[{"data":1,"prerenderedAt":4344},["ShallowReactive",2],{"blog-post-fr-ancien-rgie-part-8":3,"blog-alternates-old-building-arei-part8":956},{"id":4,"title":5,"articleId":6,"body":7,"category":934,"date":935,"description":936,"extension":937,"lastUpdated":938,"locale":939,"meta":940,"navigation":941,"path":942,"publishDate":935,"readTime":943,"refreshInterval":944,"seo":945,"slug":946,"stem":947,"tags":948,"__hash__":955},"blog\u002Fblog\u002Fold-building-arei-part8.fr.md","Ancien bâtiment et RGIE Partie 8 : Règles spéciales pour les installations existantes","old-building-arei-part8",{"type":8,"value":9,"toc":894},"minimark",[10,14,23,26,31,38,49,58,60,64,71,76,79,83,90,94,122,130,132,136,139,143,187,191,227,239,243,246,276,280,286,290,312,316,319,321,325,332,336,430,434,437,463,465,469,473,480,484,491,503,507,577,591,593,597,603,607,614,636,640,658,660,664,671,675,689,693,704,708,719,723,785,787,791,845,847,851,878,880],[11,12,5],"h1",{"id":13},"ancien-bâtiment-et-rgie-partie-8-règles-spéciales-pour-les-installations-existantes",[15,16,17,18,22],"p",{},"Toute installation électrique en Belgique ne doit pas forcément répondre aux dernières prescriptions du RGIE. Pour les bâtiments plus anciens, la ",[19,20,21],"strong",{},"Partie 8"," constitue un ensemble de règles spécifiques qui tolère certaines dérogations par rapport au standard actuel — tant qu'il n'existe pas de danger immédiat. Cet article explique quand la Partie 8 s'applique, ce qui est autorisé et où se trouvent les limites.",[24,25],"hr",{},[27,28,30],"h2",{"id":29},"quest-ce-que-la-partie-8","Qu'est-ce que la Partie 8 ?",[15,32,33,34,37],{},"La Partie 8 du RGIE (Règlement Général sur les Installations Électriques) est une ",[19,35,36],{},"réglementation spéciale pour les installations existantes"," qui ont été réalisées et réceptionnées avant l'entrée en vigueur du RGIE actuel.",[15,39,40,41,44,45,48],{},"Le principe de base : tant qu'une installation fonctionne de manière ",[19,42,43],{},"sûre"," et ne représente ",[19,46,47],{},"aucun danger immédiat",", elle n'a pas à être entièrement mise aux normes actuelles — même si elle ne répond pas à toutes les prescriptions en vigueur.",[50,51,52],"blockquote",{},[15,53,54,57],{},[19,55,56],{},"Important :"," La Partie 8 n'est pas un blanc-seing. Elle définit clairement quelles dérogations sont tolérées et lesquelles ne le sont pas.",[24,59],{},[27,61,63],{"id":62},"quand-la-partie-8-sapplique-t-elle","Quand la Partie 8 s'applique-t-elle ?",[15,65,66,67,70],{},"La Partie 8 s'applique aux installations qui remplissent ",[19,68,69],{},"l'une"," des conditions suivantes :",[72,73,75],"h3",{"id":74},"condition-1-installation-avant-le-01101981","Condition 1 : Installation avant le 01.10.1981",[15,77,78],{},"Les installations réalisées avant le 1er octobre 1981 (date d'entrée en vigueur du RGIE original) tombent en principe sous la Partie 8.",[72,80,82],{"id":81},"condition-2-réceptionnée-sous-lancien-rgie","Condition 2 : Réceptionnée sous l'ancien RGIE",[15,84,85,86,89],{},"Les installations qui ont été réceptionnées sous une version antérieure du RGIE et qui n'ont ",[19,87,88],{},"pas été substantiellement modifiées"," depuis la dernière réception.",[72,91,93],{"id":92},"quest-ce-quune-modification-substantielle","Qu'est-ce qu'une « modification substantielle » ?",[95,96,97,104,110,116],"ul",{},[98,99,100,101],"li",{},"Ajout de ",[19,102,103],{},"nouveaux circuits",[98,105,106,107],{},"Extension du ",[19,108,109],{},"tableau de distribution",[98,111,112,113],{},"Modification de l'",[19,114,115],{},"installation de comptage",[98,117,118,121],{},[19,119,120],{},"Recâblage"," important",[50,123,124],{},[15,125,126,129],{},[19,127,128],{},"Attention :"," Les petites modifications comme le remplacement d'une prise ou d'un interrupteur ne comptent PAS comme modification substantielle.",[24,131],{},[27,133,135],{"id":134},"ce-qui-est-autorisé-sous-la-partie-8-dérogations-tolérées","Ce qui est autorisé sous la Partie 8 (Dérogations tolérées)",[15,137,138],{},"Les points suivants s'écartent du RGIE actuel, mais sont tolérés sous la Partie 8 lors du contrôle :",[72,140,142],{"id":141},"_1-anciens-types-de-câbles","1. Anciens types de câbles",[144,145,146,159],"table",{},[147,148,149],"thead",{},[150,151,152,156],"tr",{},[153,154,155],"th",{},"RGIE actuel",[153,157,158],{},"Partie 8 tolère",[160,161,162,171,179],"tbody",{},[150,163,164,168],{},[165,166,167],"td",{},"XVB \u002F VOBst en Preflex",[165,169,170],{},"Câbles VOB dans d'anciennes gaines",[150,172,173,176],{},[165,174,175],{},"Classe de réaction au feu Cca",[165,177,178],{},"Types de câbles plus anciens sans classification CPR",[150,180,181,184],{},[165,182,183],{},"Section minimale 2,5 mm² pour les prises",[165,185,186],{},"Minimum 1 mm² avec fusible max. 6 A ou disjoncteur max. 10 A (Art. 8.2.1 Nr. 5)",[72,188,190],{"id":189},"_2-différentiels-rcd","2. Différentiels (RCD)",[144,192,193,201],{},[147,194,195],{},[150,196,197,199],{},[153,198,155],{},[153,200,158],{},[160,202,203,211,219],{},[150,204,205,208],{},[165,206,207],{},"Différentiel 30 mA par circuit prises",[165,209,210],{},"Pas de 30 mA nécessaire (seulement 300 mA principal)",[150,212,213,216],{},[165,214,215],{},"Différentiel 30 mA obligatoire pour salle de bain",[165,217,218],{},"Reste obligatoire (non couvert par la dérogation Partie 8, Art. 4.2.4.3 b N° 3 \u002F Art. 7.1.4.3)",[150,220,221,224],{},[165,222,223],{},"Max. 8 circuits par RCD",[165,225,226],{},"Plus de circuits autorisés",[50,228,229],{},[15,230,231,234,235,238],{},[19,232,233],{},"Note :"," Même sous la Partie 8, un ",[19,236,237],{},"différentiel principal 300 mA"," est recommandé et souvent exigé par le gestionnaire de réseau lors d'une nouvelle installation de compteur.",[72,240,242],{"id":241},"_3-prises-sans-contact-de-terre","3. Prises sans contact de terre",[15,244,245],{},"Les anciennes prises (type C, sans broche de terre) sont tolérées sous la Partie 8, à condition que :",[95,247,248,255,262,273],{},[98,249,250,251,254],{},"La prise soit protégée par un ",[19,252,253],{},"différentiel à haute ou très haute sensibilité"," (max. 30 mA) (Art. 8.2.1 N° 6 lettre b).",[98,256,257,258,261],{},"Aucun appareil de ",[19,259,260],{},"classe de protection I"," (avec boîtier métallique) ne soit branché.",[98,263,264,265,268,269,272],{},"La prise ne soit pas dans la ",[19,266,267],{},"salle de bain"," ou dans un ",[19,270,271],{},"lieu humide",".",[98,274,275],{},"Le circuit soit par ailleurs intact.",[72,277,279],{"id":278},"_4-pas-de-parafoudre-spd","4. Pas de parafoudre (SPD)",[15,281,282,283,272],{},"Le RGIE actuel prescrit un parafoudre (SPD) Type 2 pour les nouvelles installations. Sous la Partie 8, ce n'est ",[19,284,285],{},"pas requis",[72,287,289],{"id":288},"_5-ancienne-technique-de-distribution","5. Ancienne technique de distribution",[95,291,292,299,305],{},[98,293,294,295,298],{},"Les ",[19,296,297],{},"fusibles"," au lieu de disjoncteurs sont autorisés.",[98,300,294,301,304],{},[19,302,303],{},"fusibles à vis"," (Diazed) sont tolérés.",[98,306,307,308,311],{},"L'absence d'",[19,309,310],{},"étiquetage"," est mentionnée comme défaut, mais n'entraîne pas un échec.",[72,313,315],{"id":314},"_6-pas-de-classification-de-réaction-au-feu-des-câbles","6. Pas de classification de réaction au feu des câbles",[15,317,318],{},"Les câbles sans classification CPR (installés avant 2017) sont tolérés, car le règlement CPR ne s'applique qu'à partir de juillet 2017 pour les nouvelles installations.",[24,320],{},[27,322,324],{"id":323},"ce-qui-nest-pas-autorisé-même-sous-la-partie-8","Ce qui n'est PAS autorisé (même sous la Partie 8)",[15,326,327,328,331],{},"Certaines situations ne sont ",[19,329,330],{},"jamais tolérées",", quel que soit l'âge de l'installation :",[72,333,335],{"id":334},"absolument-inadmissible","Absolument inadmissible :",[144,337,338,348],{},[147,339,340],{},[150,341,342,345],{},[153,343,344],{},"Situation",[153,346,347],{},"Pourquoi ?",[160,349,350,360,370,380,390,400,410,420],{},[150,351,352,357],{},[165,353,354],{},[19,355,356],{},"Câbles dénudés ou endommagés",[165,358,359],{},"Danger immédiat d'électrocution",[150,361,362,367],{},[165,363,364],{},[19,365,366],{},"Absence totale de mise à la terre",[165,368,369],{},"Pas de protection en cas de défaut d'isolement",[150,371,372,377],{},[165,373,374],{},[19,375,376],{},"Eau en contact avec l'électricité",[165,378,379],{},"Danger de mort",[150,381,382,387],{},[165,383,384],{},[19,385,386],{},"Parties sous tension accessibles",[165,388,389],{},"Risque de contact direct",[150,391,392,397],{},[165,393,394],{},[19,395,396],{},"Câbles ou connexions en surchauffe",[165,398,399],{},"Risque d'incendie",[150,401,402,407],{},[165,403,404],{},[19,405,406],{},"Connexions desserrées dans les boîtes de dérivation",[165,408,409],{},"Risque d'arc\u002Fincendie",[150,411,412,417],{},[165,413,414],{},[19,415,416],{},"Boîtes de dérivation sans couvercle",[165,418,419],{},"Protection contre les contacts manquante",[150,421,422,427],{},[165,423,424],{},[19,425,426],{},"Prise de salle de bain en zone 0 ou 1",[165,428,429],{},"Danger de mort, interdit même sous Partie 8",[72,431,433],{"id":432},"exigences-minimales-de-sécurité","Exigences minimales de sécurité :",[15,435,436],{},"Même sous la Partie 8, il faut garantir :",[95,438,439,445,451,457],{},[98,440,441,444],{},[19,442,443],{},"Section suffisante"," pour la charge réelle (pas de câble 0,75 mm² surchargé).",[98,446,447,450],{},[19,448,449],{},"Fusibles fonctionnels"," (pas de fusibles « pontés »).",[98,452,453,456],{},[19,454,455],{},"Mise à la terre du tableau principal"," (connexion à l'électrode de terre).",[98,458,459,462],{},[19,460,461],{},"Accessibilité"," du tableau de distribution.",[24,464],{},[27,466,468],{"id":467},"contrôle-périodique","Contrôle périodique",[72,470,472],{"id":471},"tous-les-25-ans-obligatoire","Tous les 25 ans obligatoire",[15,474,475,476,479],{},"Les installations existantes sous la Partie 8 doivent subir un contrôle périodique tous les ",[19,477,478],{},"25 ans"," par un organisme de contrôle agréé.",[72,481,483],{"id":482},"lors-dun-changement-de-propriétaire","Lors d'un changement de propriétaire",[15,485,486,487,490],{},"Lors de la ",[19,488,489],{},"vente d'un bien immobilier",", une attestation de contrôle valide (de moins de 25 ans) est obligatoire. Si elle n'existe pas, un contrôle doit être effectué avant la vente.",[50,492,493],{},[15,494,495,498,499,502],{},[19,496,497],{},"Délai de 18 mois (Art. 8.4.2.2) :"," Lors de l'achat d'un bien immobilier avec un rapport de contrôle négatif, l'acheteur dispose de ",[19,500,501],{},"18 mois"," à compter de la date d'achat pour remédier aux défauts et faire effectuer un recontrôle.",[72,504,506],{"id":505},"que-vérifie-t-on-lors-du-contrôle-périodique","Que vérifie-t-on lors du contrôle périodique ?",[144,508,509,519],{},[147,510,511],{},[150,512,513,516],{},[153,514,515],{},"Point de contrôle",[153,517,518],{},"Évaluation",[160,520,521,529,537,545,553,561,569],{},[150,522,523,526],{},[165,524,525],{},"Inspection visuelle des câbles et connexions",[165,527,528],{},"Dommages, surchauffe",[150,530,531,534],{},[165,532,533],{},"Mesure de la résistance de terre",[165,535,536],{},"≤ 30 Ω (seuil réglementaire selon Art. 4.2.4.3b ; au-delà, des mesures de protection supplémentaires sont nécessaires)",[150,538,539,542],{},[165,540,541],{},"Mesure de la résistance d'isolement",[165,543,544],{},"> 0,5 MΩ",[150,546,547,550],{},[165,548,549],{},"Test RCD (si présent)",[165,551,552],{},"Temps et courant de déclenchement",[150,554,555,558],{},[165,556,557],{},"Vérification de la protection contre les courts-circuits",[165,559,560],{},"Fusibles \u002F disjoncteurs présents",[150,562,563,566],{},[165,564,565],{},"Protection contre les contacts directs",[165,567,568],{},"Couvercles, protection IP",[150,570,571,574],{},[165,572,573],{},"Documentation",[165,575,576],{},"Schéma unifilaire + plan de situation présents ?",[50,578,579],{},[15,580,581,234,583,586,587,590],{},[19,582,233],{},[19,584,585],{},"schéma unifilaire"," et un ",[19,588,589],{},"plan de situation"," doivent être disponibles — même s'ils doivent être établis rétroactivement.",[24,592],{},[27,594,596],{"id":595},"la-règle-de-contamination-lors-dune-rénovation-partielle","La règle de contamination lors d'une rénovation partielle",[15,598,599,600,272],{},"Un aspect particulièrement important pour les anciens bâtiments : la ",[19,601,602],{},"règle de contamination",[72,604,606],{"id":605},"comment-fonctionne-t-elle","Comment fonctionne-t-elle ?",[15,608,609,610,613],{},"Lorsque vous modifiez ",[19,611,612],{},"substantiellement"," une partie de votre installation (par ex. ajout de nouveaux circuits) :",[615,616,617,624,630],"ol",{},[98,618,619,620,623],{},"La ",[19,621,622],{},"nouvelle partie"," doit entièrement répondre au RGIE actuel.",[98,625,619,626,629],{},[19,627,628],{},"partie existante"," continue d'être évaluée selon la Partie 8.",[98,631,632,635],{},[19,633,634],{},"MAIS :"," Si la nouvelle partie « contamine » la partie existante (par ex. nouveaux câbles dans le même tableau), le contrôleur peut décider que l'ensemble du tableau doit répondre au RGIE actuel.",[72,637,639],{"id":638},"conséquences-pratiques","Conséquences pratiques :",[95,641,642,648,655],{},[98,643,644,645,272],{},"Planifiez les rénovations de manière à ce que les parties nouvelles et anciennes soient ",[19,646,647],{},"clairement séparées",[98,649,650,651,654],{},"Idéalement, un ",[19,652,653],{},"sous-tableau séparé"," pour les nouveaux circuits.",[98,656,657],{},"Documentez précisément ce qui est ancien et ce qui est nouveau.",[24,659],{},[27,661,663],{"id":662},"recommandation-modernisation-progressive","Recommandation : Modernisation progressive",[15,665,666,667,670],{},"Même si la Partie 8 tolère des dérogations, une ",[19,668,669],{},"modernisation progressive"," est recommandée :",[72,672,674],{"id":673},"priorité-1-critique-pour-la-sécurité","Priorité 1 (Critique pour la sécurité)",[95,676,677,680,683,686],{},[98,678,679],{},"Installer un différentiel principal 300 mA (s'il est absent)",[98,681,682],{},"Remplacer les câbles endommagés",[98,684,685],{},"Réparer les connexions desserrées",[98,687,688],{},"Vérifier et améliorer la mise à la terre si nécessaire",[72,690,692],{"id":691},"priorité-2-recommandé","Priorité 2 (Recommandé)",[95,694,695,698,701],{},[98,696,697],{},"Différentiels de groupe 30 mA pour salle de bain et cuisine",[98,699,700],{},"Remplacer les anciens fusibles par des disjoncteurs",[98,702,703],{},"Installer un parafoudre Type 2",[72,705,707],{"id":706},"priorité-3-confort-pérennité","Priorité 3 (Confort + pérennité)",[95,709,710,713,716],{},[98,711,712],{},"Moderniser le tableau (plus de rangées, étiquetage)",[98,714,715],{},"Installer des prises avec terre",[98,717,718],{},"Préparation pour borne de recharge \u002F installation PV",[72,720,722],{"id":721},"orientation-des-coûts","Orientation des coûts",[144,724,725,735],{},[147,726,727],{},[150,728,729,732],{},[153,730,731],{},"Mesure",[153,733,734],{},"Coût estimé",[160,736,737,745,753,761,769,777],{},[150,738,739,742],{},[165,740,741],{},"Installer différentiel principal 300 mA",[165,743,744],{},"150–300 EUR",[150,746,747,750],{},[165,748,749],{},"Différentiel de groupe 30 mA (par pièce)",[165,751,752],{},"80–150 EUR",[150,754,755,758],{},[165,756,757],{},"Parafoudre Type 2",[165,759,760],{},"100–250 EUR",[150,762,763,766],{},[165,764,765],{},"Set de disjoncteurs (10 pièces)",[165,767,768],{},"50–100 EUR",[150,770,771,774],{},[165,772,773],{},"Nouveau tableau 4 rangées (complet)",[165,775,776],{},"500–1.500 EUR",[150,778,779,782],{},[165,780,781],{},"Recâblage complet (maison)",[165,783,784],{},"5.000–15.000 EUR",[24,786],{},[27,788,790],{"id":789},"résumé","Résumé",[144,792,793,803],{},[147,794,795],{},[150,796,797,800],{},[153,798,799],{},"Question",[153,801,802],{},"Réponse",[160,804,805,813,821,829,837],{},[150,806,807,810],{},[165,808,809],{},"Mon ancien bâtiment doit-il répondre au RGIE actuel ?",[165,811,812],{},"Pas entièrement, la Partie 8 autorise des dérogations",[150,814,815,818],{},[165,816,817],{},"Ai-je besoin d'un différentiel 30 mA ?",[165,819,820],{},"Pas obligatoire sous Partie 8, mais fortement recommandé",[150,822,823,826],{},[165,824,825],{},"Les anciennes prises sans terre sont-elles autorisées ?",[165,827,828],{},"Sous conditions oui (pas de salle de bain, pas d'appareils classe I)",[150,830,831,834],{},[165,832,833],{},"À quelle fréquence faut-il contrôler ?",[165,835,836],{},"Tous les 25 ans + lors d'un changement de propriétaire",[150,838,839,842],{},[165,840,841],{},"Que se passe-t-il en cas de rénovation partielle ?",[165,843,844],{},"Nouvelle partie = RGIE actuel, ancienne = Partie 8 (règle de contamination)",[24,846],{},[27,848,850],{"id":849},"articles-connexes","Articles connexes",[95,852,853,860,866,872],{},[98,854,855],{},[856,857,859],"a",{"href":858},"\u002Ffr\u002Fblog\u002Fcontrole-electrique","Contrôle électrique en Belgique : Que vérifie-t-on ?",[98,861,862],{},[856,863,865],{"href":864},"\u002Ffr\u002Fblog\u002Frgie-2026-changements","Que change le RGIE 2026 ?",[98,867,868],{},[856,869,871],{"href":870},"\u002Ffr\u002Fblog\u002Fpreflex-vs-pose-libre","Preflex vs. pose libre",[98,873,874],{},[856,875,877],{"href":876},"\u002Ffr\u002Fblog\u002Fplanifier-tableau-electrique","Planifier un tableau électrique",[24,879],{},[15,881,882],{},[883,884,885,886,889,890],"em",{},"Même pour les anciens bâtiments, ",[19,887,888],{},"PlanElec"," aide à construire numériquement le schéma unifilaire et le plan de situation. L'auto-contrôle est indicatif ; faites vérifier les documents et les dérogations applicables par un professionnel. ",[856,891,893],{"href":892},"\u002F","Commencer gratuitement →",{"title":895,"searchDepth":896,"depth":896,"links":897},"",2,[898,899,905,913,917,922,926,932,933],{"id":29,"depth":896,"text":30},{"id":62,"depth":896,"text":63,"children":900},[901,903,904],{"id":74,"depth":902,"text":75},3,{"id":81,"depth":902,"text":82},{"id":92,"depth":902,"text":93},{"id":134,"depth":896,"text":135,"children":906},[907,908,909,910,911,912],{"id":141,"depth":902,"text":142},{"id":189,"depth":902,"text":190},{"id":241,"depth":902,"text":242},{"id":278,"depth":902,"text":279},{"id":288,"depth":902,"text":289},{"id":314,"depth":902,"text":315},{"id":323,"depth":896,"text":324,"children":914},[915,916],{"id":334,"depth":902,"text":335},{"id":432,"depth":902,"text":433},{"id":467,"depth":896,"text":468,"children":918},[919,920,921],{"id":471,"depth":902,"text":472},{"id":482,"depth":902,"text":483},{"id":505,"depth":902,"text":506},{"id":595,"depth":896,"text":596,"children":923},[924,925],{"id":605,"depth":902,"text":606},{"id":638,"depth":902,"text":639},{"id":662,"depth":896,"text":663,"children":927},[928,929,930,931],{"id":673,"depth":902,"text":674},{"id":691,"depth":902,"text":692},{"id":706,"depth":902,"text":707},{"id":721,"depth":902,"text":722},{"id":789,"depth":896,"text":790},{"id":849,"depth":896,"text":850},"guide","2026-04-14","Ce qui s'applique aux anciennes installations électriques en Belgique. RGIE Partie 8 expliqué : dérogations autorisées, contrôle périodique et conseils pour une modernisation progressive.","md","2026-06-05","fr",{},true,"\u002Fblog\u002Fold-building-arei-part8.fr","8 min",12,{"title":5,"description":936},"ancien-rgie-part-8","blog\u002Fold-building-arei-part8.fr",[949,950,21,951,952,953,954],"ancien bâtiment","RGIE","installation existante","rénovation","contrôle","périodique","omOCczz1zDQZeVaE62RW1l8-T0oTm2JMKjCL3B7oMdM",[957,1873,2786,3433],{"id":958,"title":959,"articleId":6,"body":960,"category":934,"date":935,"description":1857,"extension":937,"lastUpdated":938,"locale":1858,"meta":1859,"navigation":941,"path":1860,"publishDate":935,"readTime":943,"refreshInterval":944,"seo":1861,"slug":1862,"stem":1863,"tags":1864,"__hash__":1872},"blog\u002Fblog\u002Fold-building-arei-part8.de.md","Altbau und AREI Part 8: Sonderregeln für bestehende Installationen",{"type":8,"value":961,"toc":1820},[962,965,972,974,978,985,996,1004,1006,1010,1017,1021,1024,1028,1035,1039,1065,1073,1075,1079,1082,1086,1124,1128,1164,1176,1180,1183,1213,1217,1223,1227,1248,1252,1255,1257,1261,1268,1272,1366,1370,1373,1399,1401,1405,1409,1416,1420,1427,1439,1443,1512,1527,1529,1533,1539,1543,1550,1571,1575,1594,1596,1600,1607,1611,1625,1629,1640,1644,1655,1659,1715,1717,1721,1775,1777,1781,1807,1809],[11,963,959],{"id":964},"altbau-und-arei-part-8-sonderregeln-für-bestehende-installationen",[15,966,967,968,971],{},"Nicht jede Elektroinstallation in Belgien muss den neuesten AREI-Vorschriften entsprechen. Für ältere Gebäude gibt es mit ",[19,969,970],{},"Part 8 (Partie 8)"," ein eigenes Regelwerk, das bestimmte Abweichungen vom aktuellen Standard toleriert — solange keine unmittelbare Gefahr besteht. Dieser Artikel erklärt, wann Part 8 gilt, was erlaubt ist und wo die Grenzen liegen.",[24,973],{},[27,975,977],{"id":976},"was-ist-part-8","Was ist Part 8?",[15,979,980,981,984],{},"Part 8 des AREI (Allgemeines Reglement über die Elektrischen Installationen \u002F Règlement Général sur les Installations Électriques) ist eine ",[19,982,983],{},"Sonderregelung für bestehende Installationen",", die vor Inkrafttreten des aktuellen AREI errichtet und abgenommen wurden.",[15,986,987,988,991,992,995],{},"Das Grundprinzip: Solange eine Installation ",[19,989,990],{},"sicher"," funktioniert und ",[19,993,994],{},"keine unmittelbare Gefahr"," darstellt, muss sie nicht vollständig auf den neuesten Stand gebracht werden — auch wenn sie nicht allen aktuellen Vorschriften entspricht.",[50,997,998],{},[15,999,1000,1003],{},[19,1001,1002],{},"Wichtig:"," Part 8 ist kein Freibrief. Es definiert klar, welche Abweichungen toleriert werden und welche nicht.",[24,1005],{},[27,1007,1009],{"id":1008},"wann-gilt-part-8","Wann gilt Part 8?",[15,1011,1012,1013,1016],{},"Part 8 gilt für Installationen, die ",[19,1014,1015],{},"eine"," der folgenden Bedingungen erfüllen:",[72,1018,1020],{"id":1019},"bedingung-1-installation-vor-dem-01101981","Bedingung 1: Installation vor dem 01.10.1981",[15,1022,1023],{},"Installationen, die vor dem 1. Oktober 1981 errichtet wurden (Datum des Inkrafttretens des ursprünglichen AREI), fallen grundsätzlich unter Part 8.",[72,1025,1027],{"id":1026},"bedingung-2-unter-dem-alten-arei-abgenommen","Bedingung 2: Unter dem alten AREI abgenommen",[15,1029,1030,1031,1034],{},"Installationen, die unter einer früheren Version des AREI abgenommen wurden und seit der letzten Abnahme ",[19,1032,1033],{},"nicht wesentlich verändert"," wurden.",[72,1036,1038],{"id":1037},"was-zählt-als-wesentliche-änderung","Was zählt als „wesentliche Änderung\"?",[95,1040,1041,1047,1053,1059],{},[98,1042,1043,1044],{},"Hinzufügen ",[19,1045,1046],{},"neuer Stromkreise",[98,1048,1049,1050],{},"Erweiterung des ",[19,1051,1052],{},"Verteilerkastens",[98,1054,1055,1056],{},"Änderung der ",[19,1057,1058],{},"Zähleranlage",[98,1060,1061,1062],{},"Umfangreiche ",[19,1063,1064],{},"Umverdrahtung",[50,1066,1067],{},[15,1068,1069,1072],{},[19,1070,1071],{},"Achtung:"," Kleine Änderungen wie der Austausch einer Steckdose oder eines Schalters gelten NICHT als wesentliche Änderung.",[24,1074],{},[27,1076,1078],{"id":1077},"was-ist-unter-part-8-erlaubt-tolerierte-abweichungen","Was ist unter Part 8 erlaubt? (Tolerierte Abweichungen)",[15,1080,1081],{},"Die folgenden Punkte weichen vom aktuellen AREI ab, werden aber unter Part 8 bei der Kontrolle toleriert:",[72,1083,1085],{"id":1084},"_1-alte-kabeltypen","1. Alte Kabeltypen",[144,1087,1088,1098],{},[147,1089,1090],{},[150,1091,1092,1095],{},[153,1093,1094],{},"Aktuelles AREI",[153,1096,1097],{},"Part 8 toleriert",[160,1099,1100,1108,1116],{},[150,1101,1102,1105],{},[165,1103,1104],{},"XVB \u002F VOBst in Preflex",[165,1106,1107],{},"VOB-Kabel in alten Leerrohren",[150,1109,1110,1113],{},[165,1111,1112],{},"Cca-Brandschutzklasse",[165,1114,1115],{},"Ältere Kabeltypen ohne CPR-Klassifizierung",[150,1117,1118,1121],{},[165,1119,1120],{},"Mindestquerschnitt 2,5 mm² für Steckdosen",[165,1122,1123],{},"Mindestens 1 mm² bei Absicherung mit max. 6 A Sicherung oder 10 A Leitungsschutzschalter",[72,1125,1127],{"id":1126},"_2-fehlerstromschutzschalter-rcd-differenzialschalter","2. Fehlerstromschutzschalter (RCD \u002F Differenzialschalter)",[144,1129,1130,1138],{},[147,1131,1132],{},[150,1133,1134,1136],{},[153,1135,1094],{},[153,1137,1097],{},[160,1139,1140,1148,1156],{},[150,1141,1142,1145],{},[165,1143,1144],{},"30 mA RCD pro Steckdosenkreis",[165,1146,1147],{},"Kein 30 mA RCD nötig (nur 300 mA Haupt-RCD)",[150,1149,1150,1153],{},[165,1151,1152],{},"30 mA RCD für Badezimmer Pflicht",[165,1154,1155],{},"Bleibt Pflicht (nicht von der Part-8-Abweichung erfasst, Art. 4.2.4.3 b Nr. 3 \u002F Art. 7.1.4.3)",[150,1157,1158,1161],{},[165,1159,1160],{},"Max. 8 Kreise pro RCD",[165,1162,1163],{},"Mehr Kreise erlaubt",[50,1165,1166],{},[15,1167,1168,1171,1172,1175],{},[19,1169,1170],{},"Hinweis:"," Auch unter Part 8 wird ein ",[19,1173,1174],{},"300 mA Haupt-RCD"," empfohlen und bei Neuinstallation des Zählers oft vom Netzbetreiber vorausgesetzt.",[72,1177,1179],{"id":1178},"_3-steckdosen-ohne-erdungskontakt","3. Steckdosen ohne Erdungskontakt",[15,1181,1182],{},"Alte Steckdosen ohne Erdungsanschluss (die modernen belgischen Steckdosen sind Typ E mit Erdungsstift) werden unter Part 8 toleriert, sofern:",[95,1184,1185,1192,1199,1210],{},[98,1186,1187,1188,1191],{},"Die Steckdose durch einen ",[19,1189,1190],{},"Fehlerstromschutzschalter mit hoher oder sehr hoher Empfindlichkeit"," (max. 30 mA) geschützt ist (Art. 8.2.1 Nr. 6 Buchstabe b).",[98,1193,1194,1195,1198],{},"Keine Geräte der ",[19,1196,1197],{},"Schutzklasse I"," (mit Metallgehäuse) angeschlossen werden.",[98,1200,1201,1202,1205,1206,1209],{},"Die Steckdose nicht im ",[19,1203,1204],{},"Badezimmer"," oder an ",[19,1207,1208],{},"feuchten Orten"," ist.",[98,1211,1212],{},"Der Stromkreis ansonsten intakt ist.",[72,1214,1216],{"id":1215},"_4-kein-spd-überspannungsschutz","4. Kein SPD (Überspannungsschutz)",[15,1218,1219,1220,272],{},"Das aktuelle AREI schreibt für Neuinstallationen einen SPD (Surge Protection Device) Typ 2 vor. Unter Part 8 ist das ",[19,1221,1222],{},"nicht erforderlich",[72,1224,1226],{"id":1225},"_5-alte-verteilertechnik","5. Alte Verteilertechnik",[95,1228,1229,1235,1241],{},[98,1230,1231,1234],{},[19,1232,1233],{},"Schmelzsicherungen"," statt MCBs sind erlaubt.",[98,1236,1237,1240],{},[19,1238,1239],{},"Drehsicherungen"," (Diazed) werden toleriert.",[98,1242,1243,1244,1247],{},"Fehlende ",[19,1245,1246],{},"Beschriftung"," wird als Mangel vermerkt, führt aber nicht zum Durchfallen.",[72,1249,1251],{"id":1250},"_6-keine-brandschutzklassifizierung-der-kabel","6. Keine Brandschutzklassifizierung der Kabel",[15,1253,1254],{},"Kabel ohne CPR-Klassifizierung (vor 2017 installiert) werden toleriert, da die CPR-Verordnung erst ab Juli 2017 für neue Installationen gilt.",[24,1256],{},[27,1258,1260],{"id":1259},"was-ist-nicht-erlaubt-auch-unter-part-8","Was ist NICHT erlaubt (auch unter Part 8)?",[15,1262,1263,1264,1267],{},"Bestimmte Zustände werden ",[19,1265,1266],{},"niemals toleriert",", unabhängig vom Alter der Installation:",[72,1269,1271],{"id":1270},"absolut-unzulässig","Absolut unzulässig:",[144,1273,1274,1284],{},[147,1275,1276],{},[150,1277,1278,1281],{},[153,1279,1280],{},"Zustand",[153,1282,1283],{},"Warum?",[160,1285,1286,1296,1306,1316,1326,1336,1346,1356],{},[150,1287,1288,1293],{},[165,1289,1290],{},[19,1291,1292],{},"Blanke oder beschädigte Kabel",[165,1294,1295],{},"Unmittelbare Stromschlaggefahr",[150,1297,1298,1303],{},[165,1299,1300],{},[19,1301,1302],{},"Fehlende Erdung komplett",[165,1304,1305],{},"Kein Schutz bei Isolationsfehler",[150,1307,1308,1313],{},[165,1309,1310],{},[19,1311,1312],{},"Wasser in Kontakt mit Elektrik",[165,1314,1315],{},"Lebensgefahr",[150,1317,1318,1323],{},[165,1319,1320],{},[19,1321,1322],{},"Zugängliche spannungsführende Teile",[165,1324,1325],{},"Direktes Berührungsrisiko",[150,1327,1328,1333],{},[165,1329,1330],{},[19,1331,1332],{},"Überhitzte Kabel oder Verbindungen",[165,1334,1335],{},"Brandgefahr",[150,1337,1338,1343],{},[165,1339,1340],{},[19,1341,1342],{},"Lose Verbindungen in Verteilerdosen",[165,1344,1345],{},"Lichtbogen-\u002FBrandgefahr",[150,1347,1348,1353],{},[165,1349,1350],{},[19,1351,1352],{},"Abzweigdosen ohne Deckel",[165,1354,1355],{},"Berührungsschutz fehlt",[150,1357,1358,1363],{},[165,1359,1360],{},[19,1361,1362],{},"Badezimmer-Steckdose in Zone 0 oder 1",[165,1364,1365],{},"Lebensgefahr, auch unter Part 8 verboten",[72,1367,1369],{"id":1368},"sicherheitsrelevante-mindestanforderungen","Sicherheitsrelevante Mindestanforderungen:",[15,1371,1372],{},"Auch unter Part 8 muss gewährleistet sein:",[95,1374,1375,1381,1387,1393],{},[98,1376,1377,1380],{},[19,1378,1379],{},"Ausreichender Querschnitt"," für die tatsächliche Belastung (kein überlastetes 0,75 mm²-Kabel).",[98,1382,1383,1386],{},[19,1384,1385],{},"Funktionierende Sicherungen"," (keine „gebrückten\" Sicherungen).",[98,1388,1389,1392],{},[19,1390,1391],{},"Erdung des Hauptverteilers"," (Verbindung zur Erdungselektrode).",[98,1394,1395,1398],{},[19,1396,1397],{},"Zugänglichkeit"," des Verteilerkastens.",[24,1400],{},[27,1402,1404],{"id":1403},"periodische-kontrolle","Periodische Kontrolle",[72,1406,1408],{"id":1407},"alle-25-jahre-pflicht","Alle 25 Jahre Pflicht",[15,1410,1411,1412,1415],{},"Bestehende Installationen unter Part 8 müssen alle ",[19,1413,1414],{},"25 Jahre"," einer periodischen Kontrolle durch einen zugelassenen Kontrollorganismus unterzogen werden.",[72,1417,1419],{"id":1418},"bei-eigentümerwechsel","Bei Eigentümerwechsel",[15,1421,1422,1423,1426],{},"Bei ",[19,1424,1425],{},"Verkauf einer Immobilie"," ist eine gültige Kontrollbescheinigung (weniger als 25 Jahre alt) Pflicht. Liegt keine vor, muss vor dem Verkauf eine Kontrolle durchgeführt werden.",[50,1428,1429],{},[15,1430,1431,1434,1435,1438],{},[19,1432,1433],{},"18-Monate-Frist (Art. 8.4.2.2):"," Bei Kauf einer Immobilie mit negativem Prüfbericht hat der Käufer ",[19,1436,1437],{},"18 Monate"," ab Kaufdatum, um die Mängel zu beheben und eine Nachkontrolle durchführen zu lassen.",[72,1440,1442],{"id":1441},"was-wird-bei-der-periodischen-kontrolle-geprüft","Was wird bei der periodischen Kontrolle geprüft?",[144,1444,1445,1455],{},[147,1446,1447],{},[150,1448,1449,1452],{},[153,1450,1451],{},"Prüfpunkt",[153,1453,1454],{},"Beurteilung",[160,1456,1457,1465,1473,1480,1488,1496,1504],{},[150,1458,1459,1462],{},[165,1460,1461],{},"Sichtprüfung der Kabel und Verbindungen",[165,1463,1464],{},"Beschädigung, Überhitzung",[150,1466,1467,1470],{},[165,1468,1469],{},"Erdungswiderstand messen",[165,1471,1472],{},"≤ 30 Ω (regulatorische Schwelle gemäß Art. 4.2.4.3b; darüber zusätzliche Schutzmaßnahmen nötig)",[150,1474,1475,1478],{},[165,1476,1477],{},"Isolationswiderstand messen",[165,1479,544],{},[150,1481,1482,1485],{},[165,1483,1484],{},"RCD-Test (falls vorhanden)",[165,1486,1487],{},"Auslösezeit und -strom",[150,1489,1490,1493],{},[165,1491,1492],{},"Kurzschlussschutz prüfen",[165,1494,1495],{},"Sicherungen \u002F MCBs vorhanden",[150,1497,1498,1501],{},[165,1499,1500],{},"Schutz gegen direktes Berühren",[165,1502,1503],{},"Abdeckungen, IP-Schutz",[150,1505,1506,1509],{},[165,1507,1508],{},"Dokumentation",[165,1510,1511],{},"Eindrahtschema + Situationsplan vorhanden?",[50,1513,1514],{},[15,1515,1516,1518,1519,1522,1523,1526],{},[19,1517,1170],{}," Auch unter Part 8 müssen ein ",[19,1520,1521],{},"Eindrahtschema"," und ein ",[19,1524,1525],{},"Situationsplan"," vorhanden sein — auch wenn diese nachträglich erstellt werden müssen.",[24,1528],{},[27,1530,1532],{"id":1531},"die-kontaminationsregel-bei-teilrenovierung","Die Kontaminationsregel bei Teilrenovierung",[15,1534,1535,1536,272],{},"Ein besonders wichtiger Aspekt bei Altbauten: die sogenannte ",[19,1537,1538],{},"Kontaminationsregel",[72,1540,1542],{"id":1541},"wie-funktioniert-sie","Wie funktioniert sie?",[15,1544,1545,1546,1549],{},"Wenn Sie einen Teil Ihrer Installation ",[19,1547,1548],{},"wesentlich verändern"," (z. B. neue Stromkreise hinzufügen), gilt:",[615,1551,1552,1559,1565],{},[98,1553,1554,1555,1558],{},"Der ",[19,1556,1557],{},"neue Teil"," muss vollständig dem aktuellen AREI entsprechen.",[98,1560,1554,1561,1564],{},[19,1562,1563],{},"bestehende Teil"," wird weiterhin nach Part 8 beurteilt.",[98,1566,1567,1570],{},[19,1568,1569],{},"ABER:"," Wenn der neue Teil den bestehenden Teil „kontaminiert\" (z. B. neue Kabel im selben Verteiler), kann der Kontrolleur entscheiden, dass der gesamte Verteiler dem aktuellen AREI entsprechen muss.",[72,1572,1574],{"id":1573},"praktische-konsequenz","Praktische Konsequenz:",[95,1576,1577,1584,1591],{},[98,1578,1579,1580,1583],{},"Planen Sie Renovierungen so, dass neue und alte Teile ",[19,1581,1582],{},"klar getrennt"," sind.",[98,1585,1586,1587,1590],{},"Idealerweise einen ",[19,1588,1589],{},"separaten Unterverteiler"," für neue Stromkreise.",[98,1592,1593],{},"Dokumentieren Sie genau, was alt und was neu ist.",[24,1595],{},[27,1597,1599],{"id":1598},"empfehlung-schrittweise-modernisierung","Empfehlung: Schrittweise Modernisierung",[15,1601,1602,1603,1606],{},"Auch wenn Part 8 Abweichungen toleriert, empfiehlt sich eine ",[19,1604,1605],{},"schrittweise Modernisierung",":",[72,1608,1610],{"id":1609},"priorität-1-sicherheitskritisch","Priorität 1 (Sicherheitskritisch)",[95,1612,1613,1616,1619,1622],{},[98,1614,1615],{},"300 mA Haupt-RCD nachrüsten (falls nicht vorhanden)",[98,1617,1618],{},"Beschädigte Kabel ersetzen",[98,1620,1621],{},"Lose Verbindungen beheben",[98,1623,1624],{},"Erdung prüfen und ggf. verbessern",[72,1626,1628],{"id":1627},"priorität-2-empfohlen","Priorität 2 (Empfohlen)",[95,1630,1631,1634,1637],{},[98,1632,1633],{},"30 mA Gruppen-RCDs für Badezimmer und Küche",[98,1635,1636],{},"Alte Schmelzsicherungen durch MCBs ersetzen",[98,1638,1639],{},"SPD Typ 2 nachrüsten",[72,1641,1643],{"id":1642},"priorität-3-komfort-zukunftssicherheit","Priorität 3 (Komfort + Zukunftssicherheit)",[95,1645,1646,1649,1652],{},[98,1647,1648],{},"Verteiler modernisieren (mehr Reihen, Beschriftung)",[98,1650,1651],{},"Steckdosen mit Erdung nachrüsten",[98,1653,1654],{},"Vorbereitung für Wallbox \u002F PV-Anlage",[72,1656,1658],{"id":1657},"kostenorientierung","Kostenorientierung",[144,1660,1661,1671],{},[147,1662,1663],{},[150,1664,1665,1668],{},[153,1666,1667],{},"Maßnahme",[153,1669,1670],{},"Geschätzte Kosten",[160,1672,1673,1680,1687,1694,1701,1708],{},[150,1674,1675,1678],{},[165,1676,1677],{},"300 mA Haupt-RCD nachrüsten",[165,1679,744],{},[150,1681,1682,1685],{},[165,1683,1684],{},"30 mA Gruppen-RCD (pro Stück)",[165,1686,752],{},[150,1688,1689,1692],{},[165,1690,1691],{},"SPD Typ 2",[165,1693,760],{},[150,1695,1696,1699],{},[165,1697,1698],{},"MCB-Set (10 Stück)",[165,1700,768],{},[150,1702,1703,1706],{},[165,1704,1705],{},"Neuer 4-Reihen-Verteiler (komplett)",[165,1707,776],{},[150,1709,1710,1713],{},[165,1711,1712],{},"Vollständige Neuverkabelung (EFH)",[165,1714,784],{},[24,1716],{},[27,1718,1720],{"id":1719},"zusammenfassung","Zusammenfassung",[144,1722,1723,1733],{},[147,1724,1725],{},[150,1726,1727,1730],{},[153,1728,1729],{},"Frage",[153,1731,1732],{},"Antwort",[160,1734,1735,1743,1751,1759,1767],{},[150,1736,1737,1740],{},[165,1738,1739],{},"Muss mein Altbau dem aktuellen AREI entsprechen?",[165,1741,1742],{},"Nicht vollständig, Part 8 erlaubt Abweichungen",[150,1744,1745,1748],{},[165,1746,1747],{},"Brauche ich einen 30 mA RCD?",[165,1749,1750],{},"Unter Part 8 nicht Pflicht, aber dringend empfohlen",[150,1752,1753,1756],{},[165,1754,1755],{},"Sind alte Steckdosen ohne Erdung erlaubt?",[165,1757,1758],{},"Unter Bedingungen ja (kein Badezimmer, keine Schutzklasse-I-Geräte)",[150,1760,1761,1764],{},[165,1762,1763],{},"Wie oft muss kontrolliert werden?",[165,1765,1766],{},"Alle 25 Jahre + bei Eigentümerwechsel",[150,1768,1769,1772],{},[165,1770,1771],{},"Was passiert bei Teilrenovierung?",[165,1773,1774],{},"Neuer Teil = aktuelles AREI, alter Teil = Part 8 (Kontaminationsregel beachten)",[24,1776],{},[27,1778,1780],{"id":1779},"verwandte-artikel","Verwandte Artikel",[95,1782,1783,1789,1795,1801],{},[98,1784,1785],{},[856,1786,1788],{"href":1787},"\u002Fde\u002Fblog\u002Felektrische-kontrolle","Elektrische Kontrolle in Belgien: Was wird geprüft?",[98,1790,1791],{},[856,1792,1794],{"href":1793},"\u002Fde\u002Fblog\u002Farei-2026-aenderungen","Was ändert sich mit dem AREI 2026?",[98,1796,1797],{},[856,1798,1800],{"href":1799},"\u002Fde\u002Fblog\u002Fpreflex-vs-freie-verlegung","Preflex vs. freie Verlegung",[98,1802,1803],{},[856,1804,1806],{"href":1805},"\u002Fde\u002Fblog\u002Fschaltschrank-planen-aufbau","Schaltschrank planen",[24,1808],{},[15,1810,1811],{},[883,1812,1813,1814,1816,1817],{},"Auch für Altbauten erstellt ",[19,1815,888],{}," normgerechte Eindrahtschemas und Situationspläne — die Pflichtdokumente für jede Kontrolle. Dokumentieren Sie Ihre Installation jetzt digital. ",[856,1818,1819],{"href":892},"Kostenlos starten →",{"title":895,"searchDepth":896,"depth":896,"links":1821},[1822,1823,1828,1836,1840,1845,1849,1855,1856],{"id":976,"depth":896,"text":977},{"id":1008,"depth":896,"text":1009,"children":1824},[1825,1826,1827],{"id":1019,"depth":902,"text":1020},{"id":1026,"depth":902,"text":1027},{"id":1037,"depth":902,"text":1038},{"id":1077,"depth":896,"text":1078,"children":1829},[1830,1831,1832,1833,1834,1835],{"id":1084,"depth":902,"text":1085},{"id":1126,"depth":902,"text":1127},{"id":1178,"depth":902,"text":1179},{"id":1215,"depth":902,"text":1216},{"id":1225,"depth":902,"text":1226},{"id":1250,"depth":902,"text":1251},{"id":1259,"depth":896,"text":1260,"children":1837},[1838,1839],{"id":1270,"depth":902,"text":1271},{"id":1368,"depth":902,"text":1369},{"id":1403,"depth":896,"text":1404,"children":1841},[1842,1843,1844],{"id":1407,"depth":902,"text":1408},{"id":1418,"depth":902,"text":1419},{"id":1441,"depth":902,"text":1442},{"id":1531,"depth":896,"text":1532,"children":1846},[1847,1848],{"id":1541,"depth":902,"text":1542},{"id":1573,"depth":902,"text":1574},{"id":1598,"depth":896,"text":1599,"children":1850},[1851,1852,1853,1854],{"id":1609,"depth":902,"text":1610},{"id":1627,"depth":902,"text":1628},{"id":1642,"depth":902,"text":1643},{"id":1657,"depth":902,"text":1658},{"id":1719,"depth":896,"text":1720},{"id":1779,"depth":896,"text":1780},"Was bei älteren Elektroinstallationen in Belgien gilt. AREI Part 8 erklärt: erlaubte Abweichungen, periodische Kontrolle und Tipps zur schrittweisen Modernisierung.","de",{},"\u002Fblog\u002Fold-building-arei-part8.de",{"title":959,"description":1857},"altbau-arei-part-8","blog\u002Fold-building-arei-part8.de",[1865,1866,1867,1868,1869,1870,1871],"altbau","AREI","Part 8","bestandsinstallation","renovierung","kontrolle","periodisch","WDz2A426D1LVad7bgEuHPyefaCr9JZdCzjAxBg5Z9lE",{"id":1874,"title":1875,"articleId":6,"body":1876,"category":934,"date":935,"description":2772,"extension":937,"lastUpdated":938,"locale":2773,"meta":2774,"navigation":941,"path":2775,"publishDate":935,"readTime":943,"refreshInterval":944,"seo":2776,"slug":2777,"stem":2778,"tags":2779,"__hash__":2785},"blog\u002Fblog\u002Fold-building-arei-part8.en.md","Old Buildings and AREI Part 8: Special Rules for Existing Installations",{"type":8,"value":1877,"toc":2735},[1878,1881,1887,1889,1893,1900,1911,1919,1921,1925,1932,1936,1939,1943,1950,1954,1980,1988,1990,1994,1997,2001,2038,2042,2078,2089,2093,2096,2125,2129,2135,2139,2160,2164,2167,2169,2173,2180,2184,2278,2282,2285,2311,2313,2317,2321,2328,2332,2339,2351,2355,2424,2438,2440,2444,2450,2454,2461,2482,2486,2504,2506,2510,2517,2521,2535,2539,2550,2554,2565,2569,2631,2633,2637,2690,2692,2696,2722,2724],[11,1879,1875],{"id":1880},"old-buildings-and-arei-part-8-special-rules-for-existing-installations",[15,1882,1883,1884,1886],{},"Not every electrical installation in Belgium needs to comply with the latest AREI\u002FRGIE regulations. For older buildings, ",[19,1885,970],{}," provides a dedicated set of rules that tolerates certain deviations from the current standard — as long as no immediate danger exists. This article explains when Part 8 applies, what is permitted, and where the limits lie.",[24,1888],{},[27,1890,1892],{"id":1891},"what-is-part-8","What Is Part 8?",[15,1894,1895,1896,1899],{},"Part 8 of the AREI (Algemeen Reglement op de Elektrische Installaties \u002F Règlement Général sur les Installations Électriques) is a ",[19,1897,1898],{},"special regulation for existing installations"," that were constructed and approved before the current AREI came into force.",[15,1901,1902,1903,1906,1907,1910],{},"The basic principle: as long as an installation functions ",[19,1904,1905],{},"safely"," and poses ",[19,1908,1909],{},"no immediate danger",", it does not need to be fully brought up to the latest standards — even if it does not meet all current requirements.",[50,1912,1913],{},[15,1914,1915,1918],{},[19,1916,1917],{},"Important:"," Part 8 is not a free pass. It clearly defines which deviations are tolerated and which are not.",[24,1920],{},[27,1922,1924],{"id":1923},"when-does-part-8-apply","When Does Part 8 Apply?",[15,1926,1927,1928,1931],{},"Part 8 applies to installations that meet ",[19,1929,1930],{},"one"," of the following conditions:",[72,1933,1935],{"id":1934},"condition-1-installation-before-01101981","Condition 1: Installation Before 01.10.1981",[15,1937,1938],{},"Installations constructed before 1 October 1981 (the date the original AREI came into force) fall under Part 8 by default.",[72,1940,1942],{"id":1941},"condition-2-approved-under-the-old-arei","Condition 2: Approved Under the Old AREI",[15,1944,1945,1946,1949],{},"Installations that were approved under a previous version of the AREI and have ",[19,1947,1948],{},"not been substantially modified"," since the last approval.",[72,1951,1953],{"id":1952},"what-counts-as-a-substantial-modification","What Counts as a \"Substantial Modification\"?",[95,1955,1956,1962,1968,1974],{},[98,1957,1958,1959],{},"Adding ",[19,1960,1961],{},"new circuits",[98,1963,1964,1965],{},"Expanding the ",[19,1966,1967],{},"distribution board",[98,1969,1970,1971],{},"Modifying the ",[19,1972,1973],{},"metering installation",[98,1975,1976,1977],{},"Extensive ",[19,1978,1979],{},"rewiring",[50,1981,1982],{},[15,1983,1984,1987],{},[19,1985,1986],{},"Note:"," Small changes such as replacing a socket outlet or switch do NOT count as a substantial modification.",[24,1989],{},[27,1991,1993],{"id":1992},"what-is-permitted-under-part-8-tolerated-deviations","What Is Permitted Under Part 8? (Tolerated Deviations)",[15,1995,1996],{},"The following points deviate from the current AREI but are tolerated under Part 8 during inspection:",[72,1998,2000],{"id":1999},"_1-old-cable-types","1. Old Cable Types",[144,2002,2003,2013],{},[147,2004,2005],{},[150,2006,2007,2010],{},[153,2008,2009],{},"Current AREI",[153,2011,2012],{},"Part 8 tolerates",[160,2014,2015,2022,2030],{},[150,2016,2017,2019],{},[165,2018,1104],{},[165,2020,2021],{},"VOB cables in old conduits",[150,2023,2024,2027],{},[165,2025,2026],{},"Cca fire reaction class",[165,2028,2029],{},"Older cable types without CPR classification",[150,2031,2032,2035],{},[165,2033,2034],{},"Minimum cross-section 2.5 mm² for sockets",[165,2036,2037],{},"Minimum 1 mm² with max. 6A fuse or 10A MCB (Art. 8.2.1 Nr. 5)",[72,2039,2041],{"id":2040},"_2-residual-current-devices-rcd","2. Residual Current Devices (RCD)",[144,2043,2044,2052],{},[147,2045,2046],{},[150,2047,2048,2050],{},[153,2049,2009],{},[153,2051,2012],{},[160,2053,2054,2062,2070],{},[150,2055,2056,2059],{},[165,2057,2058],{},"30 mA RCD per socket circuit",[165,2060,2061],{},"No 30 mA RCD needed (only 300 mA main RCD)",[150,2063,2064,2067],{},[165,2065,2066],{},"30 mA RCD mandatory for bathroom",[165,2068,2069],{},"Remains mandatory (not covered by the Part 8 deviation, Art. 4.2.4.3 b No. 3 \u002F Art. 7.1.4.3)",[150,2071,2072,2075],{},[165,2073,2074],{},"Max. 8 circuits per RCD",[165,2076,2077],{},"More circuits permitted",[50,2079,2080],{},[15,2081,2082,2084,2085,2088],{},[19,2083,1986],{}," Even under Part 8, a ",[19,2086,2087],{},"300 mA main RCD"," is recommended and often required by the grid operator when a new meter is installed.",[72,2090,2092],{"id":2091},"_3-socket-outlets-without-earth-contact","3. Socket Outlets Without Earth Contact",[15,2094,2095],{},"Old socket outlets (type C, without earth pin) are tolerated under Part 8, provided that:",[95,2097,2098,2105,2112,2122],{},[98,2099,2100,2101,2104],{},"The socket is protected by a ",[19,2102,2103],{},"high or very high sensitivity RCD"," (max. 30 mA) (Art. 8.2.1 No. 6 letter b).",[98,2106,2107,2108,2111],{},"No ",[19,2109,2110],{},"Class I"," appliances (with metal housing) are connected.",[98,2113,2114,2115,2118,2119,272],{},"The socket is not in the ",[19,2116,2117],{},"bathroom"," or in a ",[19,2120,2121],{},"damp location",[98,2123,2124],{},"The circuit is otherwise intact.",[72,2126,2128],{"id":2127},"_4-no-spd-surge-protection","4. No SPD (Surge Protection)",[15,2130,2131,2132,272],{},"The current AREI requires a Type 2 SPD (Surge Protection Device) for new installations. Under Part 8, this is ",[19,2133,2134],{},"not required",[72,2136,2138],{"id":2137},"_5-old-distribution-technology","5. Old Distribution Technology",[95,2140,2141,2147,2153],{},[98,2142,2143,2146],{},[19,2144,2145],{},"Fuses"," instead of MCBs are permitted.",[98,2148,2149,2152],{},[19,2150,2151],{},"Screw-type fuses"," (Diazed) are tolerated.",[98,2154,2155,2156,2159],{},"Missing ",[19,2157,2158],{},"labelling"," is noted as a deficiency but does not cause a failure.",[72,2161,2163],{"id":2162},"_6-no-fire-reaction-classification-of-cables","6. No Fire Reaction Classification of Cables",[15,2165,2166],{},"Cables without CPR classification (installed before 2017) are tolerated, as the CPR regulation only applies from July 2017 for new installations.",[24,2168],{},[27,2170,2172],{"id":2171},"what-is-not-permitted-even-under-part-8","What Is NOT Permitted (Even Under Part 8)?",[15,2174,2175,2176,2179],{},"Certain conditions are ",[19,2177,2178],{},"never tolerated",", regardless of the installation's age:",[72,2181,2183],{"id":2182},"absolutely-impermissible","Absolutely Impermissible:",[144,2185,2186,2196],{},[147,2187,2188],{},[150,2189,2190,2193],{},[153,2191,2192],{},"Condition",[153,2194,2195],{},"Why?",[160,2197,2198,2208,2218,2228,2238,2248,2258,2268],{},[150,2199,2200,2205],{},[165,2201,2202],{},[19,2203,2204],{},"Bare or damaged cables",[165,2206,2207],{},"Immediate electrocution risk",[150,2209,2210,2215],{},[165,2211,2212],{},[19,2213,2214],{},"Complete absence of earthing",[165,2216,2217],{},"No protection in case of insulation fault",[150,2219,2220,2225],{},[165,2221,2222],{},[19,2223,2224],{},"Water in contact with electrics",[165,2226,2227],{},"Danger to life",[150,2229,2230,2235],{},[165,2231,2232],{},[19,2233,2234],{},"Accessible live parts",[165,2236,2237],{},"Direct contact risk",[150,2239,2240,2245],{},[165,2241,2242],{},[19,2243,2244],{},"Overheated cables or connections",[165,2246,2247],{},"Fire risk",[150,2249,2250,2255],{},[165,2251,2252],{},[19,2253,2254],{},"Loose connections in junction boxes",[165,2256,2257],{},"Arc\u002Ffire risk",[150,2259,2260,2265],{},[165,2261,2262],{},[19,2263,2264],{},"Junction boxes without covers",[165,2266,2267],{},"Contact protection missing",[150,2269,2270,2275],{},[165,2271,2272],{},[19,2273,2274],{},"Bathroom socket in zone 0 or 1",[165,2276,2277],{},"Danger to life, prohibited even under Part 8",[72,2279,2281],{"id":2280},"safety-related-minimum-requirements","Safety-Related Minimum Requirements:",[15,2283,2284],{},"Even under Part 8, the following must be ensured:",[95,2286,2287,2293,2299,2305],{},[98,2288,2289,2292],{},[19,2290,2291],{},"Adequate cross-section"," for the actual load (no overloaded 0.75 mm² cable).",[98,2294,2295,2298],{},[19,2296,2297],{},"Functioning fuses"," (no \"bridged\" fuses).",[98,2300,2301,2304],{},[19,2302,2303],{},"Earthing of the main board"," (connection to earth electrode).",[98,2306,2307,2310],{},[19,2308,2309],{},"Accessibility"," of the distribution board.",[24,2312],{},[27,2314,2316],{"id":2315},"periodic-inspection","Periodic Inspection",[72,2318,2320],{"id":2319},"every-25-years-mandatory","Every 25 Years Mandatory",[15,2322,2323,2324,2327],{},"Existing installations under Part 8 must undergo a periodic inspection every ",[19,2325,2326],{},"25 years"," by an approved control body.",[72,2329,2331],{"id":2330},"on-change-of-ownership","On Change of Ownership",[15,2333,2334,2335,2338],{},"When ",[19,2336,2337],{},"selling a property",", a valid inspection certificate (less than 25 years old) is mandatory. If none exists, an inspection must be carried out before the sale.",[50,2340,2341],{},[15,2342,2343,2346,2347,2350],{},[19,2344,2345],{},"18-month deadline (Art. 8.4.2.2):"," When purchasing a property with a negative inspection report, the buyer has ",[19,2348,2349],{},"18 months"," from the purchase date to remedy the defects and have a re-inspection carried out.",[72,2352,2354],{"id":2353},"what-is-checked-during-the-periodic-inspection","What Is Checked During the Periodic Inspection?",[144,2356,2357,2367],{},[147,2358,2359],{},[150,2360,2361,2364],{},[153,2362,2363],{},"Inspection Point",[153,2365,2366],{},"Assessment",[160,2368,2369,2377,2385,2393,2401,2409,2417],{},[150,2370,2371,2374],{},[165,2372,2373],{},"Visual inspection of cables and connections",[165,2375,2376],{},"Damage, overheating",[150,2378,2379,2382],{},[165,2380,2381],{},"Earth resistance measurement",[165,2383,2384],{},"≤ 30 Ohm (regulatory threshold per Art. 4.2.4.3b; above this, additional protective measures required)",[150,2386,2387,2390],{},[165,2388,2389],{},"Insulation resistance measurement",[165,2391,2392],{},"> 0.5 MOhm",[150,2394,2395,2398],{},[165,2396,2397],{},"RCD test (if present)",[165,2399,2400],{},"Trip time and current",[150,2402,2403,2406],{},[165,2404,2405],{},"Short-circuit protection check",[165,2407,2408],{},"Fuses \u002F MCBs present",[150,2410,2411,2414],{},[165,2412,2413],{},"Protection against direct contact",[165,2415,2416],{},"Covers, IP protection",[150,2418,2419,2421],{},[165,2420,573],{},[165,2422,2423],{},"Single-line diagram + situation plan present?",[50,2425,2426],{},[15,2427,2428,2084,2430,2433,2434,2437],{},[19,2429,1986],{},[19,2431,2432],{},"single-line diagram"," and a ",[19,2435,2436],{},"situation plan"," must be available — even if they need to be created retrospectively.",[24,2439],{},[27,2441,2443],{"id":2442},"the-contamination-rule-for-partial-renovations","The Contamination Rule for Partial Renovations",[15,2445,2446,2447,272],{},"A particularly important aspect for old buildings: the so-called ",[19,2448,2449],{},"contamination rule",[72,2451,2453],{"id":2452},"how-does-it-work","How Does It Work?",[15,2455,2456,2457,2460],{},"When you ",[19,2458,2459],{},"substantially modify"," part of your installation (e.g., adding new circuits):",[615,2462,2463,2470,2476],{},[98,2464,2465,2466,2469],{},"The ",[19,2467,2468],{},"new part"," must fully comply with the current AREI.",[98,2471,2465,2472,2475],{},[19,2473,2474],{},"existing part"," continues to be assessed under Part 8.",[98,2477,2478,2481],{},[19,2479,2480],{},"BUT:"," If the new part \"contaminates\" the existing part (e.g., new cables in the same distribution board), the inspector may decide that the entire board must comply with the current AREI.",[72,2483,2485],{"id":2484},"practical-consequences","Practical Consequences:",[95,2487,2488,2494,2501],{},[98,2489,2490,2491,272],{},"Plan renovations so that new and old parts are ",[19,2492,2493],{},"clearly separated",[98,2495,2496,2497,2500],{},"Ideally, use a ",[19,2498,2499],{},"separate sub-board"," for new circuits.",[98,2502,2503],{},"Document precisely what is old and what is new.",[24,2505],{},[27,2507,2509],{"id":2508},"recommendation-gradual-modernisation","Recommendation: Gradual Modernisation",[15,2511,2512,2513,2516],{},"Even though Part 8 tolerates deviations, ",[19,2514,2515],{},"gradual modernisation"," is recommended:",[72,2518,2520],{"id":2519},"priority-1-safety-critical","Priority 1 (Safety-Critical)",[95,2522,2523,2526,2529,2532],{},[98,2524,2525],{},"Retrofit a 300 mA main RCD (if not present)",[98,2527,2528],{},"Replace damaged cables",[98,2530,2531],{},"Fix loose connections",[98,2533,2534],{},"Check and improve earthing if necessary",[72,2536,2538],{"id":2537},"priority-2-recommended","Priority 2 (Recommended)",[95,2540,2541,2544,2547],{},[98,2542,2543],{},"30 mA group RCDs for bathroom and kitchen",[98,2545,2546],{},"Replace old fuses with MCBs",[98,2548,2549],{},"Retrofit SPD Type 2",[72,2551,2553],{"id":2552},"priority-3-comfort-future-proofing","Priority 3 (Comfort + Future-Proofing)",[95,2555,2556,2559,2562],{},[98,2557,2558],{},"Modernise the board (more rows, labelling)",[98,2560,2561],{},"Retrofit socket outlets with earth",[98,2563,2564],{},"Preparation for EV charger \u002F PV system",[72,2566,2568],{"id":2567},"cost-orientation","Cost Orientation",[144,2570,2571,2581],{},[147,2572,2573],{},[150,2574,2575,2578],{},[153,2576,2577],{},"Measure",[153,2579,2580],{},"Estimated Cost",[160,2582,2583,2591,2599,2607,2615,2623],{},[150,2584,2585,2588],{},[165,2586,2587],{},"Retrofit 300 mA main RCD",[165,2589,2590],{},"EUR 150–300",[150,2592,2593,2596],{},[165,2594,2595],{},"30 mA group RCD (each)",[165,2597,2598],{},"EUR 80–150",[150,2600,2601,2604],{},[165,2602,2603],{},"SPD Type 2",[165,2605,2606],{},"EUR 100–250",[150,2608,2609,2612],{},[165,2610,2611],{},"MCB set (10 pieces)",[165,2613,2614],{},"EUR 50–100",[150,2616,2617,2620],{},[165,2618,2619],{},"New 4-row board (complete)",[165,2621,2622],{},"EUR 500–1,500",[150,2624,2625,2628],{},[165,2626,2627],{},"Complete rewiring (house)",[165,2629,2630],{},"EUR 5,000–15,000",[24,2632],{},[27,2634,2636],{"id":2635},"summary","Summary",[144,2638,2639,2648],{},[147,2640,2641],{},[150,2642,2643,2645],{},[153,2644,799],{},[153,2646,2647],{},"Answer",[160,2649,2650,2658,2666,2674,2682],{},[150,2651,2652,2655],{},[165,2653,2654],{},"Does my old building need to comply with the current AREI?",[165,2656,2657],{},"Not fully, Part 8 permits deviations",[150,2659,2660,2663],{},[165,2661,2662],{},"Do I need a 30 mA RCD?",[165,2664,2665],{},"Not mandatory under Part 8, but strongly recommended",[150,2667,2668,2671],{},[165,2669,2670],{},"Are old sockets without earth permitted?",[165,2672,2673],{},"Under conditions yes (no bathroom, no Class I appliances)",[150,2675,2676,2679],{},[165,2677,2678],{},"How often must inspections take place?",[165,2680,2681],{},"Every 25 years + on change of ownership",[150,2683,2684,2687],{},[165,2685,2686],{},"What about partial renovation?",[165,2688,2689],{},"New part = current AREI, old part = Part 8 (contamination rule applies)",[24,2691],{},[27,2693,2695],{"id":2694},"related-articles","Related Articles",[95,2697,2698,2704,2710,2716],{},[98,2699,2700],{},[856,2701,2703],{"href":2702},"\u002Fen\u002Fblog\u002Felectrical-inspection","Electrical Inspection in Belgium: What Is Checked?",[98,2705,2706],{},[856,2707,2709],{"href":2708},"\u002Fen\u002Fblog\u002Farei-2026-changes","What Changes with the AREI 2026?",[98,2711,2712],{},[856,2713,2715],{"href":2714},"\u002Fen\u002Fblog\u002Fpreflex-vs-open-wiring","Preflex vs. Open Wiring",[98,2717,2718],{},[856,2719,2721],{"href":2720},"\u002Fen\u002Fblog\u002Fdistribution-board-planning-guide","Distribution Board Planning",[24,2723],{},[15,2725,2726],{},[883,2727,2728,2729,2731,2732],{},"For older buildings, ",[19,2730,888],{}," helps build the single-line diagram and situation plan digitally. The self-check is advisory; have the documents and applicable derogations reviewed professionally. ",[856,2733,2734],{"href":892},"Start for free →",{"title":895,"searchDepth":896,"depth":896,"links":2736},[2737,2738,2743,2751,2755,2760,2764,2770,2771],{"id":1891,"depth":896,"text":1892},{"id":1923,"depth":896,"text":1924,"children":2739},[2740,2741,2742],{"id":1934,"depth":902,"text":1935},{"id":1941,"depth":902,"text":1942},{"id":1952,"depth":902,"text":1953},{"id":1992,"depth":896,"text":1993,"children":2744},[2745,2746,2747,2748,2749,2750],{"id":1999,"depth":902,"text":2000},{"id":2040,"depth":902,"text":2041},{"id":2091,"depth":902,"text":2092},{"id":2127,"depth":902,"text":2128},{"id":2137,"depth":902,"text":2138},{"id":2162,"depth":902,"text":2163},{"id":2171,"depth":896,"text":2172,"children":2752},[2753,2754],{"id":2182,"depth":902,"text":2183},{"id":2280,"depth":902,"text":2281},{"id":2315,"depth":896,"text":2316,"children":2756},[2757,2758,2759],{"id":2319,"depth":902,"text":2320},{"id":2330,"depth":902,"text":2331},{"id":2353,"depth":902,"text":2354},{"id":2442,"depth":896,"text":2443,"children":2761},[2762,2763],{"id":2452,"depth":902,"text":2453},{"id":2484,"depth":902,"text":2485},{"id":2508,"depth":896,"text":2509,"children":2765},[2766,2767,2768,2769],{"id":2519,"depth":902,"text":2520},{"id":2537,"depth":902,"text":2538},{"id":2552,"depth":902,"text":2553},{"id":2567,"depth":902,"text":2568},{"id":2635,"depth":896,"text":2636},{"id":2694,"depth":896,"text":2695},"What applies to older electrical installations in Belgium. AREI Part 8 explained: permitted deviations, periodic inspection, and tips for gradual modernisation.","en",{},"\u002Fblog\u002Fold-building-arei-part8.en",{"title":1875,"description":2772},"old-building-arei-part-8","blog\u002Fold-building-arei-part8.en",[2780,1866,1867,2781,2782,2783,2784],"old building","existing installation","renovation","inspection","periodic","3mUSkcLD_yqcR9pr9ReIxXoediuq8vIB4IlyOuBNzg4",{"id":4,"title":5,"articleId":6,"body":2787,"category":934,"date":935,"description":936,"extension":937,"lastUpdated":938,"locale":939,"meta":3430,"navigation":941,"path":942,"publishDate":935,"readTime":943,"refreshInterval":944,"seo":3431,"slug":946,"stem":947,"tags":3432,"__hash__":955},{"type":8,"value":2788,"toc":3393},[2789,2791,2795,2797,2799,2803,2809,2815,2817,2819,2823,2825,2827,2829,2833,2835,2853,2859,2861,2863,2865,2867,2897,2899,2929,2937,2939,2941,2959,2961,2965,2967,2981,2983,2985,2987,2989,2993,2995,3071,3073,3075,3093,3095,3097,3099,3103,3105,3109,3117,3119,3173,3183,3185,3187,3191,3193,3197,3211,3213,3225,3227,3229,3233,3235,3245,3247,3255,3257,3265,3267,3315,3317,3319,3361,3363,3365,3383,3385],[11,2790,5],{"id":13},[15,2792,17,2793,22],{},[19,2794,21],{},[24,2796],{},[27,2798,30],{"id":29},[15,2800,33,2801,37],{},[19,2802,36],{},[15,2804,40,2805,44,2807,48],{},[19,2806,43],{},[19,2808,47],{},[50,2810,2811],{},[15,2812,2813,57],{},[19,2814,56],{},[24,2816],{},[27,2818,63],{"id":62},[15,2820,66,2821,70],{},[19,2822,69],{},[72,2824,75],{"id":74},[15,2826,78],{},[72,2828,82],{"id":81},[15,2830,85,2831,89],{},[19,2832,88],{},[72,2834,93],{"id":92},[95,2836,2837,2841,2845,2849],{},[98,2838,100,2839],{},[19,2840,103],{},[98,2842,106,2843],{},[19,2844,109],{},[98,2846,112,2847],{},[19,2848,115],{},[98,2850,2851,121],{},[19,2852,120],{},[50,2854,2855],{},[15,2856,2857,129],{},[19,2858,128],{},[24,2860],{},[27,2862,135],{"id":134},[15,2864,138],{},[72,2866,142],{"id":141},[144,2868,2869,2877],{},[147,2870,2871],{},[150,2872,2873,2875],{},[153,2874,155],{},[153,2876,158],{},[160,2878,2879,2885,2891],{},[150,2880,2881,2883],{},[165,2882,167],{},[165,2884,170],{},[150,2886,2887,2889],{},[165,2888,175],{},[165,2890,178],{},[150,2892,2893,2895],{},[165,2894,183],{},[165,2896,186],{},[72,2898,190],{"id":189},[144,2900,2901,2909],{},[147,2902,2903],{},[150,2904,2905,2907],{},[153,2906,155],{},[153,2908,158],{},[160,2910,2911,2917,2923],{},[150,2912,2913,2915],{},[165,2914,207],{},[165,2916,210],{},[150,2918,2919,2921],{},[165,2920,215],{},[165,2922,218],{},[150,2924,2925,2927],{},[165,2926,223],{},[165,2928,226],{},[50,2930,2931],{},[15,2932,2933,234,2935,238],{},[19,2934,233],{},[19,2936,237],{},[72,2938,242],{"id":241},[15,2940,245],{},[95,2942,2943,2947,2951,2957],{},[98,2944,250,2945,254],{},[19,2946,253],{},[98,2948,257,2949,261],{},[19,2950,260],{},[98,2952,264,2953,268,2955,272],{},[19,2954,267],{},[19,2956,271],{},[98,2958,275],{},[72,2960,279],{"id":278},[15,2962,282,2963,272],{},[19,2964,285],{},[72,2966,289],{"id":288},[95,2968,2969,2973,2977],{},[98,2970,294,2971,298],{},[19,2972,297],{},[98,2974,294,2975,304],{},[19,2976,303],{},[98,2978,307,2979,311],{},[19,2980,310],{},[72,2982,315],{"id":314},[15,2984,318],{},[24,2986],{},[27,2988,324],{"id":323},[15,2990,327,2991,331],{},[19,2992,330],{},[72,2994,335],{"id":334},[144,2996,2997,3005],{},[147,2998,2999],{},[150,3000,3001,3003],{},[153,3002,344],{},[153,3004,347],{},[160,3006,3007,3015,3023,3031,3039,3047,3055,3063],{},[150,3008,3009,3013],{},[165,3010,3011],{},[19,3012,356],{},[165,3014,359],{},[150,3016,3017,3021],{},[165,3018,3019],{},[19,3020,366],{},[165,3022,369],{},[150,3024,3025,3029],{},[165,3026,3027],{},[19,3028,376],{},[165,3030,379],{},[150,3032,3033,3037],{},[165,3034,3035],{},[19,3036,386],{},[165,3038,389],{},[150,3040,3041,3045],{},[165,3042,3043],{},[19,3044,396],{},[165,3046,399],{},[150,3048,3049,3053],{},[165,3050,3051],{},[19,3052,406],{},[165,3054,409],{},[150,3056,3057,3061],{},[165,3058,3059],{},[19,3060,416],{},[165,3062,419],{},[150,3064,3065,3069],{},[165,3066,3067],{},[19,3068,426],{},[165,3070,429],{},[72,3072,433],{"id":432},[15,3074,436],{},[95,3076,3077,3081,3085,3089],{},[98,3078,3079,444],{},[19,3080,443],{},[98,3082,3083,450],{},[19,3084,449],{},[98,3086,3087,456],{},[19,3088,455],{},[98,3090,3091,462],{},[19,3092,461],{},[24,3094],{},[27,3096,468],{"id":467},[72,3098,472],{"id":471},[15,3100,475,3101,479],{},[19,3102,478],{},[72,3104,483],{"id":482},[15,3106,486,3107,490],{},[19,3108,489],{},[50,3110,3111],{},[15,3112,3113,498,3115,502],{},[19,3114,497],{},[19,3116,501],{},[72,3118,506],{"id":505},[144,3120,3121,3129],{},[147,3122,3123],{},[150,3124,3125,3127],{},[153,3126,515],{},[153,3128,518],{},[160,3130,3131,3137,3143,3149,3155,3161,3167],{},[150,3132,3133,3135],{},[165,3134,525],{},[165,3136,528],{},[150,3138,3139,3141],{},[165,3140,533],{},[165,3142,536],{},[150,3144,3145,3147],{},[165,3146,541],{},[165,3148,544],{},[150,3150,3151,3153],{},[165,3152,549],{},[165,3154,552],{},[150,3156,3157,3159],{},[165,3158,557],{},[165,3160,560],{},[150,3162,3163,3165],{},[165,3164,565],{},[165,3166,568],{},[150,3168,3169,3171],{},[165,3170,573],{},[165,3172,576],{},[50,3174,3175],{},[15,3176,3177,234,3179,586,3181,590],{},[19,3178,233],{},[19,3180,585],{},[19,3182,589],{},[24,3184],{},[27,3186,596],{"id":595},[15,3188,599,3189,272],{},[19,3190,602],{},[72,3192,606],{"id":605},[15,3194,609,3195,613],{},[19,3196,612],{},[615,3198,3199,3203,3207],{},[98,3200,619,3201,623],{},[19,3202,622],{},[98,3204,619,3205,629],{},[19,3206,628],{},[98,3208,3209,635],{},[19,3210,634],{},[72,3212,639],{"id":638},[95,3214,3215,3219,3223],{},[98,3216,644,3217,272],{},[19,3218,647],{},[98,3220,650,3221,654],{},[19,3222,653],{},[98,3224,657],{},[24,3226],{},[27,3228,663],{"id":662},[15,3230,666,3231,670],{},[19,3232,669],{},[72,3234,674],{"id":673},[95,3236,3237,3239,3241,3243],{},[98,3238,679],{},[98,3240,682],{},[98,3242,685],{},[98,3244,688],{},[72,3246,692],{"id":691},[95,3248,3249,3251,3253],{},[98,3250,697],{},[98,3252,700],{},[98,3254,703],{},[72,3256,707],{"id":706},[95,3258,3259,3261,3263],{},[98,3260,712],{},[98,3262,715],{},[98,3264,718],{},[72,3266,722],{"id":721},[144,3268,3269,3277],{},[147,3270,3271],{},[150,3272,3273,3275],{},[153,3274,731],{},[153,3276,734],{},[160,3278,3279,3285,3291,3297,3303,3309],{},[150,3280,3281,3283],{},[165,3282,741],{},[165,3284,744],{},[150,3286,3287,3289],{},[165,3288,749],{},[165,3290,752],{},[150,3292,3293,3295],{},[165,3294,757],{},[165,3296,760],{},[150,3298,3299,3301],{},[165,3300,765],{},[165,3302,768],{},[150,3304,3305,3307],{},[165,3306,773],{},[165,3308,776],{},[150,3310,3311,3313],{},[165,3312,781],{},[165,3314,784],{},[24,3316],{},[27,3318,790],{"id":789},[144,3320,3321,3329],{},[147,3322,3323],{},[150,3324,3325,3327],{},[153,3326,799],{},[153,3328,802],{},[160,3330,3331,3337,3343,3349,3355],{},[150,3332,3333,3335],{},[165,3334,809],{},[165,3336,812],{},[150,3338,3339,3341],{},[165,3340,817],{},[165,3342,820],{},[150,3344,3345,3347],{},[165,3346,825],{},[165,3348,828],{},[150,3350,3351,3353],{},[165,3352,833],{},[165,3354,836],{},[150,3356,3357,3359],{},[165,3358,841],{},[165,3360,844],{},[24,3362],{},[27,3364,850],{"id":849},[95,3366,3367,3371,3375,3379],{},[98,3368,3369],{},[856,3370,859],{"href":858},[98,3372,3373],{},[856,3374,865],{"href":864},[98,3376,3377],{},[856,3378,871],{"href":870},[98,3380,3381],{},[856,3382,877],{"href":876},[24,3384],{},[15,3386,3387],{},[883,3388,885,3389,889,3391],{},[19,3390,888],{},[856,3392,893],{"href":892},{"title":895,"searchDepth":896,"depth":896,"links":3394},[3395,3396,3401,3409,3413,3418,3422,3428,3429],{"id":29,"depth":896,"text":30},{"id":62,"depth":896,"text":63,"children":3397},[3398,3399,3400],{"id":74,"depth":902,"text":75},{"id":81,"depth":902,"text":82},{"id":92,"depth":902,"text":93},{"id":134,"depth":896,"text":135,"children":3402},[3403,3404,3405,3406,3407,3408],{"id":141,"depth":902,"text":142},{"id":189,"depth":902,"text":190},{"id":241,"depth":902,"text":242},{"id":278,"depth":902,"text":279},{"id":288,"depth":902,"text":289},{"id":314,"depth":902,"text":315},{"id":323,"depth":896,"text":324,"children":3410},[3411,3412],{"id":334,"depth":902,"text":335},{"id":432,"depth":902,"text":433},{"id":467,"depth":896,"text":468,"children":3414},[3415,3416,3417],{"id":471,"depth":902,"text":472},{"id":482,"depth":902,"text":483},{"id":505,"depth":902,"text":506},{"id":595,"depth":896,"text":596,"children":3419},[3420,3421],{"id":605,"depth":902,"text":606},{"id":638,"depth":902,"text":639},{"id":662,"depth":896,"text":663,"children":3423},[3424,3425,3426,3427],{"id":673,"depth":902,"text":674},{"id":691,"depth":902,"text":692},{"id":706,"depth":902,"text":707},{"id":721,"depth":902,"text":722},{"id":789,"depth":896,"text":790},{"id":849,"depth":896,"text":850},{},{"title":5,"description":936},[949,950,21,951,952,953,954],{"id":3434,"title":3435,"articleId":6,"body":3436,"category":934,"date":935,"description":4330,"extension":937,"lastUpdated":938,"locale":4331,"meta":4332,"navigation":941,"path":4333,"publishDate":935,"readTime":943,"refreshInterval":944,"seo":4334,"slug":4335,"stem":4336,"tags":4337,"__hash__":4343},"blog\u002Fblog\u002Fold-building-arei-part8.nl.md","Oudere installaties en AREI Part 8: Bijzondere regels voor bestaande installaties",{"type":8,"value":3437,"toc":4293},[3438,3441,3447,3449,3453,3460,3471,3479,3481,3485,3492,3496,3499,3503,3510,3514,3540,3548,3550,3554,3557,3561,3598,3602,3638,3650,3654,3657,3687,3691,3697,3701,3722,3726,3729,3731,3735,3742,3746,3840,3844,3847,3873,3875,3879,3883,3890,3894,3901,3913,3917,3986,4001,4003,4007,4014,4018,4025,4046,4050,4068,4070,4074,4081,4085,4099,4103,4114,4118,4129,4133,4188,4190,4194,4248,4250,4254,4280,4282],[11,3439,3435],{"id":3440},"oudere-installaties-en-arei-part-8-bijzondere-regels-voor-bestaande-installaties",[15,3442,3443,3444,3446],{},"Niet elke elektrische installatie in België moet aan de nieuwste AREI-voorschriften voldoen. Voor oudere gebouwen bestaat er met ",[19,3445,970],{}," een apart regelwerk dat bepaalde afwijkingen van de huidige standaard tolereert — zolang er geen onmiddellijk gevaar bestaat. Dit artikel legt uit wanneer Part 8 geldt, wat toegelaten is en waar de grenzen liggen.",[24,3448],{},[27,3450,3452],{"id":3451},"wat-is-part-8","Wat is Part 8?",[15,3454,3455,3456,3459],{},"Part 8 van het AREI (Algemeen Reglement op de Elektrische Installaties) is een ",[19,3457,3458],{},"bijzondere regeling voor bestaande installaties"," die vóór de inwerkingtreding van het huidige AREI werden aangelegd en gekeurd.",[15,3461,3462,3463,3466,3467,3470],{},"Het basisprincipe: zolang een installatie ",[19,3464,3465],{},"veilig"," functioneert en ",[19,3468,3469],{},"geen onmiddellijk gevaar"," vormt, hoeft ze niet volledig op de nieuwste stand gebracht te worden — ook al voldoet ze niet aan alle huidige voorschriften.",[50,3472,3473],{},[15,3474,3475,3478],{},[19,3476,3477],{},"Belangrijk:"," Part 8 is geen vrijbrief. Het definieert duidelijk welke afwijkingen getolereerd worden en welke niet.",[24,3480],{},[27,3482,3484],{"id":3483},"wanneer-geldt-part-8","Wanneer geldt Part 8?",[15,3486,3487,3488,3491],{},"Part 8 geldt voor installaties die aan ",[19,3489,3490],{},"één"," van de volgende voorwaarden voldoen:",[72,3493,3495],{"id":3494},"voorwaarde-1-installatie-vóór-01101981","Voorwaarde 1: Installatie vóór 01.10.1981",[15,3497,3498],{},"Installaties die vóór 1 oktober 1981 werden aangelegd (datum van inwerkingtreding van het oorspronkelijke AREI) vallen in principe onder Part 8.",[72,3500,3502],{"id":3501},"voorwaarde-2-onder-het-oude-arei-gekeurd","Voorwaarde 2: Onder het oude AREI gekeurd",[15,3504,3505,3506,3509],{},"Installaties die onder een eerdere versie van het AREI werden gekeurd en sindsdien ",[19,3507,3508],{},"niet wezenlijk gewijzigd"," zijn.",[72,3511,3513],{"id":3512},"wat-telt-als-wezenlijke-wijziging","Wat telt als \"wezenlijke wijziging\"?",[95,3515,3516,3522,3528,3534],{},[98,3517,3518,3519],{},"Toevoegen van ",[19,3520,3521],{},"nieuwe kringen",[98,3523,3524,3525],{},"Uitbreiding van de ",[19,3526,3527],{},"verdeelkast",[98,3529,3530,3531],{},"Wijziging van de ",[19,3532,3533],{},"meterinstallatie",[98,3535,3536,3537],{},"Omvangrijke ",[19,3538,3539],{},"herbekabeling",[50,3541,3542],{},[15,3543,3544,3547],{},[19,3545,3546],{},"Let op:"," Kleine wijzigingen zoals het vervangen van een stopcontact of schakelaar gelden NIET als wezenlijke wijziging.",[24,3549],{},[27,3551,3553],{"id":3552},"wat-is-onder-part-8-toegelaten-getolereerde-afwijkingen","Wat is onder Part 8 toegelaten? (Getolereerde afwijkingen)",[15,3555,3556],{},"De volgende punten wijken af van het huidige AREI, maar worden onder Part 8 bij de keuring getolereerd:",[72,3558,3560],{"id":3559},"_1-oude-kabeltypes","1. Oude kabeltypes",[144,3562,3563,3573],{},[147,3564,3565],{},[150,3566,3567,3570],{},[153,3568,3569],{},"Huidig AREI",[153,3571,3572],{},"Part 8 tolereert",[160,3574,3575,3582,3590],{},[150,3576,3577,3579],{},[165,3578,1104],{},[165,3580,3581],{},"VOB-kabels in oude leidingen",[150,3583,3584,3587],{},[165,3585,3586],{},"Cca-brandveiligheidsklasse",[165,3588,3589],{},"Oudere kabeltypes zonder CPR-classificatie",[150,3591,3592,3595],{},[165,3593,3594],{},"Minimale doorsnede 2,5 mm² voor stopcontacten",[165,3596,3597],{},"Minimaal 1 mm² bij max. 6 A zekering of 10 A automaat (Art. 8.2.1 Nr. 5)",[72,3599,3601],{"id":3600},"_2-aardlekschakelaars-rcd-differentieelschakelaar","2. Aardlekschakelaars (RCD \u002F Differentieelschakelaar)",[144,3603,3604,3612],{},[147,3605,3606],{},[150,3607,3608,3610],{},[153,3609,3569],{},[153,3611,3572],{},[160,3613,3614,3622,3630],{},[150,3615,3616,3619],{},[165,3617,3618],{},"30 mA RCD per stopcontactkring",[165,3620,3621],{},"Geen 30 mA RCD nodig (alleen 300 mA hoofd-RCD)",[150,3623,3624,3627],{},[165,3625,3626],{},"30 mA RCD voor badkamer verplicht",[165,3628,3629],{},"Blijft verplicht (niet gedekt door de Part 8-afwijking, Art. 4.2.4.3 b nr. 3 \u002F Art. 7.1.4.3)",[150,3631,3632,3635],{},[165,3633,3634],{},"Max. 8 kringen per RCD",[165,3636,3637],{},"Meer kringen toegelaten",[50,3639,3640],{},[15,3641,3642,3645,3646,3649],{},[19,3643,3644],{},"Opmerking:"," Ook onder Part 8 wordt een ",[19,3647,3648],{},"300 mA hoofd-RCD"," aanbevolen en bij nieuwe meterinstallatie vaak door de netbeheerder vereist.",[72,3651,3653],{"id":3652},"_3-stopcontacten-zonder-aardingcontact","3. Stopcontacten zonder aardingcontact",[15,3655,3656],{},"Oude stopcontacten (type C, zonder aardpen) worden onder Part 8 getolereerd, op voorwaarde dat:",[95,3658,3659,3666,3673,3684],{},[98,3660,3661,3662,3665],{},"Het stopcontact beschermd wordt door een ",[19,3663,3664],{},"differentieelschakelaar met hoge of zeer hoge gevoeligheid"," (max. 30 mA) (Art. 8.2.1 nr. 6 letter b).",[98,3667,3668,3669,3672],{},"Geen toestellen van ",[19,3670,3671],{},"beschermingsklasse I"," (met metalen behuizing) worden aangesloten.",[98,3674,3675,3676,3679,3680,3683],{},"Het stopcontact niet in de ",[19,3677,3678],{},"badkamer"," of op ",[19,3681,3682],{},"vochtige plaatsen"," zit.",[98,3685,3686],{},"De kring verder intact is.",[72,3688,3690],{"id":3689},"_4-geen-spd-overspanningsbeveiliging","4. Geen SPD (overspanningsbeveiliging)",[15,3692,3693,3694,272],{},"Het huidige AREI schrijft voor nieuwe installaties een SPD (Surge Protection Device) Type 2 voor. Onder Part 8 is dit ",[19,3695,3696],{},"niet vereist",[72,3698,3700],{"id":3699},"_5-oude-verdeeltechniek","5. Oude verdeeltechniek",[95,3702,3703,3709,3715],{},[98,3704,3705,3708],{},[19,3706,3707],{},"Smeltzekeringen"," in plaats van MCBs zijn toegelaten.",[98,3710,3711,3714],{},[19,3712,3713],{},"Schroefzekeringen"," (Diazed) worden getolereerd.",[98,3716,3717,3718,3721],{},"Ontbrekende ",[19,3719,3720],{},"opschriften"," worden als gebrek vermeld, maar leiden niet tot afkeuring.",[72,3723,3725],{"id":3724},"_6-geen-brandveiligheidsclassificatie-van-kabels","6. Geen brandveiligheidsclassificatie van kabels",[15,3727,3728],{},"Kabels zonder CPR-classificatie (vóór 2017 geïnstalleerd) worden getolereerd, aangezien de CPR-verordening pas vanaf juli 2017 voor nieuwe installaties geldt.",[24,3730],{},[27,3732,3734],{"id":3733},"wat-is-niet-toegelaten-ook-onder-part-8","Wat is NIET toegelaten (ook onder Part 8)?",[15,3736,3737,3738,3741],{},"Bepaalde toestanden worden ",[19,3739,3740],{},"nooit getolereerd",", ongeacht de ouderdom van de installatie:",[72,3743,3745],{"id":3744},"absoluut-ongeoorloofd","Absoluut ongeoorloofd:",[144,3747,3748,3758],{},[147,3749,3750],{},[150,3751,3752,3755],{},[153,3753,3754],{},"Toestand",[153,3756,3757],{},"Waarom?",[160,3759,3760,3770,3780,3790,3800,3810,3820,3830],{},[150,3761,3762,3767],{},[165,3763,3764],{},[19,3765,3766],{},"Blote of beschadigde kabels",[165,3768,3769],{},"Onmiddellijk elektrocutiegevaar",[150,3771,3772,3777],{},[165,3773,3774],{},[19,3775,3776],{},"Volledig ontbrekende aarding",[165,3778,3779],{},"Geen bescherming bij isolatiefout",[150,3781,3782,3787],{},[165,3783,3784],{},[19,3785,3786],{},"Water in contact met elektriciteit",[165,3788,3789],{},"Levensgevaar",[150,3791,3792,3797],{},[165,3793,3794],{},[19,3795,3796],{},"Toegankelijke spanningvoerende delen",[165,3798,3799],{},"Direct aanrakingsrisico",[150,3801,3802,3807],{},[165,3803,3804],{},[19,3805,3806],{},"Oververhitte kabels of verbindingen",[165,3808,3809],{},"Brandgevaar",[150,3811,3812,3817],{},[165,3813,3814],{},[19,3815,3816],{},"Losse verbindingen in aftakdozen",[165,3818,3819],{},"Vlamboog-\u002Fbrandgevaar",[150,3821,3822,3827],{},[165,3823,3824],{},[19,3825,3826],{},"Aftakdozen zonder deksel",[165,3828,3829],{},"Aanrakingsbescherming ontbreekt",[150,3831,3832,3837],{},[165,3833,3834],{},[19,3835,3836],{},"Badkamer-stopcontact in zone 0 of 1",[165,3838,3839],{},"Levensgevaar, ook onder Part 8 verboden",[72,3841,3843],{"id":3842},"veiligheidsgerelateerde-minimumvereisten","Veiligheidsgerelateerde minimumvereisten:",[15,3845,3846],{},"Ook onder Part 8 moet gewaarborgd zijn:",[95,3848,3849,3855,3861,3867],{},[98,3850,3851,3854],{},[19,3852,3853],{},"Voldoende doorsnede"," voor de werkelijke belasting (geen overbelast 0,75 mm²-kabel).",[98,3856,3857,3860],{},[19,3858,3859],{},"Werkende zekeringen"," (geen \"overbrugde\" zekeringen).",[98,3862,3863,3866],{},[19,3864,3865],{},"Aarding van de hoofdverdeler"," (verbinding met aardingselektrode).",[98,3868,3869,3872],{},[19,3870,3871],{},"Toegankelijkheid"," van de verdeelkast.",[24,3874],{},[27,3876,3878],{"id":3877},"periodieke-keuring","Periodieke keuring",[72,3880,3882],{"id":3881},"elke-25-jaar-verplicht","Elke 25 jaar verplicht",[15,3884,3885,3886,3889],{},"Bestaande installaties onder Part 8 moeten elke ",[19,3887,3888],{},"25 jaar"," een periodieke keuring ondergaan door een erkend controleorganisme.",[72,3891,3893],{"id":3892},"bij-eigendomsoverdracht","Bij eigendomsoverdracht",[15,3895,3896,3897,3900],{},"Bij ",[19,3898,3899],{},"verkoop van een woning"," is een geldig keuringsattest (minder dan 25 jaar oud) verplicht. Ontbreekt dit, dan moet vóór de verkoop een keuring plaatsvinden.",[50,3902,3903],{},[15,3904,3905,3908,3909,3912],{},[19,3906,3907],{},"18-maandentermijn (Art. 8.4.2.2):"," Bij aankoop van een woning met een negatief keuringsverslag heeft de koper ",[19,3910,3911],{},"18 maanden"," vanaf de aankoopdatum om de gebreken te verhelpen en een herkeuring te laten uitvoeren.",[72,3914,3916],{"id":3915},"wat-wordt-bij-de-periodieke-keuring-gecontroleerd","Wat wordt bij de periodieke keuring gecontroleerd?",[144,3918,3919,3929],{},[147,3920,3921],{},[150,3922,3923,3926],{},[153,3924,3925],{},"Controlepunt",[153,3927,3928],{},"Beoordeling",[160,3930,3931,3939,3947,3954,3962,3970,3978],{},[150,3932,3933,3936],{},[165,3934,3935],{},"Visuele inspectie kabels en verbindingen",[165,3937,3938],{},"Beschadiging, oververhitting",[150,3940,3941,3944],{},[165,3942,3943],{},"Aardingsweerstand meten",[165,3945,3946],{},"≤ 30 Ω (reglementaire drempel conform Art. 4.2.4.3b; daarboven bijkomende beschermingsmaatregelen nodig)",[150,3948,3949,3952],{},[165,3950,3951],{},"Isolatieweerstand meten",[165,3953,544],{},[150,3955,3956,3959],{},[165,3957,3958],{},"RCD-test (indien aanwezig)",[165,3960,3961],{},"Uitschakeltijd en -stroom",[150,3963,3964,3967],{},[165,3965,3966],{},"Kortsluitbeveiliging controleren",[165,3968,3969],{},"Zekeringen \u002F MCBs aanwezig",[150,3971,3972,3975],{},[165,3973,3974],{},"Bescherming tegen direct aanraken",[165,3976,3977],{},"Afdekkingen, IP-bescherming",[150,3979,3980,3983],{},[165,3981,3982],{},"Documentatie",[165,3984,3985],{},"Éénlijnschema + situatieschema aanwezig?",[50,3987,3988],{},[15,3989,3990,3992,3993,3996,3997,4000],{},[19,3991,3644],{}," Ook onder Part 8 moeten een ",[19,3994,3995],{},"éénlijnschema"," en een ",[19,3998,3999],{},"situatieschema"," aanwezig zijn — ook als deze achteraf moeten worden opgesteld.",[24,4002],{},[27,4004,4006],{"id":4005},"de-besmettingsregel-bij-gedeeltelijke-renovatie","De besmettingsregel bij gedeeltelijke renovatie",[15,4008,4009,4010,4013],{},"Een bijzonder belangrijk aspect bij oudere gebouwen: de zogenaamde ",[19,4011,4012],{},"besmettingsregel"," (contamination rule).",[72,4015,4017],{"id":4016},"hoe-werkt-het","Hoe werkt het?",[15,4019,4020,4021,4024],{},"Wanneer u een deel van uw installatie ",[19,4022,4023],{},"wezenlijk wijzigt"," (bijv. nieuwe kringen toevoegen), geldt:",[615,4026,4027,4034,4040],{},[98,4028,4029,4030,4033],{},"Het ",[19,4031,4032],{},"nieuwe deel"," moet volledig voldoen aan het huidige AREI.",[98,4035,4029,4036,4039],{},[19,4037,4038],{},"bestaande deel"," wordt verder beoordeeld volgens Part 8.",[98,4041,4042,4045],{},[19,4043,4044],{},"MAAR:"," Als het nieuwe deel het bestaande deel \"besmet\" (bijv. nieuwe kabels in dezelfde verdeelkast), kan de controleur beslissen dat de hele verdeelkast aan het huidige AREI moet voldoen.",[72,4047,4049],{"id":4048},"praktische-gevolgen","Praktische gevolgen:",[95,4051,4052,4058,4065],{},[98,4053,4054,4055,3509],{},"Plan renovaties zo dat nieuwe en oude delen ",[19,4056,4057],{},"duidelijk gescheiden",[98,4059,4060,4061,4064],{},"Idealiter een ",[19,4062,4063],{},"aparte onderverdeler"," voor nieuwe kringen.",[98,4066,4067],{},"Documenteer precies wat oud en wat nieuw is.",[24,4069],{},[27,4071,4073],{"id":4072},"aanbeveling-stapsgewijze-modernisering","Aanbeveling: Stapsgewijze modernisering",[15,4075,4076,4077,4080],{},"Hoewel Part 8 afwijkingen tolereert, is een ",[19,4078,4079],{},"stapsgewijze modernisering"," aan te raden:",[72,4082,4084],{"id":4083},"prioriteit-1-veiligheidskritisch","Prioriteit 1 (Veiligheidskritisch)",[95,4086,4087,4090,4093,4096],{},[98,4088,4089],{},"300 mA hoofd-RCD bijplaatsen (indien niet aanwezig)",[98,4091,4092],{},"Beschadigde kabels vervangen",[98,4094,4095],{},"Losse verbindingen herstellen",[98,4097,4098],{},"Aarding controleren en eventueel verbeteren",[72,4100,4102],{"id":4101},"prioriteit-2-aanbevolen","Prioriteit 2 (Aanbevolen)",[95,4104,4105,4108,4111],{},[98,4106,4107],{},"30 mA groeps-RCDs voor badkamer en keuken",[98,4109,4110],{},"Oude smeltzekeringen vervangen door MCBs",[98,4112,4113],{},"SPD Type 2 bijplaatsen",[72,4115,4117],{"id":4116},"prioriteit-3-comfort-toekomstbestendigheid","Prioriteit 3 (Comfort + toekomstbestendigheid)",[95,4119,4120,4123,4126],{},[98,4121,4122],{},"Verdeelkast moderniseren (meer rijen, opschriften)",[98,4124,4125],{},"Stopcontacten met aarding bijplaatsen",[98,4127,4128],{},"Voorbereiding voor laadpaal \u002F zonnepanelen",[72,4130,4132],{"id":4131},"kostenoriëntatie","Kostenoriëntatie",[144,4134,4135,4145],{},[147,4136,4137],{},[150,4138,4139,4142],{},[153,4140,4141],{},"Maatregel",[153,4143,4144],{},"Geschatte kosten",[160,4146,4147,4154,4161,4167,4174,4181],{},[150,4148,4149,4152],{},[165,4150,4151],{},"300 mA hoofd-RCD bijplaatsen",[165,4153,744],{},[150,4155,4156,4159],{},[165,4157,4158],{},"30 mA groeps-RCD (per stuk)",[165,4160,752],{},[150,4162,4163,4165],{},[165,4164,2603],{},[165,4166,760],{},[150,4168,4169,4172],{},[165,4170,4171],{},"MCB-set (10 stuks)",[165,4173,768],{},[150,4175,4176,4179],{},[165,4177,4178],{},"Nieuwe 4-rijige verdeelkast (compleet)",[165,4180,776],{},[150,4182,4183,4186],{},[165,4184,4185],{},"Volledige herbekabeling (EGW)",[165,4187,784],{},[24,4189],{},[27,4191,4193],{"id":4192},"samenvatting","Samenvatting",[144,4195,4196,4206],{},[147,4197,4198],{},[150,4199,4200,4203],{},[153,4201,4202],{},"Vraag",[153,4204,4205],{},"Antwoord",[160,4207,4208,4216,4224,4232,4240],{},[150,4209,4210,4213],{},[165,4211,4212],{},"Moet mijn oud gebouw aan het huidige AREI voldoen?",[165,4214,4215],{},"Niet volledig, Part 8 staat afwijkingen toe",[150,4217,4218,4221],{},[165,4219,4220],{},"Heb ik een 30 mA RCD nodig?",[165,4222,4223],{},"Onder Part 8 niet verplicht, maar sterk aanbevolen",[150,4225,4226,4229],{},[165,4227,4228],{},"Zijn oude stopcontacten zonder aarding toegelaten?",[165,4230,4231],{},"Onder voorwaarden ja (geen badkamer, geen klasse-I-toestellen)",[150,4233,4234,4237],{},[165,4235,4236],{},"Hoe vaak moet er gekeurd worden?",[165,4238,4239],{},"Elke 25 jaar + bij eigendomsoverdracht",[150,4241,4242,4245],{},[165,4243,4244],{},"Wat bij gedeeltelijke renovatie?",[165,4246,4247],{},"Nieuw deel = huidig AREI, oud deel = Part 8 (besmettingsregel in acht nemen)",[24,4249],{},[27,4251,4253],{"id":4252},"gerelateerde-artikelen","Gerelateerde artikelen",[95,4255,4256,4262,4268,4274],{},[98,4257,4258],{},[856,4259,4261],{"href":4260},"\u002Fblog\u002Felektrische-keuring","Elektrische keuring in België: Wat wordt gecontroleerd?",[98,4263,4264],{},[856,4265,4267],{"href":4266},"\u002Fblog\u002Farei-2026-wijzigingen","Wat verandert er met het AREI 2026?",[98,4269,4270],{},[856,4271,4273],{"href":4272},"\u002Fblog\u002Fpreflex-vs-vrije-bedrading","Preflex vs. vrije bedrading",[98,4275,4276],{},[856,4277,4279],{"href":4278},"\u002Fblog\u002Fverdeelkast-plannen-opbouw","Verdeelkast plannen",[24,4281],{},[15,4283,4284],{},[883,4285,4286,4287,4289,4290],{},"Ook voor oudere gebouwen helpt ",[19,4288,888],{}," om éénlijnschema en situatieschema digitaal op te bouwen. De zelfcontrole is indicatief; laat de documenten en toepasselijke afwijkingen professioneel beoordelen. ",[856,4291,4292],{"href":892},"Gratis starten →",{"title":895,"searchDepth":896,"depth":896,"links":4294},[4295,4296,4301,4309,4313,4318,4322,4328,4329],{"id":3451,"depth":896,"text":3452},{"id":3483,"depth":896,"text":3484,"children":4297},[4298,4299,4300],{"id":3494,"depth":902,"text":3495},{"id":3501,"depth":902,"text":3502},{"id":3512,"depth":902,"text":3513},{"id":3552,"depth":896,"text":3553,"children":4302},[4303,4304,4305,4306,4307,4308],{"id":3559,"depth":902,"text":3560},{"id":3600,"depth":902,"text":3601},{"id":3652,"depth":902,"text":3653},{"id":3689,"depth":902,"text":3690},{"id":3699,"depth":902,"text":3700},{"id":3724,"depth":902,"text":3725},{"id":3733,"depth":896,"text":3734,"children":4310},[4311,4312],{"id":3744,"depth":902,"text":3745},{"id":3842,"depth":902,"text":3843},{"id":3877,"depth":896,"text":3878,"children":4314},[4315,4316,4317],{"id":3881,"depth":902,"text":3882},{"id":3892,"depth":902,"text":3893},{"id":3915,"depth":902,"text":3916},{"id":4005,"depth":896,"text":4006,"children":4319},[4320,4321],{"id":4016,"depth":902,"text":4017},{"id":4048,"depth":902,"text":4049},{"id":4072,"depth":896,"text":4073,"children":4323},[4324,4325,4326,4327],{"id":4083,"depth":902,"text":4084},{"id":4101,"depth":902,"text":4102},{"id":4116,"depth":902,"text":4117},{"id":4131,"depth":902,"text":4132},{"id":4192,"depth":896,"text":4193},{"id":4252,"depth":896,"text":4253},"Wat geldt voor oudere elektrische installaties in België. AREI Part 8 uitgelegd: toegelaten afwijkingen, periodieke keuring en tips voor stapsgewijze modernisering.","nl",{},"\u002Fblog\u002Fold-building-arei-part8.nl",{"title":3435,"description":4330},"oud-arei-part-8","blog\u002Fold-building-arei-part8.nl",[4338,1866,1867,4339,4340,4341,4342],"oudere installatie","bestaande installatie","renovatie","keuring","periodiek","Q2-L9YGyEVSXHJVXrrZFxrVWaA4pAqO0a7-HzjHgkHo",1787555256577]