{},[86,3202,3043],{},[65,3204,3205,3208,3211,3213],{},[86,3206,3207],{},"Uitschakelvermogen tegenover kortsluitstroom",[86,3209,3210],{},"Het uitschakelvermogen van elke automaat moet de verwachte kortsluitstroom aankunnen; enkel gecontroleerd bij ingevulde waarde.",[86,3212,274],{},[86,3214,3043],{},[54,3216,3218],{"id":3217},"aarding","Aarding",[59,3220,3221,3233],{},[62,3222,3223],{},[65,3224,3225,3227,3229,3231],{},[68,3226,3020],{},[68,3228,3023],{},[68,3230,76],{},[68,3232,3028],{},[81,3234,3235,3247,3259],{},[65,3236,3237,3240,3243,3245],{},[86,3238,3239],{},"Hoofdequipotentiale verbinding",[86,3241,3242],{},"Er moet een hoofdequipotentiaalverbinding (aardingsrail) aanwezig zijn.",[86,3244,307],{},[86,3246,3043],{},[65,3248,3249,3252,3255,3257],{},[86,3250,3251],{},"Aardingselektrode (aardingslus\u002Faardpen)",[86,3253,3254],{},"Bij een TT- of IT-net moet een aardingselektrode gedocumenteerd zijn.",[86,3256,320],{},[86,3258,3043],{},[65,3260,3261,3264,3267,3269],{},[86,3262,3263],{},"Plausibiliteit van aarding en netaansluiting",[86,3265,3266],{},"Plausibiliteitscontrole: een openbare huishoudelijke 3×230 V-aansluiting met een opgeslagen TN-stelsel vraagt nazicht.",[86,3268,3066],{},[86,3270,3093],{},[54,3272,3274],{"id":3273},"kabels-en-dimensionering","Kabels en dimensionering",[59,3276,3277,3289],{},[62,3278,3279],{},[65,3280,3281,3283,3285,3287],{},[68,3282,3020],{},[68,3284,3023],{},[68,3286,76],{},[68,3288,3028],{},[81,3290,3291,3303,3315,3327],{},[65,3292,3293,3296,3299,3301],{},[86,3294,3295],{},"Kabeldoorsnede",[86,3297,3298],{},"De kabeldoorsnede moet passen bij de nominale stroom van de beveiliging.",[86,3300,365],{},[86,3302,3043],{},[65,3304,3305,3308,3311,3313],{},[86,3306,3307],{},"Spanningsval (ΔU)",[86,3309,3310],{},"Spanningsval berekend uit kabellengte: richtwaarde 3 % voor verlichting en 5 % voor andere eindstroomkringen.",[86,3312,378],{},[86,3314,3043],{},[65,3316,3317,3320,3323,3325],{},[86,3318,3319],{},"CPR-brandklasse van kabels",[86,3321,3322],{},"Afzonderlijk geplaatste kabels moeten de eigenschap F1 hebben of minstens CPR-klasse Eca halen; klasse Fca is niet toegestaan.",[86,3324,391],{},[86,3326,3043],{},[65,3328,3329,3332,3335,3337],{},[86,3330,3331],{},"Bekabeling in holle wanden: Cca\u002FPreflex",[86,3333,3334],{},"Kabels in bouwkundige holle ruimtes lopen in een mantelbuis (Preflex) of halen minstens CPR-klasse Cca.",[86,3336,404],{},[86,3338,3043],{},[54,3340,3342],{"id":3341},"belasting-van-stroomkringen","Belasting van stroomkringen",[59,3344,3345,3357],{},[62,3346,3347],{},[65,3348,3349,3351,3353,3355],{},[68,3350,3020],{},[68,3352,3023],{},[68,3354,76],{},[68,3356,3028],{},[81,3358,3359,3371],{},[65,3360,3361,3364,3367,3369],{},[86,3362,3363],{},"Max. contactpunten per eindstroomkring",[86,3365,3366],{},"Hoogstens 8 stopcontacten en vaste toestellen per eindstroomkring; zuivere lichtpunten tellen niet mee.",[86,3368,437],{},[86,3370,3043],{},[65,3372,3373,3376,3379,3381],{},[86,3374,3375],{},"Faseonbalans",[86,3377,3378],{},"Praktijkadvies: de onbalans tussen de fasen blijft best onder 30 %.",[86,3380,3066],{},[86,3382,3093],{},[54,3384,3386],{"id":3385},"ruimtes-en-zones","Ruimtes en zones",[59,3388,3389,3401],{},[62,3390,3391],{},[65,3392,3393,3395,3397,3399],{},[68,3394,3020],{},[68,3396,3023],{},[68,3398,76],{},[68,3400,3028],{},[81,3402,3403,3415,3427,3439],{},[65,3404,3405,3408,3411,3413],{},[86,3406,3407],{},"30mA-beveiliging voor vochtige ruimten",[86,3409,3410],{},"Stopcontacten in vochtige ruimtes moeten door een differentieelschakelaar van 30 mA beschermd zijn.",[86,3412,482],{},[86,3414,3043],{},[65,3416,3417,3420,3423,3425],{},[86,3418,3419],{},"30mA-differentieel voor badkamerkringen",[86,3421,3422],{},"Alle stroomkringen in badkamers en vochtige ruimtes moeten door een differentieelschakelaar van 30 mA beschermd zijn.",[86,3424,495],{},[86,3426,3043],{},[65,3428,3429,3432,3435,3437],{},[86,3430,3431],{},"Badkamerzones 0\u002F1\u002F2: toegelaten materieel",[86,3433,3434],{},"In badkamervolumes 0, 1 en 2 is enkel bepaald materieel toegelaten; verdeelkasten zijn er verboden.",[86,3436,508],{},[86,3438,3043],{},[65,3440,3441,3444,3447,3449],{},[86,3442,3443],{},"Rookmelderdekking (aanbeveling)",[86,3445,3446],{},"Niet-bindend advies op basis van de gewestelijke woningregels; het AREI zelf schrijft rookmelders voor woningen niet voor.",[86,3448,3066],{},[86,3450,3093],{},[54,3452,3454],{"id":3453},"topologie-en-besturing","Topologie en besturing",[59,3456,3457,3469],{},[62,3458,3459],{},[65,3460,3461,3463,3465,3467],{},[68,3462,3020],{},[68,3464,3023],{},[68,3466,76],{},[68,3468,3028],{},[81,3470,3471],{},[65,3472,3473,3476,3479,3481],{},[86,3474,3475],{},"Stuurwegen van elektrische rolluiken",[86,3477,3478],{},"Plausibiliteitscontrole: directe schakelaars, actoringangen, centrale bedieningen en aandrijvingstypes vormen samen een samenhangend besturingstraject.",[86,3480,3066],{},[86,3482,3043],{},[54,3484,3486],{"id":3485},"fotovoltaïsche-installatie","Fotovoltaïsche installatie",[59,3488,3489,3501],{},[62,3490,3491],{},[65,3492,3493,3495,3497,3499],{},[68,3494,3020],{},[68,3496,3023],{},[68,3498,76],{},[68,3500,3028],{},[81,3502,3503,3515],{},[65,3504,3505,3508,3511,3513],{},[86,3506,3507],{},"Conformiteit van PV-installatie",[86,3509,3510],{},"PV-installatie: anti-eilandbedrijf, aarding van de modulekaders, waarschuwingsborden en kenmerking van DC- en AC-geleiders.",[86,3512,585],{},[86,3514,3043],{},[65,3516,3517,3520,3523,3525],{},[86,3518,3519],{},"Somstroom in verdeelborden met meerdere voedingsbronnen",[86,3521,3522],{},"Bij een verdeelkast met eigen opwekking worden net- en bronstroom per fase opgeteld op gemeenschappelijk belaste secties.",[86,3524,3066],{},[86,3526,3043],{},[54,3528,3530],{"id":3529},"volledigheid-van-het-dossier","Volledigheid van het dossier",[59,3532,3533,3545],{},[62,3534,3535],{},[65,3536,3537,3539,3541,3543],{},[68,3538,3020],{},[68,3540,3023],{},[68,3542,76],{},[68,3544,3028],{},[81,3546,3547,3559,3571,3583,3595,3607,3619],{},[65,3548,3549,3552,3555,3557],{},[86,3550,3551],{},"Volledige verbindingen",[86,3553,3554],{},"Elk element in het schema moet aangesloten zijn; losse knooppunten wijzen op een onvolledig model.",[86,3556,3066],{},[86,3558,3093],{},[65,3560,3561,3564,3567,3569],{},[86,3562,3563],{},"Min. aantal verlichtingskringen",[86,3565,3566],{},"Praktijkadvies: minstens twee verlichtingsstroomkringen per wooneenheid.",[86,3568,642],{},[86,3570,3043],{},[65,3572,3573,3576,3579,3581],{},[86,3574,3575],{},"Afzonderlijke stroomkringen voor grootverbruikers",[86,3577,3578],{},"Grote toestellen zoals wasmachine, droogkast, vaatwasser, kookplaat en oven vragen elk een eigen stroomkring.",[86,3580,655],{},[86,3582,3043],{},[65,3584,3585,3588,3591,3593],{},[86,3586,3587],{},"Installatiedossier (AREI 9.1.2)",[86,3589,3590],{},"Het installatiedossier vraagt een eendraadschema, een situatieplan en een volledige cartouche; PV vraagt bijkomende documenten.",[86,3592,3066],{},[86,3594,3093],{},[65,3596,3597,3600,3603,3605],{},[86,3598,3599],{},"Plaatsing van verbindings-\u002Faftakdozen",[86,3601,3602],{},"Structurele aftakdozen moeten precies één keer en consistent in het schema voorkomen.",[86,3604,680],{},[86,3606,3093],{},[65,3608,3609,3612,3615,3617],{},[86,3610,3611],{},"Niet-gekoppelde elektrische grondplansymbolen",[86,3613,3614],{},"Toestellen op het grondplan zonder koppeling aan de elektrische topologie worden als informatie gemeld.",[86,3616,3066],{},[86,3618,3118],{},[65,3620,3621,3624,3627,3629],{},[86,3622,3623],{},"Plausibiliteit van schakelgroepen",[86,3625,3626],{},"Plausibiliteitscontrole: een schakelgroep bevat minstens één schakelaar en minstens één geschakelde belasting.",[86,3628,3066],{},[86,3630,3093],{},[31,3632,3634],{"id":3633},"wat-de-zelfcontrole-niet-beoordeelt","Wat de zelfcontrole niet beoordeelt",[10,3636,3637],{},"Deze onderdelen van Boek 1 blijven bewust buiten de automatische toetsing:",[10,3639,3640,3643],{},[20,3641,3642],{},"Bijzondere installaties en ruimtes (Deel 7)."," Van de veertien hoofdstukken raakt PlanElec er drie, en die telkens gedeeltelijk: ruimtes met bad of douche (7.1), voeding van elektrische wegvoertuigen (7.22) en huishoudelijke fotovoltaïsche installaties (7.112). Niet gedekt zijn zwembaden (7.2), sauna's (7.3), werf- en buiteninstallaties (7.4), enge geleidende ruimtes (7.6), campings (7.8), jachthavens (7.9), foorinstallaties (7.11), fonteinen (7.100), stationerende voertuigen (7.101), explosieve atmosferen (7.102) en industriële accumulatorbatterijen (7.103).",[10,3645,3646,3649],{},[20,3647,3648],{},"De gelijkstroomzijde."," Het model kent geen afzonderlijke rollen voor de geleiders L+, L-, M, PEM en PEL. Daardoor zijn geleiderkeuze, kleurstelling, gecombineerde beschermingsgeleiders, DC-differentieelgevoeligheid, de bescherming van de M-geleider en permanente isolatiebewaking bij een IT-stelsel niet toetsbaar. Voor PV blijft dat handwerk.",[10,3651,3652,3655],{},[20,3653,3654],{},"De overgangsbepalingen van artikel 59 en 69."," Of een uitzondering voor een bestaande installatie geldt, hangt af van gegevens die niet uit een eendraadschema af te leiden zijn — onder meer de PEN-doorsnede, het werkelijke begin van de uitvoering ter plaatse en de aanwezigheid van een bewakingstoestel. PlanElec houdt wel rekening met de versoepelingen van Deel 8 door bepaalde bevindingen bij bestaande delen als aanwijzing te tonen in plaats van als fout, maar beslist de uitzondering niet zelf.",[10,3657,3658,3661],{},[20,3659,3660],{},"Controles van installaties (Deel 6) en de gedragsvoorschriften (Deel 9)"," vallen buiten het bereik van een planningsinstrument. Enkel de samenstelling van het installatiedossier wordt getoetst.",[31,3663,3665],{"id":3664},"wat-software-principieel-niet-kan-vaststellen","Wat software principieel niet kan vaststellen",[10,3667,3668],{},"Ook na verdere uitbreiding van het model blijven deze punten afhankelijk van meting, inzage of visuele controle ter plaatse:",[746,3670,3671,3674,3677,3680,3683,3686,3689],{},[749,3672,3673],{},"de werkelijke bedrading, de doorverbinding en de polariteit van de geleiders;",[749,3675,3676],{},"de uitschakelkarakteristieken en de DC-geschiktheid van de effectief geplaatste toestellen;",[749,3678,3679],{},"de isolatiemeting en de werking van een permanent isolatiebewakingstoestel;",[749,3681,3682],{},"de mechanische en chemische weerstand en de corrosietoestand van de aarding;",[749,3684,3685],{},"de doeltreffendheid van de automatische uitschakeling en de reële aardingsimpedantie;",[749,3687,3688],{},"de geschiktheid en de certificering van omvormers, batterijen en PV-componenten;",[749,3690,3691],{},"de zone-indeling, de risicobeoordeling en de omstandigheden ter plaatse.",[31,3693,3695],{"id":3694},"wat-dit-betekent-voor-uw-keuring","Wat dit betekent voor uw keuring",[10,3697,3698],{},"Gebruik de zelfcontrole om vermijdbare fouten vroeg te vinden: een ontbrekende differentieelschakelaar, een doorsnede die niet bij de beveiliging past, te veel contactpunten op één kring, een onvolledig dossier. Dat zijn precies de bevindingen die anders pas bij de keuring boven water komen.",[10,3700,3701],{},"Reken er niet op voor de gevallen hierboven. Daar blijven uw vakkennis en het oordeel van het controleorganisme doorslaggevend.",{"title":781,"searchDepth":782,"depth":782,"links":3703},[3704,3714,3715,3716],{"id":2990,"depth":782,"text":2991,"children":3705},[3706,3707,3708,3709,3710,3711,3712,3713],{"id":3010,"depth":787,"text":3011},{"id":3217,"depth":787,"text":3218},{"id":3273,"depth":787,"text":3274},{"id":3341,"depth":787,"text":3342},{"id":3385,"depth":787,"text":3386},{"id":3453,"depth":787,"text":3454},{"id":3485,"depth":787,"text":3486},{"id":3529,"depth":787,"text":3530},{"id":3633,"depth":782,"text":3634},{"id":3664,"depth":782,"text":3665},{"id":3694,"depth":782,"text":3695},"De volledige lijst van de regels die PlanElec automatisch toetst — en een even expliciete lijst van wat de zelfcontrole niet beoordeelt.","nl",{},"\u002Fhelp\u002Fself-check-coverage.nl",{"title":2967,"description":3717},"wat-controleert-de-zelfcontrole","help\u002Fself-check-coverage.nl",[813,814,3725,3726,3727,3728],"zelfcontrole","keuring","dekking","validatie","PPdQf7GxXuI0xR6wwPeagOSzHElAo3urnvqpxvqGAPc",[3731,4002,4264,4577,5192,5377,5537],{"id":3732,"title":3733,"body":3734,"category":3986,"description":3987,"extension":800,"guideId":3988,"locale":802,"meta":3989,"navigation":804,"order":3990,"path":3991,"publishedAt":3992,"readTime":3993,"seo":3994,"slug":3988,"stem":3995,"tags":3996,"updatedAt":3992,"__hash__":4001},"help\u002Fhelp\u002Fgetting-started.en.md","Getting started: from project to first export",{"type":7,"value":3735,"toc":3977},[3736,3739,3744,3750,3754,3761,3764,3781,3784,3792,3796,3807,3810,3813,3816,3831,3836,3840,3843,3846,3849,3857,3865,3869,3872,3875,3892,3895,3900,3904,3907,3910,3913,3921,3925,3932,3935,3943,3947,3950,3970],[10,3737,3738],{},"PlanElec uses one project model for the floor plan, electrical topology, distribution board, and documents. A fixed order therefore works best: capture the spaces and devices first, review the electrical structure next, and export only after that.",[25,3740,3741],{},[10,3742,3743],{},"Using PlanElec as an owner or self-builder? Have all decisions and documents reviewed by a qualified electrician before installation and inspection.",[10,3745,3746],{},[3747,3748],"a",{"id":3749},"project",[31,3751,3753],{"id":3752},"_1-create-the-project","1. Create the project",[10,3755,3756,3757,3760],{},"Choose ",[20,3758,3759],{},"Create project"," in the project overview. You can start with the guided workflow, a localized project template, or an empty project.",[10,3762,3763],{},"Enter at least a recognizable project name. You can add these project details later:",[746,3765,3766,3769,3772,3775,3778],{},[749,3767,3768],{},"customer and contact details;",[749,3770,3771],{},"installation address;",[749,3773,3774],{},"installer and optional logo;",[749,3776,3777],{},"EAN, installation type, and current type;",[749,3779,3780],{},"recognized inspection body and project notes.",[10,3782,3783],{},"PlanElec reuses these details in title blocks, the self-check report, and the working dossier. Missing details do not prevent you from trying the workflow or downloading drafts, but review them before sharing documents.",[10,3785,3786,3789],{},[3747,3787],{"id":3788},"floorplan",[3747,3790],{"id":3791},"situation-plan",[31,3793,3795],{"id":3794},"_2-draw-the-floor-plan-and-build-the-situation-plan","2. Draw the floor plan and build the situation plan",[10,3797,3798,3799,3802,3803,3806],{},"Create a floor first. Then draw the exterior and interior walls with the polygon, rectangle, or line tool. Closed wall areas are detected as rooms; give each room a clear name, such as ",[20,3800,3801],{},"Kitchen"," or ",[20,3804,3805],{},"Bedroom 1",".",[10,3808,3809],{},"If you already have a plan image, use it as a reference. Calibrate it with a known measurement before placing things precisely. The image is an underlay: walls, openings, and electrical points remain separate project data.",[10,3811,3812],{},"Next, place doors, windows, stairs, and electrical symbols in their real locations. This floor plan becomes the basis for the situation plan PDF.",[10,3814,3815],{},"Practical check:",[3817,3818,3819,3822,3825,3828],"ol",{},[749,3820,3821],{},"Are all floors and rooms present and named?",[749,3823,3824],{},"Are sockets, switches, lighting points, and fixed appliances in the right room?",[749,3826,3827],{},"Is the distribution board positioned on the plan?",[749,3829,3830],{},"Are bathroom zones and special appliances recorded correctly where relevant?",[10,3832,3833],{},[3747,3834],{"id":3835},"devices",[31,3837,3839],{"id":3838},"_3-place-and-connect-electrical-devices","3. Place and connect electrical devices",[10,3841,3842],{},"Open the symbol palette and place the electrical points you need. Helpers can propose sockets, lighting, standard equipment, or a spotlight grid. Review and edit those proposals: they do not decide the required quantities or final positions for you.",[10,3844,3845],{},"Connect switches and lights in switch chains. PlanElec can propose a chain for unassigned switches and lights in the same room; you can still edit the sequence manually.",[10,3847,3848],{},"A floor-plan symbol and an electrical node belong together, but they are not the same object. Review the unconnected-components panel. Without valid topology, a device cannot reliably appear in a circuit, cable, or material list.",[10,3850,3851,3852,3856],{},"Read ",[3747,3853,3855],{"href":3854},"\u002Fen\u002Fhelp\u002Fautomatic-planning","Using automatic planning"," for details about proposals, cables, and circuits.",[10,3858,3859,3862],{},[3747,3860],{"id":3861},"automatic-planning",[3747,3863],{"id":3864},"cabinet",[31,3866,3868],{"id":3867},"_4-review-the-electrical-topology-and-distribution-board","4. Review the electrical topology and distribution board",[10,3870,3871],{},"Use automatic circuit assignment as a starting proposal. PlanElec groups standard devices, creates dedicated protection for special appliances where required, and can distribute loads across phases. Review the preview before applying the assignment.",[10,3873,3874],{},"Then open the distribution board editor. Auto-fill places existing main switches, RCDs, and circuit breakers on DIN rails while reserving spare capacity. Review:",[746,3876,3877,3880,3883,3886,3889],{},[749,3878,3879],{},"the protection chain and assigned devices;",[749,3881,3882],{},"cable type, cross-section, and route;",[749,3884,3885],{},"RCD groups and circuit counts;",[749,3887,3888],{},"phase allocation for a multiphase installation;",[749,3890,3891],{},"spare module positions and the actual board dimensions.",[10,3893,3894],{},"Every automatic result remains editable. A proposal is not an engineering decision or a material order.",[10,3896,3897],{},[3747,3898],{"id":3899},"schema",[31,3901,3903],{"id":3902},"_5-review-the-single-line-diagram-and-self-check","5. Review the single-line diagram and self-check",[10,3905,3906],{},"The single-line diagram is generated from the same electrical topology. Check circuit names, protection devices, cable data, connections, and symbols. Resolve the errors and warnings PlanElec can identify from the available project data.",[10,3908,3909],{},"The AREI\u002FRGIE self-check covers a documented subset of rules that software can evaluate from that data. A clean run only means that no error was found within those supported rules. Measurements, on-site conditions, and rules that are not modeled remain outside its scope.",[10,3911,3912],{},"PlanElec therefore does not issue a certificate of conformity and does not replace an official inspection by a recognized inspection body.",[10,3914,3915,3918],{},[3747,3916],{"id":3917},"export",[3747,3919],{"id":3920},"exports",[31,3922,3924],{"id":3923},"_6-export-and-review-the-documents","6. Export and review the documents",[10,3926,3927,3928,3931],{},"In ",[20,3929,3930],{},"Export",", you can generate the single-line diagram and situation plan as PDFs. The self-check report and circuit, cable, and material lists are also available centrally; the detailed lists are still part of the pilot workflow.",[10,3933,3934],{},"You can combine selected documents into a working dossier with a cover, document index, and continuous page numbering. Review every page and the project metadata before sharing it.",[10,3936,3937,3938,3942],{},"See ",[3747,3939,3941],{"href":3940},"\u002Fen\u002Fhelp\u002Fexport-documents","Exporting documents"," for the full list, statuses, and limitations.",[31,3944,3946],{"id":3945},"a-useful-first-milestone","A useful first milestone",[10,3948,3949],{},"Your first project is well structured when:",[746,3951,3952,3955,3958,3961,3964,3967],{},[749,3953,3954],{},"rooms and electrical points are shown on the situation plan;",[749,3956,3957],{},"all relevant points are linked to the electrical topology;",[749,3959,3960],{},"circuits, cables, and board layout have been reviewed;",[749,3962,3963],{},"the single-line diagram is readable;",[749,3965,3966],{},"the self-check has run and you understand the remaining findings;",[749,3968,3969],{},"exported documents have been checked visually and technically.",[10,3971,3972,3973,3806],{},"Ready to begin? ",[3747,3974,3976],{"href":3975},"\u002Fauth\u002Fregister","Create a free Early Access account",{"title":781,"searchDepth":782,"depth":782,"links":3978},[3979,3980,3981,3982,3983,3984,3985],{"id":3752,"depth":782,"text":3753},{"id":3794,"depth":782,"text":3795},{"id":3838,"depth":782,"text":3839},{"id":3867,"depth":782,"text":3868},{"id":3902,"depth":782,"text":3903},{"id":3923,"depth":782,"text":3924},{"id":3945,"depth":782,"text":3946},"getting_started","Build a PlanElec project step by step: project details, floor plan, rooms, electrical devices, distribution board, diagram, and export.","getting-started",{},1,"\u002Fhelp\u002Fgetting-started.en","2026-07-20","8 min",{"title":3733,"description":3987},"help\u002Fgetting-started.en",[3749,3997,3998,3835,3999,4000,3917],"floor plan","situation plan","distribution board","single-line diagram","4QU3O3MSTvyRpliaQ8YJOlnqhC6fji2K_ya07xrUuFk",{"id":4003,"title":4004,"body":4005,"category":4251,"description":4252,"extension":800,"guideId":3861,"locale":802,"meta":4253,"navigation":804,"order":782,"path":4254,"publishedAt":3992,"readTime":4255,"seo":4256,"slug":3861,"stem":4257,"tags":4258,"updatedAt":3992,"__hash__":4263},"help\u002Fhelp\u002Fautomatic-planning.en.md","Using and reviewing automatic planning",{"type":7,"value":4006,"toc":4241},[4007,4010,4016,4025,4029,4032,4035,4052,4055,4059,4062,4065,4070,4074,4077,4080,4083,4097,4100,4105,4109,4112,4132,4135,4140,4144,4147,4150,4154,4158,4161,4164,4178,4181,4188,4192,4195,4233,4236],[10,4008,4009],{},"PlanElec's automatic functions create editable proposals. They reduce repetitive work, but they cannot know which equipment will actually be installed, how a cable will run on site, or which product specifications your electrician will select.",[10,4011,4012,4013,3806],{},"Use the same pattern each time: ",[20,4014,4015],{},"create proposal → review preview → apply → check technically",[10,4017,4018,4020,4023],{},[3747,4019],{"id":3861},[3747,4021],{"id":4022},"consumers",[3747,4024],{"id":3835},[31,4026,4028],{"id":4027},"propose-devices-and-lighting-points","Propose devices and lighting points",[10,4030,4031],{},"The floor-plan editor includes helpers for automatic sockets, lighting, standard equipment, and spotlight grids. The proposals use the drawn rooms and geometry as their basis.",[10,4033,4034],{},"For a useful result:",[3817,4036,4037,4040,4043,4046,4049],{},[749,4038,4039],{},"draw closed, correctly named rooms;",[749,4041,4042],{},"set the required count or pattern where applicable;",[749,4044,4045],{},"inspect the proposed positions;",[749,4047,4048],{},"move, add, or remove points to match the real design;",[749,4050,4051],{},"review special zones and fixed appliances separately.",[10,4053,4054],{},"PlanElec does not silently add every missing appliance. You remain responsible for the design brief and final placement.",[54,4056,4058],{"id":4057},"build-switch-chains-automatically","Build switch chains automatically",[10,4060,4061],{},"PlanElec can propose a switch chain for unassigned switches and lighting points in the same room. It normally starts with the free switch closest to a door and then connects nearby free points.",[10,4063,4064],{},"Always verify which switch controls which light. Edit the sequence manually when the real control logic differs.",[10,4066,4067],{},[3747,4068],{"id":4069},"cables",[31,4071,4073],{"id":4072},"generate-cable-specifications-and-routes","Generate cable specifications and routes",[10,4075,4076],{},"Once the electrical topology exists, PlanElec can create a cable segment for each parent-to-child connection. A real connection or junction box splits the connection into separate segments. A box that is only nearby is not silently inserted into the electrical path.",[10,4078,4079],{},"Automatic routing searches for a short route along the drawn walls on each floor. If the start and end are not connected through the same wall component, the router uses a direct fallback.",[10,4081,4082],{},"After routing:",[746,4084,4085,4088,4091,4094],{},[749,4086,4087],{},"check whether the route matches the intended installation;",[749,4089,4090],{},"add or move waypoints where required;",[749,4092,4093],{},"review cable type, cross-section, and installation method;",[749,4095,4096],{},"enter a manual length when the calculated route does not represent reality closely enough.",[10,4098,4099],{},"The resulting length feeds the material list, voltage-drop calculation, and validation. It is a net length without an automatic waste or reserve factor.",[10,4101,4102],{},[3747,4103],{"id":4104},"circuits",[31,4106,4108],{"id":4107},"assign-devices-to-circuits-automatically","Assign devices to circuits automatically",[10,4110,4111],{},"Automatic circuit assignment creates a proposal from the recorded devices and product rules. It supports decisions such as:",[746,4113,4114,4117,4120,4123,4126,4129],{},[749,4115,4116],{},"grouping standard lighting and socket points by room;",[749,4118,4119],{},"allowing no more than eight connection points on a standard circuit;",[749,4121,4122],{},"creating dedicated breakers for appliances including hobs, ovens, washing machines, tumble dryers, dishwashers, boilers, heat pumps, and saunas;",[749,4124,4125],{},"placing standard groups behind 30 mA RCDs;",[749,4127,4128],{},"assigning an EV charger a separate 30 mA RCD and three-phase breaker; with documented built-in 6 mA DC detection PlanElec proposes external Type A, otherwise Type B;",[749,4130,4131],{},"distributing assignments across boards in a multi-board project.",[10,4133,4134],{},"Review the preview before confirming it. Pay particular attention to mixed circuits, special appliances, existing manual assignments, and whether the defaults suit the actual project.",[10,4136,4137],{},[3747,4138],{"id":4139},"phases",[31,4141,4143],{"id":4142},"balance-loads-across-phases","Balance loads across phases",[10,4145,4146],{},"For a three-phase or delta supply, PlanElec can distribute loads across L1, L2, and L3. The phase overview shows the calculated load on each phase and warns about a clear imbalance.",[10,4148,4149],{},"This remains a model calculation based on the entered loads. Real simultaneity, measurements, and network conditions require assessment outside the software.",[10,4151,4152],{},[3747,4153],{"id":3864},[31,4155,4157],{"id":4156},"fill-the-distribution-board-automatically","Fill the distribution board automatically",[10,4159,4160],{},"Auto-fill places existing main switches, RCDs, and MCBs in free DIN-rail slots. Its default sequence is main RCD, group RCDs, and then circuit breakers. By default, it reserves about twenty percent of the rail capacity.",[10,4162,4163],{},"The distinction from circuit assignment matters:",[746,4165,4166,4172],{},[749,4167,4168,4171],{},[20,4169,4170],{},"Circuit assignment"," creates and connects the electrical protection structure.",[749,4173,4174,4177],{},[20,4175,4176],{},"Auto-fill"," arranges those existing modules physically in the board.",[10,4179,4180],{},"After auto-fill, review the board size, TE widths, spare capacity, protection chains, and connection paths. Explicit paths through connection boxes are preserved when the board is filled again.",[10,4182,4183,4185],{},[3747,4184],{"id":3899},[3747,4186],{"id":4187},"review",[31,4189,4191],{"id":4190},"final-review-of-an-automatic-proposal","Final review of an automatic proposal",[10,4193,4194],{},"After every automatic action, check:",[3817,4196,4197,4203,4209,4215,4221,4227],{},[749,4198,4199,4202],{},[20,4200,4201],{},"Completeness:"," are all real devices, boxes, and boards modeled?",[749,4204,4205,4208],{},[20,4206,4207],{},"Topology:"," is each parent-to-child connection correct, with nothing left unconnected?",[749,4210,4211,4214],{},[20,4212,4213],{},"Protection:"," do the RCD, MCB, pole configuration, and cable suit the application?",[749,4216,4217,4220],{},[20,4218,4219],{},"Space:"," are routes and positions practical on site?",[749,4222,4223,4226],{},[20,4224,4225],{},"Phases:"," is the allocation plausible for the entered loads?",[749,4228,4229,4232],{},[20,4230,4231],{},"Documents:"," do the situation plan and single-line diagram remain readable?",[10,4234,4235],{},"The AREI\u002FRGIE self-check helps with supported rules that can be evaluated from project data. It is not a declaration of conformity and does not replace an electrician's review or the official inspection.",[10,4237,4238,4239,3806],{},"Continue with ",[3747,4240,3941],{"href":3940},{"title":781,"searchDepth":782,"depth":782,"links":4242},[4243,4246,4247,4248,4249,4250],{"id":4027,"depth":782,"text":4028,"children":4244},[4245],{"id":4057,"depth":787,"text":4058},{"id":4072,"depth":782,"text":4073},{"id":4107,"depth":782,"text":4108},{"id":4142,"depth":782,"text":4143},{"id":4156,"depth":782,"text":4157},{"id":4190,"depth":782,"text":4191},"automation","Use PlanElec proposals for devices, switch chains, cable routes, circuits, phases, and the distribution board without skipping technical review.",{},"\u002Fhelp\u002Fautomatic-planning.en","9 min",{"title":4004,"description":4252},"help\u002Fautomatic-planning.en",[4259,3835,4260,4104,4261,3999,4262],"automatic planning","cable routing","phase balancing","DIN rail","7yt5Knr-FF0dZBiDuy63A8c0lrtH88lw0Y0tjv_HWaI",{"id":4265,"title":4266,"body":4267,"category":3920,"description":4564,"extension":800,"guideId":4565,"locale":802,"meta":4566,"navigation":804,"order":787,"path":4567,"publishedAt":3992,"readTime":3993,"seo":4568,"slug":4569,"stem":4570,"tags":4571,"updatedAt":3992,"__hash__":4576},"help\u002Fhelp\u002Fdocument-exports.en.md","Exporting documents and assembling a working dossier",{"type":7,"value":4268,"toc":4553},[4269,4272,4276,4280,4362,4369,4372,4375,4378,4395,4399,4402,4405,4408,4412,4415,4418,4421,4435,4438,4441,4461,4464,4471,4474,4482,4487,4491,4494,4497,4502,4506,4509,4532,4535,4539,4542],[10,4270,4271],{},"The export workspace brings together documents from the same project model. You can download documents separately or combine selected parts into one working dossier.",[10,4273,4274],{},[3747,4275],{"id":3920},[31,4277,4279],{"id":4278},"status-at-a-glance","Status at a glance",[59,4281,4282,4295],{},[62,4283,4284],{},[65,4285,4286,4289,4292],{},[68,4287,4288],{},"Document",[68,4290,4291],{},"Current status",[68,4293,4294],{},"What to know",[81,4296,4297,4308,4318,4329,4340,4351],{},[65,4298,4299,4302,4305],{},[86,4300,4301],{},"Single-line diagram PDF",[86,4303,4304],{},"Available",[86,4306,4307],{},"Can span several pages; review scale, symbols, and title block.",[65,4309,4310,4313,4315],{},[86,4311,4312],{},"Situation plan PDF",[86,4314,4304],{},[86,4316,4317],{},"Based on the drawn floor plan and placed symbols.",[65,4319,4320,4323,4326],{},[86,4321,4322],{},"AREI\u002FRGIE self-check report",[86,4324,4325],{},"Available, advisory",[86,4327,4328],{},"Not a certificate of conformity or a replacement for the official inspection.",[65,4330,4331,4334,4337],{},[86,4332,4333],{},"Circuit, cable, and material lists",[86,4335,4336],{},"Pilot workflow",[86,4338,4339],{},"Model-based, manufacturer-neutral lists; not approved for ordering.",[65,4341,4342,4345,4348],{},[86,4343,4344],{},"Distribution board PDF",[86,4346,4347],{},"Feature flag",[86,4349,4350],{},"Shown only when enabled and board data is present.",[65,4352,4353,4356,4359],{},[86,4354,4355],{},"Combined installation dossier",[86,4357,4358],{},"Pilot\u002Fworking state",[86,4360,4361],{},"Local assembly; a versioned final server snapshot and formal acceptance remain open.",[10,4363,4364,4366],{},[3747,4365],{"id":3899},[3747,4367],{"id":4368},"single-line",[31,4370,4301],{"id":4371},"single-line-diagram-pdf",[10,4373,4374],{},"The single-line diagram uses the electrical topology, protection devices, circuits, cable data, and consumers. Larger installations are divided across several pages.",[10,4376,4377],{},"Before downloading, check:",[746,4379,4380,4383,4386,4389,4392],{},[749,4381,4382],{},"that every consumer path reaches the correct breaker and RCD;",[749,4384,4385],{},"that cable type, cross-section, and labels are present;",[749,4387,4388],{},"that spare modules do not appear as active circuits;",[749,4390,4391],{},"that the project and installer details in the title block are correct;",[749,4393,4394],{},"that no content is clipped at a page edge.",[10,4396,4397],{},[3747,4398],{"id":3791},[31,4400,4312],{"id":4401},"situation-plan-pdf",[10,4403,4404],{},"The situation plan shows the drawn rooms, openings, and electrical symbols in their locations. Review every floor separately and check for overlapping labels, missing devices, and legibility at the selected A4 or A3 format.",[10,4406,4407],{},"The situation plan and single-line diagram share project notes and other title-block details. Correct those details in the project instead of editing an individual PDF.",[10,4409,4410],{},[3747,4411],{"id":815},[31,4413,4322],{"id":4414},"areirgie-self-check-report",[10,4416,4417],{},"The report summarizes findings that PlanElec can evaluate from the entered data and supported rules. It also states when a check has not started, is incomplete, or falls outside the current coverage.",[10,4419,4420],{},"A report with no detected error does not mean the installation complies with AREI\u002FRGIE. Measurements, evidence, on-site conditions, and rules that are not modeled remain outside a software check. Only a recognized inspection body performs the official inspection.",[10,4422,4423,4426,4429,4432],{},[3747,4424],{"id":4425},"lists",[3747,4427],{"id":4428},"circuit-list",[3747,4430],{"id":4431},"cable-list",[3747,4433],{"id":4434},"material-list",[31,4436,4333],{"id":4437},"circuit-cable-and-material-lists",[10,4439,4440],{},"These lists are available in the central pilot workflow:",[746,4442,4443,4449,4455],{},[749,4444,4445,4448],{},[20,4446,4447],{},"Circuit list:"," overview of modeled circuits and protection devices.",[749,4450,4451,4454],{},[20,4452,4453],{},"Cable list:"," cable segments with specifications and calculated or manual length.",[749,4456,4457,4460],{},[20,4458,4459],{},"Material list:"," manufacturer-neutral quantities for wiring accessories, connections, protection, board, accessories, and net cable lengths.",[10,4462,4463],{},"The material list can be viewed by category or room and exposes its default assumptions. It includes no prices or specific manufacturer products. Net cable lengths have no automatic waste or reserve factor. Use it as a review and quotation starting point, not as a purchase order.",[10,4465,4466,4468],{},[3747,4467],{"id":3864},[3747,4469],{"id":4470},"cabinet-pdf",[31,4472,4344],{"id":4473},"distribution-board-pdf",[10,4475,4476,4477,4481],{},"The PDF view of the distribution board is only available when the ",[4478,4479,4480],"code",{},"cabinet_export"," feature flag is active and the project contains board data. If the option is absent, that is not an export error: the feature has not been enabled for that environment.",[10,4483,4484],{},[3747,4485],{"id":4486},"dossier",[31,4488,4490],{"id":4489},"assemble-an-installation-dossier","Assemble an installation dossier",[10,4492,4493],{},"Select the required documents in the dossier builder. PlanElec creates a cover, document index, and continuous page numbering locally, then merges the selected PDFs in a fixed order.",[10,4495,4496],{},"This is currently a working and review state. The versioned server snapshot and formally reviewed real-world outputs required for a final dossier are not yet generally released.",[10,4498,4499],{},[3747,4500],{"id":4501},"metadata",[31,4503,4505],{"id":4504},"review-project-metadata","Review project metadata",[10,4507,4508],{},"Open the project details from the export area and check at least:",[3817,4510,4511,4514,4517,4520,4523,4526,4529],{},[749,4512,4513],{},"customer and installation address;",[749,4515,4516],{},"installer and contact details;",[749,4518,4519],{},"inspection body;",[749,4521,4522],{},"Belgian EAN;",[749,4524,4525],{},"residential or non-residential installation and AC\u002FDC designation;",[749,4527,4528],{},"plan format, revision, and project notes;",[749,4530,4531],{},"logo, if used.",[10,4533,4534],{},"An invalid EAN is not rendered as a valid number, but Early Access does not automatically block the download.",[31,4536,4538],{"id":4537},"final-check-before-sharing","Final check before sharing",[10,4540,4541],{},"Open the downloaded file outside PlanElec and review every page. Check page order, legibility, metadata, warnings, and missing parts. Keep the project version used to create the document and have the result reviewed by the responsible electrician.",[10,4543,4544,4545,4549,4550,3806],{},"Need to review the project model first? Start with ",[3747,4546,4548],{"href":4547},"\u002Fen\u002Fhelp\u002Fgetting-started","Getting started"," or learn how to ",[3747,4551,4552],{"href":3854},"review automatic planning",{"title":781,"searchDepth":782,"depth":782,"links":4554},[4555,4556,4557,4558,4559,4560,4561,4562,4563],{"id":4278,"depth":782,"text":4279},{"id":4371,"depth":782,"text":4301},{"id":4401,"depth":782,"text":4312},{"id":4414,"depth":782,"text":4322},{"id":4437,"depth":782,"text":4333},{"id":4473,"depth":782,"text":4344},{"id":4489,"depth":782,"text":4490},{"id":4504,"depth":782,"text":4505},{"id":4537,"depth":782,"text":4538},"See which PDFs PlanElec creates, which outputs are available or in pilot, and what to review before sharing or inspection.","document-exports",{},"\u002Fhelp\u002Fdocument-exports.en",{"title":4266,"description":4564},"export-documents","help\u002Fdocument-exports.en",[4572,4000,3998,815,4104,4573,4574,4575],"PDF export","cable list","material list","installation dossier","3pm-npBL02QFSLFDnpzAGuc9YV7N0HvaFvrDq0uIhuQ",{"id":4,"title":5,"body":4578,"category":798,"description":799,"extension":800,"guideId":801,"locale":802,"meta":5189,"navigation":804,"order":805,"path":806,"publishedAt":807,"readTime":808,"seo":5190,"slug":810,"stem":811,"tags":5191,"updatedAt":819,"__hash__":820},{"type":7,"value":4579,"toc":5174},[4580,4582,4584,4588,4592,4594,4602,4604,4606,4772,4774,4820,4822,4878,4880,4916,4918,4974,4976,5002,5004,5040,5042,5128,5130,5132,5136,5140,5144,5148,5150,5152,5168,5170,5172],[10,4581,12],{},[10,4583,15],{},[10,4585,18,4586,23],{},[20,4587,22],{},[25,4589,4590],{},[10,4591,29],{},[31,4593,34],{"id":33},[10,4595,37,4596,41,4598,45,4600,49],{},[20,4597,40],{},[20,4599,44],{},[20,4601,48],{},[10,4603,52],{},[54,4605,57],{"id":56},[59,4607,4608,4620],{},[62,4609,4610],{},[65,4611,4612,4614,4616,4618],{},[68,4613,70],{},[68,4615,73],{},[68,4617,76],{},[68,4619,79],{},[81,4621,4622,4632,4642,4652,4662,4672,4682,4692,4702,4712,4722,4732,4742,4752,4762],{},[65,4623,4624,4626,4628,4630],{},[86,4625,88],{},[86,4627,91],{},[86,4629,94],{},[86,4631,97],{},[65,4633,4634,4636,4638,4640],{},[86,4635,102],{},[86,4637,105],{},[86,4639,108],{},[86,4641,97],{},[65,4643,4644,4646,4648,4650],{},[86,4645,115],{},[86,4647,118],{},[86,4649,121],{},[86,4651,97],{},[65,4653,4654,4656,4658,4660],{},[86,4655,128],{},[86,4657,131],{},[86,4659,134],{},[86,4661,97],{},[65,4663,4664,4666,4668,4670],{},[86,4665,141],{},[86,4667,144],{},[86,4669,121],{},[86,4671,149],{},[65,4673,4674,4676,4678,4680],{},[86,4675,154],{},[86,4677,157],{},[86,4679,108],{},[86,4681,97],{},[65,4683,4684,4686,4688,4690],{},[86,4685,166],{},[86,4687,169],{},[86,4689,172],{},[86,4691,175],{},[65,4693,4694,4696,4698,4700],{},[86,4695,180],{},[86,4697,183],{},[86,4699,186],{},[86,4701,97],{},[65,4703,4704,4706,4708,4710],{},[86,4705,193],{},[86,4707,196],{},[86,4709,199],{},[86,4711,97],{},[65,4713,4714,4716,4718,4720],{},[86,4715,206],{},[86,4717,209],{},[86,4719,121],{},[86,4721,149],{},[65,4723,4724,4726,4728,4730],{},[86,4725,218],{},[86,4727,221],{},[86,4729,108],{},[86,4731,97],{},[65,4733,4734,4736,4738,4740],{},[86,4735,230],{},[86,4737,233],{},[86,4739,236],{},[86,4741,149],{},[65,4743,4744,4746,4748,4750],{},[86,4745,243],{},[86,4747,246],{},[86,4749,121],{},[86,4751,149],{},[65,4753,4754,4756,4758,4760],{},[86,4755,255],{},[86,4757,258],{},[86,4759,261],{},[86,4761,97],{},[65,4763,4764,4766,4768,4770],{},[86,4765,268],{},[86,4767,271],{},[86,4769,274],{},[86,4771,97],{},[54,4773,280],{"id":279},[59,4775,4776,4788],{},[62,4777,4778],{},[65,4779,4780,4782,4784,4786],{},[68,4781,70],{},[68,4783,73],{},[68,4785,76],{},[68,4787,79],{},[81,4789,4790,4800,4810],{},[65,4791,4792,4794,4796,4798],{},[86,4793,301],{},[86,4795,304],{},[86,4797,307],{},[86,4799,97],{},[65,4801,4802,4804,4806,4808],{},[86,4803,314],{},[86,4805,317],{},[86,4807,320],{},[86,4809,97],{},[65,4811,4812,4814,4816,4818],{},[86,4813,327],{},[86,4815,330],{},[86,4817,121],{},[86,4819,149],{},[54,4821,338],{"id":337},[59,4823,4824,4836],{},[62,4825,4826],{},[65,4827,4828,4830,4832,4834],{},[68,4829,70],{},[68,4831,73],{},[68,4833,76],{},[68,4835,79],{},[81,4837,4838,4848,4858,4868],{},[65,4839,4840,4842,4844,4846],{},[86,4841,359],{},[86,4843,362],{},[86,4845,365],{},[86,4847,97],{},[65,4849,4850,4852,4854,4856],{},[86,4851,372],{},[86,4853,375],{},[86,4855,378],{},[86,4857,97],{},[65,4859,4860,4862,4864,4866],{},[86,4861,385],{},[86,4863,388],{},[86,4865,391],{},[86,4867,97],{},[65,4869,4870,4872,4874,4876],{},[86,4871,398],{},[86,4873,401],{},[86,4875,404],{},[86,4877,97],{},[54,4879,410],{"id":409},[59,4881,4882,4894],{},[62,4883,4884],{},[65,4885,4886,4888,4890,4892],{},[68,4887,70],{},[68,4889,73],{},[68,4891,76],{},[68,4893,79],{},[81,4895,4896,4906],{},[65,4897,4898,4900,4902,4904],{},[86,4899,431],{},[86,4901,434],{},[86,4903,437],{},[86,4905,97],{},[65,4907,4908,4910,4912,4914],{},[86,4909,444],{},[86,4911,447],{},[86,4913,121],{},[86,4915,149],{},[54,4917,455],{"id":454},[59,4919,4920,4932],{},[62,4921,4922],{},[65,4923,4924,4926,4928,4930],{},[68,4925,70],{},[68,4927,73],{},[68,4929,76],{},[68,4931,79],{},[81,4933,4934,4944,4954,4964],{},[65,4935,4936,4938,4940,4942],{},[86,4937,476],{},[86,4939,479],{},[86,4941,482],{},[86,4943,97],{},[65,4945,4946,4948,4950,4952],{},[86,4947,489],{},[86,4949,492],{},[86,4951,495],{},[86,4953,97],{},[65,4955,4956,4958,4960,4962],{},[86,4957,502],{},[86,4959,505],{},[86,4961,508],{},[86,4963,97],{},[65,4965,4966,4968,4970,4972],{},[86,4967,515],{},[86,4969,518],{},[86,4971,121],{},[86,4973,149],{},[54,4975,526],{"id":525},[59,4977,4978,4990],{},[62,4979,4980],{},[65,4981,4982,4984,4986,4988],{},[68,4983,70],{},[68,4985,73],{},[68,4987,76],{},[68,4989,79],{},[81,4991,4992],{},[65,4993,4994,4996,4998,5000],{},[86,4995,547],{},[86,4997,550],{},[86,4999,121],{},[86,5001,97],{},[54,5003,558],{"id":557},[59,5005,5006,5018],{},[62,5007,5008],{},[65,5009,5010,5012,5014,5016],{},[68,5011,70],{},[68,5013,73],{},[68,5015,76],{},[68,5017,79],{},[81,5019,5020,5030],{},[65,5021,5022,5024,5026,5028],{},[86,5023,579],{},[86,5025,582],{},[86,5027,585],{},[86,5029,97],{},[65,5031,5032,5034,5036,5038],{},[86,5033,592],{},[86,5035,595],{},[86,5037,121],{},[86,5039,97],{},[54,5041,603],{"id":602},[59,5043,5044,5056],{},[62,5045,5046],{},[65,5047,5048,5050,5052,5054],{},[68,5049,70],{},[68,5051,73],{},[68,5053,76],{},[68,5055,79],{},[81,5057,5058,5068,5078,5088,5098,5108,5118],{},[65,5059,5060,5062,5064,5066],{},[86,5061,624],{},[86,5063,627],{},[86,5065,121],{},[86,5067,149],{},[65,5069,5070,5072,5074,5076],{},[86,5071,636],{},[86,5073,639],{},[86,5075,642],{},[86,5077,97],{},[65,5079,5080,5082,5084,5086],{},[86,5081,649],{},[86,5083,652],{},[86,5085,655],{},[86,5087,97],{},[65,5089,5090,5092,5094,5096],{},[86,5091,662],{},[86,5093,665],{},[86,5095,121],{},[86,5097,149],{},[65,5099,5100,5102,5104,5106],{},[86,5101,674],{},[86,5103,677],{},[86,5105,680],{},[86,5107,149],{},[65,5109,5110,5112,5114,5116],{},[86,5111,687],{},[86,5113,690],{},[86,5115,121],{},[86,5117,175],{},[65,5119,5120,5122,5124,5126],{},[86,5121,699],{},[86,5123,702],{},[86,5125,121],{},[86,5127,149],{},[31,5129,710],{"id":709},[10,5131,713],{},[10,5133,5134,719],{},[20,5135,718],{},[10,5137,5138,725],{},[20,5139,724],{},[10,5141,5142,731],{},[20,5143,730],{},[10,5145,5146,737],{},[20,5147,736],{},[31,5149,741],{"id":740},[10,5151,744],{},[746,5153,5154,5156,5158,5160,5162,5164,5166],{},[749,5155,751],{},[749,5157,754],{},[749,5159,757],{},[749,5161,760],{},[749,5163,763],{},[749,5165,766],{},[749,5167,769],{},[31,5169,773],{"id":772},[10,5171,776],{},[10,5173,779],{},{"title":781,"searchDepth":782,"depth":782,"links":5175},[5176,5186,5187,5188],{"id":33,"depth":782,"text":34,"children":5177},[5178,5179,5180,5181,5182,5183,5184,5185],{"id":56,"depth":787,"text":57},{"id":279,"depth":787,"text":280},{"id":337,"depth":787,"text":338},{"id":409,"depth":787,"text":410},{"id":454,"depth":787,"text":455},{"id":525,"depth":787,"text":526},{"id":557,"depth":787,"text":558},{"id":602,"depth":787,"text":603},{"id":709,"depth":782,"text":710},{"id":740,"depth":782,"text":741},{"id":772,"depth":782,"text":773},{},{"title":5,"description":799},[813,814,815,816,817,818],{"id":5193,"title":5194,"body":5195,"category":3986,"description":5360,"extension":800,"guideId":5361,"locale":802,"meta":5362,"navigation":804,"order":5363,"path":5364,"publishedAt":5365,"readTime":808,"seo":5366,"slug":5367,"stem":5368,"tags":5369,"updatedAt":5365,"__hash__":5376},"help\u002Fhelp\u002Ffloorplan-import-calibration.en.md","Import and calibrate a floor plan",{"type":7,"value":5196,"toc":5354},[5197,5204,5209,5213,5223,5243,5246,5251,5255,5281,5284,5310,5313,5317,5320,5323,5337,5340,5344,5347],[10,5198,5199,5200,5203],{},"An imported plan is a ",[20,5201,5202],{},"reference layer"," in PlanElec. You continue to draw walls, rooms and electrical symbols over it as editable PlanElec data. That keeps an export legible even if you later hide or replace the original plan.",[10,5205,5206],{},[3747,5207],{"id":5208},"import",[31,5210,5212],{"id":5211},"import-a-plan-reference","Import a plan reference",[10,5214,3927,5215,5218,5219,5222],{},[20,5216,5217],{},"Floor plan",", open the ",[20,5220,5221],{},"Gallery"," and select import. You can select PNG, JPEG and WebP images, individual PDF pages and DXF drawings, then assign them to a floor.",[3817,5224,5225,5228,5231,5234],{},[749,5226,5227],{},"Select the file and its target floor.",[749,5229,5230],{},"For a PDF, select the required pages; for a DXF, deselect drawing layers you do not need.",[749,5232,5233],{},"Complete the import. You can retry an individual file that failed.",[749,5235,5236,5237,5240,5241,3806],{},"Select ",[20,5238,5239],{},"Set up"," for a layer. After a single import, the layer workbench opens directly; after a batch import, open it yourself with ",[20,5242,5239],{},[10,5244,5245],{},"DXF is processed in the browser as a reference image. Model Space and the selected layers are considered; DWG files are not imported. Check that the resulting crop contains the floor plan you actually need.",[10,5247,5248],{},[3747,5249],{"id":5250},"calibrate",[31,5252,5254],{"id":5253},"set-scale-rotation-and-position","Set scale, rotation and position",[10,5256,5257,5258,5261,5262,5261,5265,5268,5269,5272,5273,5276,5277,5280],{},"The layer workbench has the steps ",[20,5259,5260],{},"Crop",", ",[20,5263,5264],{},"Rotate",[20,5266,5267],{},"Scale"," and ",[20,5270,5271],{},"Position",". Pan and zoom remain available while it is open, but drawing tools are locked. Your changes remain a draft until you select ",[20,5274,5275],{},"Done","; ",[20,5278,5279],{},"Cancel"," discards them.",[10,5282,5283],{},"Calibrate an image or PDF layer with a known measurement:",[3817,5285,5286,5296,5299,5302,5305],{},[749,5287,5288,5289,5291,5292,5295],{},"Open ",[20,5290,5267],{},", or select ",[20,5293,5294],{},"Calibrate"," in the toolbar.",[749,5297,5298],{},"Place two points on a distance whose real length you know.",[749,5300,5301],{},"Enter the length in metres and inspect the preview.",[749,5303,5304],{},"If necessary, align the reference edge horizontally or vertically.",[749,5306,5236,5307,5309],{},[20,5308,5275],{}," only after checking the result.",[10,5311,5312],{},"For a DXF, PlanElec initially uses the drawing unit or displays an estimate for you to select. The scale source remains visible. Recalibrate manually whenever a known dimension does not match.",[31,5314,5316],{"id":5315},"continue-drawing-on-the-reference","Continue drawing on the reference",[10,5318,5319],{},"Adjust opacity and crop if required. Then draw closed exterior and interior walls as a polygon or rectangle. PlanElec derives rooms from those walls; devices and cable routes use this editable wall graph, not pixels in the reference.",[10,5321,5322],{},"Check the following before planning the electrical installation:",[746,5324,5325,5328,5331,5334],{},[749,5326,5327],{},"Do one or more known dimensions match the configured scale?",[749,5329,5330],{},"Is the plan rotated and positioned correctly?",[749,5332,5333],{},"Are only relevant layers visible?",[749,5335,5336],{},"Have exterior and interior walls been traced as PlanElec walls?",[10,5338,5339],{},"For multiple floors, set up each floor separately. Aligning floors to each other is a separate task and does not replace calibration of an imported layer.",[31,5341,5343],{"id":5342},"what-importing-does-not-do","What importing does not do",[10,5345,5346],{},"Importing does not automatically recognise rooms or an electrical installation, and it does not produce an official survey. It is an accurate drawing aid. Check dimensions, wall layout and the real installation before placing symbols or exporting documents.",[10,5348,5349,5350,3806],{},"Next: ",[3747,5351,5353],{"href":5352},"\u002Fen\u002Fhelp\u002Fplace-and-connect-electrical-symbols","place and connect electrical symbols",{"title":781,"searchDepth":782,"depth":782,"links":5355},[5356,5357,5358,5359],{"id":5211,"depth":782,"text":5212},{"id":5253,"depth":782,"text":5254},{"id":5315,"depth":782,"text":5316},{"id":5342,"depth":782,"text":5343},"Use an image, PDF or DXF drawing as a scale-accurate reference, align the layer and draw the editable floor plan over it.","floorplan-import-calibration",{},5,"\u002Fhelp\u002Ffloorplan-import-calibration.en","2026-08-21",{"title":5194,"description":5360},"import-and-calibrate-a-floor-plan","help\u002Ffloorplan-import-calibration.en",[5370,5371,5372,5373,5374,5375],"floor plan import","PDF","DXF","calibration","scale","layer workbench","GDFhTWTDwrXuWj_qRP3Uqrosq7TS9u_I3TjpULBwGb4",{"id":5378,"title":5379,"body":5380,"category":3986,"description":5522,"extension":800,"guideId":5523,"locale":802,"meta":5524,"navigation":804,"order":5525,"path":5526,"publishedAt":5365,"readTime":3993,"seo":5527,"slug":5528,"stem":5529,"tags":5530,"updatedAt":5365,"__hash__":5536},"help\u002Fhelp\u002Fplace-and-connect-symbols.en.md","Place and connect electrical symbols",{"type":7,"value":5381,"toc":5516},[5382,5389,5394,5398,5403,5417,5420,5424,5434,5444,5447,5452,5456,5459,5462,5465,5489,5492,5496,5510],[10,5383,5384,5385,5388],{},"A symbol on the floor plan first describes its ",[20,5386,5387],{},"physical location",". Linking it to the electrical topology turns it into an assigned consumer or item of equipment for a circuit, diagram and documents.",[10,5390,5391],{},[3747,5392],{"id":5393},"place",[31,5395,5397],{"id":5396},"place-symbols-from-the-palette","Place symbols from the palette",[10,5399,3927,5400,5402],{},[20,5401,5217],{},", open the tool palette and select a socket, switch, light, fixed appliance, box or distribution board. The tool icons are shown in the palette; pointing at one shows its name.",[3817,5404,5405,5408,5411,5414],{},[749,5406,5407],{},"Select the symbol tool.",[749,5409,5410],{},"Place wall-mounted devices on the correct side of the wall. Sockets and switches snap to walls.",[749,5412,5413],{},"Place free lights or spots in the room.",[749,5415,5416],{},"Check the position, orientation and symbol variant after placing it.",[10,5418,5419],{},"A symbol can only be placed where the editor identifies a valid location. The preview shows the final geometry before you commit it. Correct the wall or room first if a symbol will not snap where you intend.",[31,5421,5423],{"id":5422},"create-shared-cover-frames","Create shared cover frames",[10,5425,5426,5427,5430,5431,5433],{},"An installation group is a physical combination with a shared two- to five-gang cover frame. It is ",[20,5428,5429],{},"not"," a switch chain and ",[20,5432,5429],{}," a circuit.",[10,5435,5436,5437,5440,5441,5443],{},"Drag suitable devices together on the same wall side, or start the cover-frame tool. In the ",[20,5438,5439],{},"Installation group"," panel, choose horizontal or vertical and complete it with ",[20,5442,5275],{},". Moving one member moves the combination.",[10,5445,5446],{},"Switches, standard sockets, Ethernet and coax outlets can be grouped. IP44 sockets remain excluded because they use a sealed frame. Passive data outlets do not become 230 V consumers as a result.",[10,5448,5449],{},[3747,5450],{"id":5451},"topology",[31,5453,5455],{"id":5454},"link-the-device-to-electrical-topology","Link the device to electrical topology",[10,5457,5458],{},"Open the placed device's properties and link it to a type-compatible node in the electrical topology. Socket, switch and light variants are treated as matching families. Connection and junction boxes only become electrically effective when they are genuinely linked.",[10,5460,5461],{},"Then review the list of unconnected components. It shows symbols that are located on the floor plan but are not yet part of the electrical model.",[10,5463,5464],{},"Keep these concepts separate:",[746,5466,5467,5472,5477,5483],{},[749,5468,5469,5471],{},[20,5470,5271],{},": where is the device on the floor plan?",[749,5473,5474,5476],{},[20,5475,5439],{},": which inserts share one cover frame?",[749,5478,5479,5482],{},[20,5480,5481],{},"Topology",": which electrical node belongs to the device?",[749,5484,5485,5488],{},[20,5486,5487],{},"Circuit",": which protective device supplies that node?",[10,5490,5491],{},"Changing a cover frame changes neither a switching function nor a circuit assignment. Next, edit the switch chain for lighting control and assign devices to a circuit for electrical supply.",[31,5493,5495],{"id":5494},"check-before-continuing","Check before continuing",[746,5497,5498,5501,5504,5507],{},[749,5499,5500],{},"Every symbol is in its intended real-world location.",[749,5502,5503],{},"Wall-mounted devices are aligned to the right wall side.",[749,5505,5506],{},"Cover-frame combinations represent the intended mounting, not assumed wiring.",[749,5508,5509],{},"All electrical devices are linked to the appropriate topology node.",[10,5511,5349,5512,3806],{},[3747,5513,5515],{"href":5514},"\u002Fen\u002Fhelp\u002Fswitch-chains-circuits-and-cable-routes","edit switch chains, circuits and cable routes",{"title":781,"searchDepth":782,"depth":782,"links":5517},[5518,5519,5520,5521],{"id":5396,"depth":782,"text":5397},{"id":5422,"depth":782,"text":5423},{"id":5454,"depth":782,"text":5455},{"id":5494,"depth":782,"text":5495},"Place devices at the right location, create shared cover frames and connect electrical symbols to the appropriate topology.","place-and-connect-symbols",{},6,"\u002Fhelp\u002Fplace-and-connect-symbols.en",{"title":5379,"description":5522},"place-and-connect-electrical-symbols","help\u002Fplace-and-connect-symbols.en",[5531,5532,5533,5534,5535,5451],"electrical symbols","sockets","switches","lights","cover frames","pKq3YFepVen1i8o4BElksAYt-OeKD7QcZs5DZ4o6Svo",{"id":5538,"title":5539,"body":5540,"category":4251,"description":5656,"extension":800,"guideId":5657,"locale":802,"meta":5658,"navigation":804,"order":5659,"path":5660,"publishedAt":5365,"readTime":4255,"seo":5661,"slug":5662,"stem":5663,"tags":5664,"updatedAt":5365,"__hash__":5671},"help\u002Fhelp\u002Fswitch-chains-circuits-cable-routes.en.md","Edit switch chains, circuits and cable routes",{"type":7,"value":5541,"toc":5650},[5542,5556,5561,5565,5571,5574,5577,5581,5585,5594,5597,5600,5605,5609,5623,5626,5629,5633,5647],[10,5543,5544,5545,5548,5549,5548,5552,5555],{},"These three tools answer different questions: ",[20,5546,5547],{},"which switch controls which light?"," ",[20,5550,5551],{},"Which circuit supplies which device?",[20,5553,5554],{},"Where does the cable physically run?"," Edit them in sequence so that the plan remains technically traceable.",[10,5557,5558],{},[3747,5559],{"id":5560},"switch-chains",[31,5562,5564],{"id":5563},"link-switches-and-lights-as-a-chain","Link switches and lights as a chain",[10,5566,3756,5567,5570],{},[20,5568,5569],{},"Switch chain"," in the floor plan. It links switches and the lights they control in a logical order. PlanElec can propose a chain for free switches and lights in one room; always check the proposal against the intended controls.",[10,5572,5573],{},"For a manual chain, deliberately select the participating devices. A valid chain includes at least one switch and one light. A device cannot belong to multiple switch chains at once. Across several floors, the chain remains project-wide; each floor shows only its local sections and continuation markers.",[10,5575,5576],{},"Switching function and pole count are separate settings. The application can derive a one-way, two-way or intermediate switching function from the chain; you choose the pole count explicitly. A double switch is one physical device with two separate channels: deliberately assign each light to channel A or B.",[10,5578,5579],{},[3747,5580],{"id":4104},[31,5582,5584],{"id":5583},"assign-devices-to-an-existing-circuit","Assign devices to an existing circuit",[10,5586,3756,5587,5590,5591,5593],{},[20,5588,5589],{},"Assign circuit",". In the panel, first select the target circuit or its MCB, then select devices, including through the floor selector. ",[20,5592,5275],{}," applies the selection together.",[10,5595,5596],{},"Devices that are not yet linked are created as consumers under the selected MCB and linked to their floor-plan symbol. When a device already belongs to another MCB, the application asks for explicit confirmation before moving it. Cancelling changes no project data; you can undo the entire confirmation in one step.",[10,5598,5599],{},"Circuit assignment describes electrical membership. It does not yet define the physical path through walls, shafts or floors.",[10,5601,5602],{},[3747,5603],{"id":5604},"cable-routes",[31,5606,5608],{"id":5607},"plan-and-refine-the-cable-route","Plan and refine the cable route",[10,5610,3756,5611,5614,5615,5618,5619,5622],{},[20,5612,5613],{},"Cable route",". When cables exist in the topology, use ",[20,5616,5617],{},"Auto-route all"," for the active floor or select a cable and choose ",[20,5620,5621],{},"Auto-route",". The automatic route follows drawn walls where possible; check it against the intended installation.",[10,5624,5625],{},"Select a cable line to edit it manually. Click a segment to add a waypoint and drag it immediately; double-click to remove a waypoint. Escape clears the selection or exits the mode. The displayed length is used by material lists, voltage-drop calculation and exports, so check every exceptional route.",[10,5627,5628],{},"For a cable between floors, explicitly select an existing stair, shaft or riser in the cable-route panel. PlanElec does not invent a vertical connection. If a required connector or reliable heights are missing, the route remains incomplete instead of showing a misleading length.",[31,5630,5632],{"id":5631},"final-check","Final check",[746,5634,5635,5638,5641,5644],{},[749,5636,5637],{},"Test the switch chain against the intended controls, not only spatial proximity.",[749,5639,5640],{},"Check each device's circuit, protective device and topology.",[749,5642,5643],{},"Check cable route and length against the planned installation path.",[749,5645,5646],{},"Treat automatic proposals as editable planning assistance, not approval for construction.",[10,5648,5649],{},"You can then continue checking the distribution board and single-line diagram, and run the supported self-check.",{"title":781,"searchDepth":782,"depth":782,"links":5651},[5652,5653,5654,5655],{"id":5563,"depth":782,"text":5564},{"id":5583,"depth":782,"text":5584},{"id":5607,"depth":782,"text":5608},{"id":5631,"depth":782,"text":5632},"Keep lighting control, circuit assignment and the physical cable path separate, and use the appropriate tool for each step.","switch-chains-circuits-cable-routes",{},7,"\u002Fhelp\u002Fswitch-chains-circuits-cable-routes.en",{"title":5539,"description":5656},"switch-chains-circuits-and-cable-routes","help\u002Fswitch-chains-circuits-cable-routes.en",[5665,5666,5667,5668,5669,5670],"switch chain","two-way switching","circuit","MCB","cable route","cable length","7PGfErkb9DbnM7iW4nSNmMpAWBcwTJwdnferb-wY1E0",1787555185419]